1.3_Drawings-CIVIL_1_of_4.pdf
PDF 5 MB Posted
- Attached to
- C-17 Refueling Hydrant System Ramp Expansion
- Solicitation number
- W91242-18-R-0002
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
DPIV PIV
S
T
P
G
S
G
S S
S
S
C E
S
EOI
D
D
D
E
T
T
SPSP
D
D
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
1 STORY
BLOCK
BUILDING
MONITORING
WELL (TYP)
D D
EXISTING
MOORING
POINT (TYP)
T
S
S
D
H
ER
C U
LE
S
BL
VD
H
ER
C U
LES BLVD
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
N
B1 CONSTRUCTION - PHASE 1
SCALE: 1"=100' 100' 200'0
AD
FUTURE HANGAR
BY OTHERS
PHASE 1 - DEMOLISH EXISTING
ACCESS ROAD AND INSTALL ALL
ASSOCIATED UNDERGROUND
FUELING AND MISCELLANEOUS
UTILITIES. GRADE TO APPROPRIATE
ELEVATIONS REQUIRED FOR NEW
ACCESS ROAD CONSTRUCTION
PHASE 1 - DEMOLISH EXISTING
STORAGE YARD ASPHALT AND
MISCELLANEOUS STRUCTURES
PHASE 1 - APRON EXPANSION
DEMOLISH THE EXISTING BLAST FENCE CONCRETE FOUNDATION
AND ASPHALT SHOULDER AND GRADE TO APPROPRIATE
ELEVATIONS REQUIRED FOR NEW PAVEMENT INSTALLATION.
CONSTRUCTION - PHASE 1 NOTES:
1. SEE DRAWING GC004 AND GC005 FOR ACCESS AND SAFETY NOTES AND ACCESS AND SAFETY
PLAN.
2. BID OPTION CONSTRUCTION ACCESS OR BASE BID. CONTRACTOR SHALL DELINEATE A
CONSTRUCTION ZONE OR WORK AREA AROUND THE PROJECT PERIMETER FOR THE ENTIRE
DURATION OF CONSTRUCTION BY USE OF EXISTING FENCES OR NEW FENCES MEETING THE
STANDARDS FOR THE NORTH CAROLINA AIR NATIONAL GUARD AS NEEDED. SIGNAGE SHALL BE
INSTALLED ON FENCING, AND OTHER BARRICADES IN ACCORDANCE WITH SPECIFICATION
SECTION 01 50 00. CONTRACTOR IS REQUIRED TO MAINTAIN CONSTRUCTION
SAFETY/SECURITY FENCES AROUND THEIR WORK AREAS TO PROTECT AGAINST DAMAGE OR
THEFT OF MATERIALS AND EQUIPMENT.
3. ALL CLEARING, GRUBBING, AND MOWING SHALL BE COMPLETED PER REQUIREMENTS OF
CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT AND THE NORTH CAROLINA AIR NATIONAL
GUARD AND SHALL BE MAINTAINED THROUGHOUT THE CONTRACT DURATION.
4. CONTRACTOR SHALL NOT CROSS ESTABLISHED AIRFIELD SECURITY PERIMETER FENCE
WITHOUT COORDINATING WITH BASE SECURITY AND AIRFIELD OPERATIONS.
5. CONTRACTOR'S SHALL MAINTAIN ADEQUATE ACCESS FOR SEMI-TRUCK DELIVERIES AND
PERSONNEL TO ALL EXISTING SITE FACILITIES THROUGHOUT CONSTRUCTION.
PHASE 1 - BID OPTION
GRADE TO APPROPRIATE
ELEVATIONS REQUIRED FOR
NEW PAVEMENT INSTALLATION
LEGEND
PHASE 1
WORK AREAS
PHASE 1
BID OPTION
PHASE 1 - CONSTRUCT BBL TANK
WITH CONTAINMENT AND
RETAINING WALL. SEE MECHANICAL
DRAWINGS FOR DETAILED FUEL
SYSTEM SEQUENCING.
LOW PROFILE
BARRICADESGC501
B3
LOW PROFILE
BARRICADES
GC501
B3
12/02/16 D.MUETING
A.DORMAN R.BARUTH
CONSTRUCTION - PHASE 1
GC001 0
FJRP159073-GC001.dwg
S
T
P
G
S
G
S S
S
S
C E
S
EOI
D
D
D
E
T
T
SPSP
D
D
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
1 STORY
BLOCK
BUILDING
MONITORING
WELL (TYP)
D D
EXISTING
MOORING
POINT (TYP)
T
S
S
D
H
ER
C U
LE
S
BL
VD
H
ER
C U
LES BLVD
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
N
B1 CONSTRUCTION - PHASE 2
SCALE: 1"=100' 100' 200'0
LEGEND
PHASE 2
WORK AREAS
PHASE 2
BID OPTION
FUTURE HANGAR
BY OTHERS
PHASE 2 - BID OPTION
MILL AND OVERLAY EXISTING
ASPHALT SHOULDER.
PHASE 2 - INSTALL THREE
HYDRANT PITS AND JET
FUEL LINE ALONG THE
WEST ALPHA ONE, TWO,
AND THREE PARKING
POSITIONS ON THE APRON.
REPLACE CONCRETE
PAVEMENT.
PHASE 2 - BID OPTION
CONSTRUCT PAVEMENT
FOR BLAST FENCE AND
INSTALL BLAST FENCE.
PHASE 2 - INSTALL NEW
10-INCH JET FUEL
RETURN LINE FROM THE
NEW PUMP SHELTER TO
THE AIRFIELD APRON.
PHASE 2 - CONSTRUCT
NEW CONCRETE APRON
PAVEMENT AND
SHOULDER EXPANSION.
PHASE 2 - INSTALL NEW 8" WATER
LINE AROUND PROPOSED APRON
EXPANSION AND INSTALL NEW
LOW-PROFILE FIRE HYDRANT AS
INDICATED ON UTILITY PLANS.
PHASE 2 - CONSTRUCT FUEL
PUMP HOUSE AND FUEL
TANKS AND ALL
ASSOCIATED FUELING
OPERATION SITE FEATURES.
CONSTRUCTION - PHASE 2 NOTES:
1. SEE DRAWING GC004 AND GC005 FOR ACCESS AND SAFETY NOTES AND ACCESS AND SAFETY
PLAN.
2. BID OPTION CONSTRUCTION ACCESS OR BASE BID. CONTRACTOR SHALL DELINEATE A
CONSTRUCTION ZONE OR WORK AREA AROUND THE PROJECT PERIMETER FOR THE ENTIRE
DURATION OF CONSTRUCTION BY USE OF EXISTING FENCES OR NEW FENCES MEETING THE
STANDARDS FOR THE NORTH CAROLINA AIR NATIONAL GUARD AS NEEDED. SIGNAGE SHALL BE
INSTALLED ON FENCING, AND OTHER BARRICADES IN ACCORDANCE WITH SPECIFICATION
SECTION 01 50 00. CONTRACTOR IS REQUIRED TO MAINTAIN CONSTRUCTION
SAFETY/SECURITY FENCES AROUND THEIR WORK AREAS TO PROTECT AGAINST DAMAGE OR
THEFT OF MATERIALS AND EQUIPMENT.
3. ALL CLEARING, GRUBBING, AND MOWING SHALL BE COMPLETED PER REQUIREMENTS OF
CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT AND THE NORTH CAROLINA AIR NATIONAL
GUARD AND SHALL BE MAINTAINED THROUGHOUT THE CONTRACT DURATION.
4. CONTRACTOR SHALL NOT CROSS ESTABLISHED AIRFIELD SECURITY PERIMETER FENCE
WITHOUT COORDINATING WITH BASE SECURITY AND AIRFIELD OPERATIONS.
5. CONTRACTOR'S SHALL MAINTAIN ADEQUATE ACCESS FOR SEMI-TRUCK DELIVERIES AND
PERSONNEL TO ALL EXISTING SITE FACILITIES THROUGHOUT CONSTRUCTION.
PHASE 2 - REMOVE EXISTING
PAVEMENT MARKINGS AND
APPLY TEMPORARY APRON
PAVEMENT MARKINGS.
LOW PROFILE
BARRICADESGC501
B3
LOW PROFILE
BARRICADES
GC501
B3
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
CONSTRUCTION - PHASE 2
GC002 0
FJRP159073-GC001.dwg
S
T
P
G
S
G
S S
S
S
C E
S
EOI
D
D
D
E
T
T
SPSP
D
D
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
1 STORY
BLOCK
BUILDING
MONITORING
WELL (TYP)
D D
EXISTING
MOORING
POINT (TYP)
T
S
S
D
H
ER
C U
LE
S
BL
VD
H
ER
C U
LES BLVD
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
11/02/16 D.MUETING
A.DORMAN R.BARUTH
CONSTRUCTION - PHASE 3
GC003 0
FJRP159073-GC001.dwg
N
B1 CONSTRUCTION - PHASE 3
SCALE: 1"=100' 100' 200'0
FUTURE HANGAR
BY OTHERS
LEGEND
PHASE 3
WORK AREAS
PHASE 3
BID OPTION
PHASE 3 - CONTINUE TO CONSTRUCT
FUEL PUMP HOUSE AND FUEL TANKS
AND ALL ASSOCIATED FUELING
OPERATION SITE FEATURES.
PHASE 3 (TYP) - FINALIZE
APRON STRIPING ONCE
ALL SITE WORK HAS BEEN
COMPLETED.
PHASE 3 - REPLACE
CONCRETE APRON
PAVEMENT.
PHASE 3 - INSTALL JET
FUEL LINE FROM VALVE
VAULT TO THE EASTERN
BRAVO 2 PARKING
POSITION
CONSTRUCTION - PHASE 3 NOTES:
PHASE 3 - PAVE ACCESS ROAD
AND INSTALL APPROPRIATE
PAVEMENT MARKINGS
1. SEE DRAWING GC004 AND GC005 FOR ACCESS AND SAFETY NOTES AND ACCESS AND SAFETY
PLAN.
2. BID OPTION CONSTRUCTION ACCESS OR BASE BID. CONTRACTOR SHALL DELINEATE A
CONSTRUCTION ZONE OR WORK AREA AROUND THE PROJECT PERIMETER FOR THE ENTIRE
DURATION OF CONSTRUCTION BY USE OF EXISTING FENCES OR NEW FENCES MEETING THE
STANDARDS FOR THE NORTH CAROLINA AIR NATIONAL GUARD AS NEEDED. SIGNAGE SHALL BE
INSTALLED ON FENCING, AND OTHER BARRICADES IN ACCORDANCE WITH SPECIFICATION
SECTION 01 50 00. CONTRACTOR IS REQUIRED TO MAINTAIN CONSTRUCTION
SAFETY/SECURITY FENCES AROUND THEIR WORK AREAS TO PROTECT AGAINST DAMAGE OR
THEFT OF MATERIALS AND EQUIPMENT.
3. ALL CLEARING, GRUBBING, AND MOWING SHALL BE COMPLETED PER REQUIREMENTS OF
CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT AND THE NORTH CAROLINA AIR NATIONAL
GUARD AND SHALL BE MAINTAINED THROUGHOUT THE CONTRACT DURATION.
4. CONTRACTOR SHALL NOT CROSS ESTABLISHED AIRFIELD SECURITY PERIMETER FENCE
WITHOUT COORDINATING WITH BASE SECURITY AND AIRFIELD OPERATIONS.
5. CONTRACTOR'S SHALL MAINTAIN ADEQUATE ACCESS FOR SEMI-TRUCK DELIVERIES AND
PERSONNEL TO ALL EXISTING SITE FACILITIES THROUGHOUT CONSTRUCTION.
LOW PROFILE
BARRICADESGC501
B3
PHASE 3 - BID OPTION
INSTALL JET FUEL LINE
FROM EASTERN BRAVO 2
PARKING POSITION TO
BRAVO 1
LOW PROFILE
BARRICADES
GC501
B3
AD
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
ACCESS AND SAFETY NOTES:
1. ACCESS TO THE PROJECT FOR ALL CONTRACTOR PERSONNEL, VEHICLES,
AND EQUIPMENT IS ILLUSTRATED ON DRAWINGS. ACCESS ROUTES MAY BE
SUBJECT TO CHANGE, SCHEDULE IMPACTS SHALL BE COORDINATED WITH
THE CONTRACTING OFFICER.
2. THE EXISTING AIRPORT ROAD SPEED LIMITS AND LOAD LIMITS ARE STRICTLY
ENFORCED. ALL CONCRETE TRUCKS SHALL PUT DOWN EXTRA AXLES WHEN
TRAVELING ON AIRPORT OR BASE PROPERTY.
3. CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY PAINTED
SIGN, MEETING CONTRACTING OFFICER APPROVAL, AT THE TEMPORARY
CONSTRUCTION ENTRANCE TO DIRECT MATERIAL SUPPLIERS AND
EMPLOYEES TO THE CONSTRUCTION SITE. CONTRACTOR SHALL PROVIDE A
MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING OFFICER REGARDING
OVERSIZED OR CONSTRUCTION DELIVERIES TO THE BASE TRUCK GATE
PRIOR TO THOSE DELIVERIES. DELIVERIES SHALL BE SCHEDULED MONDAY -
FRIDAY, 0600 TO 1800. CONTRACTOR SHALL COORDINATE DELIVERIES WITH
BASE SECURITY FORCES BY SUBMISSION OF THE CORRECT ENTRY PASS
PAPERWORK VIA THE CONTRACTING OFFICER.
4. CONTRACTOR'S STAGING AREA AND POV EMPLOYEE PARKING WILL BE
LOCATED AS INDICATED ON SHEET GC005 OR AS DIRECTED BY THE
CONTRACTING OFFICER. CONTRACTOR MAY SUBMIT ALTERNATIVES TO
STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA
SHALL BE SUBJECT TO APPROVAL OF CONTRACTING OFFICER'S
REPRESENTATIVE. LOCATION OF CONTRACTOR'S STAGING AREA SHALL BE
WITHIN THE PROJECT WORK AREA. SUBMIT PROJECT OFFICE/MATERIAL
STAGING AREA REQUEST TO THE CONTRACTING OFFICER AT LEAST 30 DAYS
PRIOR TO REQUIRED OCCUPANCY DATE.
5. EXISTING AIRPORT ROADS USED AS HAUL ROADS SHALL BE MAINTAINED
SUCH THAT UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES FROM
THE ROAD TO THE STAGING AREA AND FROM THE STAGING AREA TO THE
WORK SITE AND FACILITATE GOVERNMENT ACCESS TO THE BASE AT ALL
TIMES. THE HAUL ROAD LOCATIONS SHALL BE AS INDICATED IN SHEET GC005
AND APPROVED BY THE CONTRACTING OFFICER.
6. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT
IN A MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING
ROADWAYS AT ALL TIMES WITHOUT DELAYS TO EMERGENCY VEHICLE'S
RESPONSE TIME.
7. CONTRACTOR SHALL MAINTAIN THE ACCESS ROUTE TO BE FREE FROM
DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
8. STAGING AREA AND ANY OTHER AREA DISTURBED BY CONTRACTOR DURING
CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
OF EXISTING SITE. CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND VIDEO
RECORDING OF THE SITE CONDITIONS BEFORE CONSTRUCTION WITHIN THE
PROJECT LIMITS.
9. ALL AREAS DISTURBED BY ANY CONSTRUCTION ACTIVITIES INCLUDING
BORROW AREAS, STOCKPILE AREAS, MATERIAL LAYDOWN , EQUIPMENT
PARKING, CONTRACTOR PARKING, EARTHWORK ACTIVITIES, UTILITY
TRENCHING, OVERHEAD UTILITY WORK, ETC SHALL BE RESTORED TO BETTER
THAN EXISTING CONDITIONS. ALL AREAS NOT DESIGNATED FOR PAVEMENT
OR GRAVEL SURFACING SHALL BE COVERED WITH A MINIMUM 4-INCHES OF
TOPSOIL, SEEDED, AND IRRIGATED/MAINTAINED FOR A MINIMUM OF 12
MONTHS OR UNTIL 95% COVERAGE OF GROUND COVER PER THE
SPECIFICATIONS.
10. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY NORTH
CAROLINA AIR NATIONAL GUARD SECURITY POLICE WHEN ENTERING THE
BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL ENTERING THE BASE
MUST HAVE A VALID PHOTO ID PER SECURITY REQUIREMENTS. ALL VEHICLES
ENTERING THE BASE MUST HAVE CURRENT/VALID REGISTRATION,
CURRENT/VALID INSURANCE, AND CURRENT/VALID DRIVER'S LICENSE FOR
THE OPERATOR. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE
RESPONSIBLE FOR COORDINATING WITH THE BASE SECURITY OFFICER IN
OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR TO
ENTERING SECURE AREAS.
11. MISCELLANEOUS CONTRACTOR ACCESS PROCEDURES: PERIODIC AIR FORCE
EXERCISES MAY OR MAY NOT IMPACT DAILY ENTRY PROCEDURES TO WORK
AREAS AT CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT. IN ADDITION,
ALL CONTRACTOR PERSONNEL MAY BE REQUIRED TO LEAVE AN AREA AND
REACCOMPLISH ENTRY PROCEDURES. IN THE EVENT OF AN EMERGENCY
THAT REQUIRES EVACUATION FROM THE AREA, CONTRACTOR SHALL
COMPLY WITH THE INSTRUCTIONS FROM SECURITY FORCES.
12. CONTRACTOR SHALL PROVIDE ALL NECESSARY WATER AND TOILET
FACILITIES FOR HIS WORKERS WITHIN THE CONSTRUCTION ZONE.
CONTRACTOR WORKERS SHALL NOT USE GOVERNMENT OR AIRPORT
FACILITIES UNLESS SPECIFICALLY INDICATED OTHERWISE. LOCATIONS OF
FACILITIES SHALL BE COORDINATED WITH CONTRACTING OFFICER.
13. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, THE CONTRACTOR'S
CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE PARKED WITHIN THE
WORK AREA/STAGING AREA.
14. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE CONCERNING ANY GOVERNMENT OWNED EQUIPMENT
REQUIRING RELOCATION TO COMPLETE PROJECT.
15. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION
ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER,
POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF
THE CLOSURE.
TRAFFIC CONTROL:
1. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH
COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY
VISIBLE. CONTRACTOR SHALL PROVIDE EACH VEHICLE WORKING INSIDE THE
AIRPORT SECURITY FENCE WITH A FLAG ATTACHED TO THE VEHICLE WHICH
SHOULD BE AT LEAST 3-FOOT SQUARE HAVING INTERNATIONAL ORANGE AND
WHITE CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
2. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES
TO SOUND AN ALARM WHEN MOVING IN REVERSE.
3. ONLY RUBBER-TIRE OR RUBBER-TRACKED VEHICLES WILL BE ALLOWED ON
EXISTING PAVEMENT-TO-REMAIN.
4. CONTRACTOR SHALL PROVIDE A MINIMUM 21 DAY NOTICE TO CHARLOTTE -
DOUGLAS INTERNATIONAL AIRPORT, THE NORTH CAROLINA AIR NATIONAL
GUARD, AND THE CONTRACTING OFFICER PRIOR TO ANY REQUESTED ROAD
CLOSURE. THE 21 DAY ADVANCE NOTICE DOES NOT MEAN THE REQUEST
WILL BE AUTOMATICALLY APPROVED. THE 21 DAYS PROVIDES NECESSARY
TIME FOR NORTH CAROLINA AIR NATIONAL GUARD CE TO COORDINATE AND
VERIFY IF CLOSURE IS ACCEPTABLE. CONTRACTOR SHALL WORK WITH THE
NORTH CAROLINA AIR NATIONAL GUARD CE AND CONTRACTING OFFICER TO
FINALIZE DATES IF THE AIRPORT OR BASE HAS CONFLICTS WITH OTHER
ACTIVITIES.
5. CONTRACTOR SHALL ATTEND ANY CHARLOTTE - DOUGLAS INTERNATIONAL
AIRPORT VEHICLE OPERATOR OR FOREIGN OBJECT DEBRIS (FOD) CONTROL
TRAINING COURSE.
6. CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS DEPOSITED
ONTO THE SITE, ROADS, ETC FROM CONTRACTOR'S EQUIPMENT OR
OPERATIONS. MATERIAL DROPPED WITHIN THESE AREAS SHALL BE
CONTINUOUSLY REMOVED BY SURFACE SWEEPERS OR OTHER APPROVED
METHODS DURING WORKING HOURS. CONTRACTOR TO MAINTAIN ONE FULLY
OPERATIONAL STREET SWEEPER/VAC TRUCK ON SITE AT ALL TIMES.
7. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT
MOVEMENT RESULTING FROM AIRCRAFT PROPWASH OR JET BLAST.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING AND SUBMITTING
OUTAGE REQUEST WITH NORTH CAROLINA AIR NATIONAL GUARD CE OFFICE
FOR ANY WORK BLOCKING TEN OR MORE EXISTING PARKING SPACES.
TEMPORARY CONSTRUCTION CRANE AND STOCKPILE HEIGHT:
1. TEMPORARY OBSTRUCTIONS, SUCH AS CRANES, MUST BE MARKED AND
LIGHTED IN ACCORDANCE WITH FAA AC 70/7460. ALL HAZARDOUS AREAS
(SUCH AS EXCAVATIONS OR STOCKPILED MATERIALS) ON THE AIRFIELD MUST
BE DELINEATED WITH LIGHTED BARRICADES ON ALL EXPOSED (VISIBLE OR
ACCESSIBLE) SIDES. CONTRACTOR SHALL PROVIDE ALL NECESSARY
INFORMATION TO THE NORTH CAROLINA AIR NATIONAL GUARD CE FOR
CONSTRUCTION CRANES, EQUIPMENT, AND RELATED EQUIPMENT, AND
RELATED ACTIVITIES. ALL FORMS SHALL BE APPROVED PRIOR TO USING OR
BRINGING EQUIPMENT ON SITE. NORTH CAROLINA AIR NATIONAL GUARD CE
TO SUBMIT 7460 FORMS TO FAA FOR PERMANENT BUILDING. CONTRACTOR
TO SUBMIT 7460 FORMS TO FAA FOR ALL TEMPORARY CONSTRUCTION.
2. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT
OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY FAA AC
150/5370-2F AND AC 150/5300-13A (CURRENT EDITIONS). TEMPORARY
OBSTRUCTIONS, SUCH AS CRANES AND EQUIPMENT LESS THAN 200'-0" IN
HEIGHT REQUIRE ADDITIONAL LOCAL APPROVAL AS WELL AS FAA 7460
APPROVAL. COORDINATE WITH NORTH CAROLINA AIR NATIONAL GUARD CE
OFFICE FOR LOCAL OBSTRUCTION APPROVAL. WHEN EQUIPMENT IS
EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN
CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 45 DAYS TO THE CONTRACTING OFFICER, THE NORTH CAROLINA
AIR NATIONAL GUARD, AND CHARLOTTE - DOUGLAS INTERNATIONAL
AIRPORT OPERATIONS PRIOR TO THE START OF CONSTRUCTION TO
COORDINATE THE SUBMITTAL OF FAA FORM 7460 TO THE FAA REGIONAL
OFFICE. PERMISSION TO USE CRANES SHALL BE ISSUED BY CHARLOTTE -
DOUGLAS INTERNATIONAL AIRPORT OPERATIONS, THE NORTH CAROLINA AIR
NATIONAL GUARD, AND THE CONTRACTING OFFICER AFTER APPROVAL BY
THE FAA.
3. OBSTRUCTION LIGHT FIXTURES SHALL BE AVIATION RED INCANDESCENT
STEADY BURNING COMPLYING WITH FAA AC 150/5345-43, TYPE L-810. AIR
FORCE POLICY DOES NOT ALLOW USE OF LED FIXTURES FOR OBSTRUCTION
LIGHTING.
4. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS
OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
5. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS,
OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD PENETRATE
AVIATION SURFACES. A 360 DEGREE RED OBSTRUCTION LIGHT SHALL BE
PLACED AT THE HIGHEST POINT OF THE STOCKPILE. STOCKPILING OF
MATERIAL WITHIN THE AIRPORT SAFETY AREAS IS PROHIBITED.
EXCAVATION AND TRENCHES:
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OSHA
REGULATIONS, THE STATE OF NORTH CAROLINA LAWS CONCERNING
EXCAVATION, AND USACE EM 385-1-1 SAFETY AND HEALTH REQUIREMENT
MANUAL.
2. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE
PROMINENTLY MARKED WITH ORANGE BARRICADES WITH FLASHING RED
LIGHTS ACCEPTABLE TO THE CONTRACTING OFFICER.
3. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 72 HOURS TO THE
CONTRACTING OFFICER AND ASSOCIATED UTILITY COMPANIES AND
AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
4. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND
READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE MATERIAL
HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND COMPACT
TRENCHES AS SPECIFIED.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE
REQUIRED.
6. STRUCTURES AND UTILITIES TO BE REMOVED SHALL BE BACKFILLED IN
ACCORDANCE WITH SPECIFICATION SECTION 31 00 00.
OTHER SAFETY REQUIREMENTS:
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS, AND USACE EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS
MANUAL.
2. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS DAILY AND PRIOR
TO LEAVING THE SITE EACH DAY TO REMEDY ANY SAFETY CONCERNS
IMMEDIATELY.
3. THERE SHALL BE NO PERMANENT WASTE SITES ON AIRPORT PROPERTY.
ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY THE CONTRACTING
OFFICER AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF
WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION
OF THE CONTRACTING OFFICER.
4. CONTRACTOR SHALL COORDINATE THE RELOCATION AND SALVAGE OF ANY
GOVERNMENT OR AIRPORT OWNED EQUIPMENT WITH THE CONTRACTING
OFFICER.
5. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO CONTROL/PREVENT
DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO
CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT, THE NORTH CAROLINA AIR
NATIONAL GUARD, AND THE CONTRACTING OFFICER. THE CONTRACTOR
SHALL CONTROL/PREVENT BLOWING DUST ON THE PROJECT SITE FROM ANY
HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE.
6. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM
CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED
OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY
REQUIREMENTS AND PROPERLY REMOVED FROM THE PROJECT PROPERTY.
IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING
CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY
THE CONTRACTING OFFICER.
7. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CONTRACTING
OFFICER SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF
CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED
BY THE CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING
OFFICER.
8. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN OR
BASE SHALL IMMEDIATELY BE REMOVED FROM THE WORK AREA AND SHALL
NOT BE PERMITTED TO RETURN THROUGHOUT THE REMAINDER OF THE
PROJECT.
9. ALL TEMPORARY CONSTRUCTION LIGHTING SHALL BE COORDINATED WITH
BASE SECURITY FOR APPROVAL OF LOCATIONS, HEIGHT, AND DIRECTION.
SECURITY REQUIREMENTS NOTES:
1. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS AND
PROCEDURES OF “IAW AFFAR 5353.242-9000, CONTRACTOR ACCESS TO AIR
FORCE INSTALLATIONS”, IN ACCORDANCE WITH THE SITE ACCESS AS
INDICATED ON GC005 BASE BID CONSTRUCTION ACCESS.
2. ALL CONTRACTOR EMPLOYEES SHALL CARRY CONTRACTOR PHOTO
IDENTIFICATION AT ALL TIMES WHILE WORKING INSIDE THE CHARLOTTE -
DOUGLAS INTERNATIONAL AIRPORT SECURE PERIMETER. SEE LIMITS ON
GC005.
3. CONTRACTOR EMPLOYEES SHALL COMPLY WITH ANY INTEGRATED DEFENSE
MEASURES THAT MAY BE NECESSARY DURING CONTINGENCY OPERATIONS.
THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLE INSPECTIONS,
IDENTIFICATION CHECKS, ETC.
4. CONTRACTOR AND EMPLOYEE IDENTIFICATION CREDENTIALS: DUE TO THE
NATURE OF THE MILITARY MISSION OPERATED BY THE NORTH CAROLINA AIR
NATIONAL GUARD, STRINGENT SECURITY PROCEDURES ARE ESTABLISHED
TO ENSURE MISSION SUCCESS. PART OF THE MISSION ASSURANCE PIECE IS
TO CONDUCT IDENTITY PROOFING AND VETTING OF ALL CONTRACTORS WHO
ENTER THE INSTALLATION. THE VETTING PROCESS INCLUDES AN EXTENSIVE
CRIMINAL HISTORY CHECK TO DETERMINE THE INDIVIDUAL'S FITNESS FOR
AUTHORIZATION TO ENTER THE INSTALLATION. THE PRIMARY CONTRACTOR
WILL ENSURE ALL EMPLOYEES WORKING INSIDE THE NORTH CAROLINA AIR
NATIONAL GUARD SECURITY PERIMETER POSSESS PROPER CREDENTIALS
ALLOWING THEM TO WORK IN THE UNITED STATES. EXECUTIVE ORDER 12989
REQUIRES CONTRACTORS TO USE THE DEPARTMENT OF HOMELAND
SECURITY'S E-VERIFY SYSTEM FOR ALL EMPLOYEES WORKING ON FEDERAL
CONTRACTS. SEE PROJECT SPECIFICATIONS AND NORTH CAROLINA AIR
NATIONAL GUARD SECURITY FOR FULL LISTING OF ALL REQUIREMENTS.
5. EMPLOYEES WILL BE IDENTITY-PROOFED AND VETTED EACH
TIME A PASS AND/OR CREDENTIAL IS ISSUED. SECURITY
FORCES PERSONNEL MAY ALSO CONDUCT RANDOM SCREENING
AT ANY TIME. IF DISQUALIFYING INFORMATION IS FOUND,
EMPLOYEES MAY BE DENIED ACCESS TO THE INSTALLATION AND
THE CONTRACTING OFFICER OR CONTRACT ADMINISTRATOR
WILL BE NOTIFIED OF THE DENIAL. DUE TO MANDATES OF USC
552A (B) (3) AS RELATED TO PRIVACY ACT 1974 AS AMENDED,
THE INFORMATION CAN ONLY BE DISCUSSED WITH THE
EMPLOYEE AND WILL NOT BE EXPRESSED OUTSIDE OF LAW
ENFORCEMENT.
6. BASE ACCESS CREDENTIALS: THE CONTRACTOR SHALL SUBMIT
ALL APPROPRIATE FORMS AT LEAST 7 DAYS PRIOR TO, IF THE
EMPLOYEE WILL BE REQUIRED TO DRIVE ON THE INSTALLATION,
HE/SHE MUST PRESENT A VALID DRIVER'S LICENSE, STATE
VEHICLE REGISTRATION AND PROOF OF INSURANCE. FURTHER,
THE VEHICLES AND EQUIPMENT MAY BE ESCORTED DURING
EXERCISE OPERATIONS AND MAY BE RENDERED IMMOBILE
WHEN NOT IN OPERATION BY THE REMOVAL OF IGNITION KEYS
OR BY OTHER READILY REVERSIBLE MEANS. CONTRACTOR
VEHICLES ARE SUBJECT TO SEARCH PRIOR TO ENTERING,
WHILE TRANSITING AND/OR WHILE EXITING THE INSTALLATION.
7. IF THE CONTRACT REQUIRES WORK TO BE DONE IN
CONTROLLED OR RESTRICTED AREAS ON THE INSTALLATION,
ACCESS TO THOSE AREAS WILL REQUIRE COORDINATION WITH
AND APPROVAL BY ORGANIZATIONS CONTROLLING THOSE
AREAS. MORE DETAILED INFORMATION MAY BE REQUESTED
FROM THE CONTRACTING OFFICER UPON AWARD OF THE
CONTRACT.
CONTRACTOR SAFETY PLAN SUBMITTALS:
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN
AND PROPOSED PROJECT SCHEDULE TO THE CONTRACTING
OFFICER FOR APPROVAL. THE SAFETY PLAN SHALL IDENTIFY
THE FOLLOWING ITEMS:
A. PROPOSED ACCESS POINTS, HAUL ROUTES, AND STAGING
AREA.
B. TEMPORARY MARKING AND SIGNAGE TO BE USED.
C. LOCATION AND TYPE OF BARRICADES OR OTHER TRAFFIC
CONTROL DEVICES.
D. METHODS BY WHICH THE CONTRACTOR SHALL
COMMUNICATE WITH CHARLOTTE - DOUGLAS
INTERNATIONAL AIRPORT AND THE CONTRACTING
OFFICER.
E. CONSTRUCTION SUPERINTENDENT
F. SITE SAFETY MANAGER
CONTRACTOR PERMITTING REQUIREMENTS:
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM
WATER PERMIT FOR LAND DISTURBANCE OF MORE THAN 1 ACRE
PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING WITH THE CONTRACTING OFFICER TO
COMPLETE AND SUBMIT THE STORM WATER POLLUTION
PREVENTION PLAN (SWPPP) TO THE STATE OF NORTH CAROLINA
FOR APPROVAL.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO
COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATORY
REQUIREMENTS. THE PERMITTING PROCESS MAY INCLUDE THE
SUBMISSION OF THE FOLLOWING TYPES OF PERMITS:
A. EROSION AND SEDIMENT CONTROL.
B. STORMWATER MANAGEMENT.
C. MONITORING WELLS.
D. SOLID AND HAZARDOUS WASTE.
E. DIGGING.
F. TRAFFIC.
G. WELDING PERMIT FOR ANY WELDING OR CUTTING
OPERATIONS CAN BE OBTAINED AT THE CHARLOTTE -
DOUGLAS INTERNATIONAL AIRPORT FIRE STATION.
H. FAA FORM 7460
AD
AD
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
ACCESS AND SAFETY NOTES
GC004 1
FJRP159073-GC004.dwg
T
P
G
S
G
S S
S
S
C E
S
EOI
D
D
D
E
T
T
SPSP
D
D
D D
T
S
S
D
PIV PIV
H
ER
C U
LE
S
BL
VD
H
ER
C U
LES BLVD
1ST FLIGHT DR.
SABER DRIVE H
ER
C U
LES BLVD
PAYNE AVENUE
AI
R
PO
R
T D
R
IV
E
H
ER
C U
LE
S
BL
VD
HERCULES BLVD
EN
LI
ST
ED
D R
IV
E
PAYNE BLVD
MORRIS FIELD DRIVE
MORRIS FIELD DRIVE
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
N
A1 ACCESS AND SAFETY PLAN
SCALE: 1"=100' 150' 300'0
LEGEND
CONTRACTOR STAGING/
LAYDOWN AREA
PROJECT LIMITS
SECURITY PERIMETER
HAUL ROUTE
FUTURE HANGAR
BY OTHERS
GENERAL ACCESS NOTES:
1. SEE DRAWING GC004 FOR ACCESS AND SAFETY
NOTES.
2. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
SECURITY WITHIN THEIR RESPECTIVE
CONSTRUCTION AREA AT ALL TIMES.
CONTRACTOR SHALL DAISY CHAIN THEIR OWN
LOCK WITH BASE SECURITY FORCES PAD LOCK
PRIOR TO CONSTRUCTION.
3. ALL WORK IS ANTICIPATED TO BE INSIDE BASE
SECURITY FENCE AND REQUIRES BADGED
PERSONNEL AND ALL EQUIPMENT TO BE
PROCESSED THROUGH BASE SECURITY GATES.
4. TEMPORARY CONSTRUCTION ACCESS GATE FOR
SPECIAL DELIVERIES WILL BE REMOVED PRIOR TO
COMPLETION OF CONSTRUCTION.
5. EACH CONTRACTOR TO RESTORE THEIR
RESPECTIVE DISTURBED AREAS TO
PRE-CONSTRUCTION CONDITIONS UPON
COMPLETION OF SITE WORK. ALL AREAS OF SITE
DEMOLITION TO BE SEEDED UNLESS INDICATED
FOR SOME OTHER TYPE OF SURFACING. EACH
CONTRACTOR SHALL CONSTRUCT TEMPORARY
FENCES AROUND THEIR SITES AS NEEDED TO
MAINTAIN THE SAFETY AND SECURITY OF THEIR
EQUIPMENT, WORK, AND MATERIALS.
6. CLEAR ACCESS FOR ALL EQUIPMENT, DELIVERIES,
AND PERSONNEL FOR ADJACENT PROJECT WORK
AREAS SHALL BE MAINTAINED THROUGHOUT
CONSTRUCTION ON HAUL ROUTES.
7. CONTRACTOR POV PARKING SHALL BE WITHIN THE
LIMITS OF THE STAGING AND LAYDOWN AREA.
CONTRACTOR PARKING SHALL NOT BE PERMITTED
IN ANY OTHER AREA ON SITE.
8. CONTRACTOR SHALL ONLY ACCESS THE APRON
AT THE AIRFIELD ACCESS ENTRY CONTROL
POINTS INDICATED. ONCE INSIDE THE RED LINE,
NO PERSONNEL SHALL CROSS THE RED LINE AT
ANY TIME. APRON ENTRY AND EXIT SHALL BE AT
THE AIRFIELD ACCESS ENTRY CONTROL POINTS
INDICATED.
SECURITY GATE
HAUL ROUTE
HAUL ROUTE
AIRFIELD ACCESS ENTRY
CONTROL POINTS
CONSTRUCTION
ACCESS POINT
SECURITY
CHECKPOINT
SECURITY
CHECKPOINT
CONTRACTOR
ACCESS GATE
265.00'±
190.00'±
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
ACCESS AND SAFETY PLAN
GC005 0
FJRP159073-GC005.dwg
STABILIZED
CONSTRUCTION
ENTRANCE GC501
B1 e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
GENERAL CIVIL NOTES:
1. CONTRACTOR SHALL OBTAIN ALL REQUIRED DIGGING AND EARTHWORK PERMITS
FROM THE CITY, STATE, AIRPORT, AND NORTH CAROLINA AIR NATIONAL GUARD.
THIS MAY TAKE APPROXIMATELY 3 WEEKS OR MORE TO COMPLETE. UPON
COMPLETION, CONTRACTOR SHALL CALL NORTH CAROLINA 811 FOR UTILITY
LOCATE SERVICES AT 1-800-632-4949.
2. CONTRACTOR IS REQUIRED TO FILE FAA FORM 7460 IN REFERENCE TO THE
CONTRACTOR'S SITE CONSTRUCTION EQUIPMENT. MAXIMUM EQUIPMENT HEIGHT
IS 150-FEET. CONTRACTOR SHALL COORDINATE WITH BASE CE OFFICE AND
AIRPORT FOR ANY TEMPORARY AIRPORT WAIVERS. COORDINATE WITH GC004
HEIGHT NOTE 2
3. CONTRACTOR SHALL COMPLETE THE STORMWATER POLLUTION PREVENTION
PLAN (SWPPP). REFER TO THE SPECIFICATIONS FOR DETAILS ON STORMWATER
POLLUTION PREVENTION MEASURES FOR THIS PROJECT. CONTRACTOR IS
RESPONSIBLE FOR FOLLOWING ALL NC DEQ REQUIREMENTS FOR EROSION
CONTROL.
4. THE STABILIZED CONSTRUCTION ACCESS ROAD ENTRANCE POINT, AS SHOWN ON
GC005, SHALL BE INSTALLED BY THE CONTRACTOR AND COORDINATED AND
APPROVED BY THE CONTRACTING OFFICER.
5. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND CONTACT THE CONTRACTING
OFFICER IF A UTILITY LINE IS DISTURBED.
6. CONTRACTORS SHALL KEEP ALL ROADS AND STREETS CLEAN OF CONSTRUCTION
DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL PROVIDE EQUIPMENT AND
PERSONNEL TO CLEAN ANY STREETS AS REQUESTED BY THE CONTRACTING
OFFICER. CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING
AREAS, AND AIRPORT OR GOVERNMENT PROPERTY, DUE TO DAMAGE BY THEIR
CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL PROVIDE PHOTOGRAPHS
AND/OR VIDEO RECORDING OF THE EXISTING STATE FOR THE PROJECT LIMITS.
ACCESS POINTS, HAUL ROUTES, LAYDOWN AREA AND ANY OTHER AREAS
DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION OR BETTER TO THE SATISFACTION OF THE CONTRACTING OFFICER.
CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR A
PRECONSTRUCTION VIDEO DETAILING THE EXISTING CONDITION OF ACCESS
POINTS, HAUL ROUTES, AND LAYDOWN AREAS TO BE PERFORMED.
7. ALL WORK WILL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF
STATE, LOCAL, AND GOVERNMENT REGULATORY AGENCIES AND THE
CONTRACTING OFFICER.
8. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS, STATE, LOCAL, AND GOVERNMENT CODES, ORDINANCES, AND
REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN
REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST
STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST
STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE CONTRACTING OFFICER
IN WRITING. THE DECISION OF THE CONTRACTING OFFICER WILL BE CONSIDERED
FINAL.
9. INSTALL A TEMPORARY CHAIN-LINK FENCE AROUND THE CONSTRUCTION FREE
ZONE STAGING AREA AND LAYDOWN AREAS AS NEEDED FOR SECURITY OF
EQUIPMENT AND MATERIALS AS DIRECTED BY CONTRACTING OFFICER. LIMITS OF
FENCE SHALL BE A COMBINATION OF NEW AND EXISTING FENCES.
10. COORDINATE THE DISCONNECTION OF UTILITIES THROUGH THE CONTRACTING
OFFICER. DEMOLITION SHALL NOT BEGIN UNTIL WRITTEN BASE APPROVAL IS
RECEIVED. ALL EXISTING UTILITIES ARE TO BE TERMINATED AT THEIR POINT OF
CONNECTION TO THE MAINS. WHERE CONNECTIONS OF NEW UTILITIES TO
EXISTING UTILITIES ARE SHOWN ON THE PLANS, THE CONTRACTOR SHALL
EXPOSE THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO VERIFY THE
LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
11. THE CONTRACTOR SHALL EXPOSE, VERIFY AND BACKFILL ALL EXISTING
UNDERGROUND UTILITIES AND STRUCTURES AT UTILITY CROSSINGS PRIOR TO
EXCAVATION OF PIPELINE TRENCH. UTILITY CROSSINGS AT A DEPTH GREATER
THAN 12-INCHES BELOW TRENCH BOTTOM DO NOT NEED TO BE EXPOSED. UTILITY
ALIGNMENT AND GRADE MAY BE CHANGED IF THERE ARE CONFLICTS WITH ANY
EXISTING UNDERGROUND UTILITIES AND STRUCTURES, WHETHER SHOWN ON THE
PLANS OR NOT. COORDINATE WITH THE CONTRACTING OFFICER AND DESIGN
ENGINEER.
12. FACILITIES IN THE UTILITY CORRIDOR SHALL BE RESTORED UPON COMPLETION OF
CONSTRUCTION. SCREEN WALLS, FENCES, RETENTION WALLS, VEGETATION, AND
OTHER LANDSCAPING SHALL BE REPLACED IN LIKE KIND TO THE ORIGINAL
FEATURES AND TO THE APPROVAL OF THE CONTRACTING OFFICER. COORDINATE
WITH CONTRACTING OFFICER AND DESIGN ENGINEER.
13. CONTRACTOR IS RESPONSIBLE FOR MOWING AND MAINTAINING ALL AREAS
WITHIN THE PROJECT LIMITS EXCEPT WORK AREAS FOR OTHER CONTRACTS AS
COORDINATED WITH CONTRACTING OFFICE. FROM NOTICE-TO-PROCEED DATE
THROUGH THE DURATION OF THE PROJECT.
14. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND ANY
MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND STORM
WATER RUNOFF, IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS.
RECORD DRAWING NOTES:
1. CONTRACTOR SHALL MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES
THROUGH THE DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS
IN CADD AND GIS FORMAT, SHALL BE SUBMITTED TO THE CONTRACTING OFFICER.
AS-BUILTS FOR ALL UTILITY SYSTEMS AND BUILDING STRUCTURES SHALL BE FIELD
SURVEYED AND STAMPED BY A LICENSED SURVEYOR IN THE STATE OF NORTH
CAROLINA.
2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE
FOR KEEPING TRACK OF ANY CONTRACTING OFFICER APPROVED FIELD
CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON APPROVED
CONSTRUCTION DRAWINGS. THESE REVISIONS SHALL BE USED TO PREPARE
RECORD DRAWINGS OF COMPLETED CONSTRUCTION.
3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS,
AND ANY OTHER CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED
ON THE ORIGINAL, APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS
INCLUDES BURIED OR CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT
WERE REVEALED DURING CONSTRUCTION.
AIRPORT OPERATIONS COORDINATION NOTES:
1. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS INDICATED IN FEDERAL
AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC) 150/5370-2F,
OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION (CURRENT
EDITION).
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS AREA WITHOUT
CLEARANCE FROM CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT
OPERATIONS, THE NORTH CAROLINA AIR NATIONAL GUARD, AND THE
CONTRACTING OFFICER, AND SHALL CONDUCT WORK IN SUCH A MANNER TO
ENSURE A MINIMUM HINDRANCE TO AVIATION OPERATIONS. CONTRACTOR SHALL
PROVIDE A MINIMUM NOTICE OF 21 DAYS TO CHARLOTTE - DOUGLAS
INTERNATIONAL AIRPORT OPERATIONS AND THE NORTH CAROLINA AIR NATIONAL
GUARD FOR ACCESS TO AN AIRCRAFT OPERATIONS AREA. PEDESTRIAN TRAFFIC
AND PRIVATELY OWNED VEHICLES SHALL NOT BE ALLOWED IN THE AIRCRAFT
OPERATIONS AREA. CONSTRUCTION ACTIVITY AFFECTING AIRCRAFT MOVEMENT
AREAS AND AIRPORT SAFETY REQUIREMENTS SHALL BE COORDINATED WITH
CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT OPERATIONS, THE NORTH
CAROLINA AIR NATIONAL GUARD, AND THE CONTRACTING OFFICER. NO AIRCRAFT
OPERATIONS AREA SHALL BE CLOSED WITHOUT APPROVAL FROM CHARLOTTE -
DOUGLAS INTERNATIONAL AIRPORT AND THE NORTH CAROLINA AIR NATIONAL
GUARD.
3. VEHICLES AND EQUIPMENT SHALL BE IDENTIFIED BY AN APPROPRIATELY SIZED
FLASHING OR STEADY BURNING AMBER BEACON MOUNTED ON THE UPPER MOST
PART OF THE VEHICLE OR EQUIPMENT SUCH THAT IT IS CONSPICUOUS FROM ANY
DIRECTION INCLUDING FROM THE AIR. IF A VEHICLE OR PIECE OF EQUIPMENT IS
NOT FURNISHED WITH SUCH A BEACON, IT MUST BE ESCORTED AT ALL TIMES INTO
THE AIRCRAFT OPERATIONS AREA BY A PROPERLY LIT VEHICLE.
4. NOTICES TO AIRMEN (NOTAMS) SHALL BE ISSUED IN ACCORDANCE WITH AC
150/5370-2F OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION, AND
AC 150/5200-28D NOTICES TO AIRMEN FOR AIRPORT OPERATORS. ALL NOTAMS
SHALL BE COORDINATED WITH CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT
OPERATIONS AND THE CONTRACTING OFFICER. THE NOTAM INFORMATION SHALL
INCLUDE PORTIONS OF THE AIRFIELD THAT ARE CLOSED OR DISPLACED, THE
DATE AND TIME OF THE BEGINNING AND ENDING OF WORK, AND THE DURATION OF
THE WORK.
5. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 21 DAYS TO BASE-AIRFIELD
OPERATIONS REGARDING THE NEED FOR NOTICES TO AIRMEN (NOTAMS).
CONTRACTOR SHALL NOT COMMENCE WORK ACTIVITIES ON AIRFIELD AREAS
UNTIL APPROPRIATE NOTAMS HAVE BEEN ISSUED TO IDENTIFY WORK ACTIVITIES.
6. CONTRACTOR SHALL PROTECT FROM DAMAGE ALL NAVIGATIONAL AID (NAVAID)
EQUIPMENT AND ALL ASSOCIATED STRUCTURES AND UTILITIES. CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER IF CONSTRUCTION
ACTIVITY DISRUPTS NAVAID EQUIPMENT. THE CONTRACTOR SHALL REPAIR
AND/OR REPLACE ANY DAMAGED NAVAID EQUIPMENT WITH QUALIFIED
TRADESMEN TO THE SATISFACTION OF THE CONTRACTING OFFICER AND AT NO
ADDITIONAL COST TO THE GOVERNMENT OR AIRPORT. ANY DAMAGE TO EXISTING
AIRFIELD LIGHTING, AIRCRAFT NAVIGATIONAL AIDS (NAVAIDS), OR AIRFIELD
PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION SHALL BE COMMUNICATED TO
THE CONTRACTING OFFICER AND SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING OFFICER AT NO
ADDITIONAL COST TO THE GOVERNMENT OR AIRPORT.
7. APRON CLEARANCE AREAS SHALL BE MARKED IN THE FIELD BY THE
CONTRACTOR, WITH APPROVAL FROM THE CONTRACTING OFFICER, TO SERVE AS
AN AID TO KEEP EQUIPMENT AND PERSONNEL FROM INADVERTENTLY ENTERING
THESE AREAS. CONTRACTOR SHALL REFER TO UFC 3-260-01 AND AFI 32-1042.
8. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING DAMAGE TO
AIRCRAFT SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT OPERATION AREAS.
CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS CARRIED ONTO
THE AIRFIELD FROM CONTRACTOR'S EQUIPMENT OR OPERATIONS TO PREVENT
FOREIGN OBJECT DAMAGE (FOD). MATERIAL DROPPED WITHIN THESE AREAS
SHALL BE CONTINUOUSLY REMOVED BY APPROVED METHODS DURING WORKING
HOURS. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO
PREVENT MOVEMENT RESULTING FROM AIRCRAFT PROPWASH OR JET BLAST.
CONTRACTOR SHALL HAVE A FULLY OPERATIONAL VACUUM TRUCK ON SITE AT
ALL TIMES TO CLEAN ADJACENT AIRFIELD PAVEMENTS ON A DAILY BASIS AND AS
REQUIRED BY THE CONTRACTING OFFICER AND AIRFIELD OPERATIONS.
COORDINATION AND COMMUNICATION:
1. CONTRACTOR SHALL APPOINT A CONSTRUCTION SUPERINTENDENT, SUBJECT TO
THE APPROVAL OF THE CONTRACTING OFFICER, WHO SHALL BE PRESENT ON THE
CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS WHILE JOB IS IN
PROGRESS. THE SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR
BASIS. WHEN THE CONTRACTOR'S REPRESENTATIVE IS NOT AVAILABLE ON THE
CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED.
CONTRACTOR SHALL PROVIDE NAMES AND CONTACT INFORMATION OF
REPRESENTATIVES TO THE CONTRACTING OFFICER PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT
COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE CONTRACTING
OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL
BE REVIEWED AND APPROVED BY THE CONTRACTING OFFICER.
EXISTING CONDITION NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED
HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS.
UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT
DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE
THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY
DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE
COR BEFORE ANY FURTHER WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING
STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY
PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL
VERIFY EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE
WORK. CONTRACTOR SHALL CONTACT THE BASE, AIRPORT, AND ALL ASSOCIATED
UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF
UTILITIES.THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE
LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES
INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING
CONSTRUCTION.
4. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE
DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL
REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF
THE COR.
5. SITE AND UTILITY WORK WILL BE OCCURRING IN AN AREA POTENTIALLY
CONTAMINATED. CONTRACTOR SHALL NOTIFY COR IF ANY CONTAMINATED SOILS
ARE ENCOUNTERED. ANY CONTAMINATED SOILS SHALL BE DISPOSED OFF SITE IN
A LOCATION PER LOCAL, STATE AND FEDERAL LAWS. ANY CONTAMINATED
SUBSURFACE WATER ENCOUNTERED IN THIS CONSTRUCTION AREA SHALL BE
COLLECTED AND DISPOSED OFF SITE PER LOCAL, STATE, AND FEDERAL LAWS.
6. SPECIAL HANDLING AND CONSIDERATION WILL BE REQUIRED FOR EXCAVATED
SOILS THOUGHT TO CONTAIN CONTAMINATED SUBSTANCES. CONTRACTOR SHALL
PERIODICALLY MONITOR EXCAVATED SOILS. SOILS SHALL BE TREATED ON SITE
OR DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL FEDERAL, STATE, AND
LOCAL REQUIREMENTS AND THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE REMOVAL OF CONTAMINATED MATERIALS WITH THE CONTRACTING
OFFICER.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEANUP OF ANY SEWAGE
SPILLS CAUSED DURING CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE CONTRACTING OFFICER AND THE STATE DEPARTMENT OF HEALTH.
ALL CLEANUP EFFORTS SHALL BE IN STRICT COMPLIANCE WITH LOCAL, STATE,
AND FEDERAL REGULATIONS.
SURVEY AND SUBSURFACE INVESTIGATION NOTES:
1. THE SURVEY WAS PERFORMED BY MA ENGINEERING CONSULTANTS, INC. IN
MARCH OF 2017.
2. CONTRACTOR SHALL RETAIN A LICENSED SURVEYOR TO SURVEY PROJECT
IMPROVEMENTS. IF BENCHMARKS SHOWN ARE IN AREAS THAT REQUIRE
DEMOLITION, OTHER BENCHMARKS SHALL BE ESTABLISHED BEFORE DEMOLITION
AND CONSTRUCTION WORK BEGINS. CONTRACTOR SHALL SUPPLY CERTIFIED,
CONTROL POINT DATA TO THE COR AFTER COMPLETION OF CONSTRUCTION.
3. HORIZONTAL DATUM: NAD83(2011)
VERTICAL DATUM: NAVD88
4. THE SUBSURFACE GEOTECHNICAL INVESTIGATION WAS PERFORMED BY SUMMIT
ENGINEERING, LABORATORY & TESTING, P.C. IN MARCH, 2017. THE RESULTS OF
THE INVESTIGATION ARE CONTAINED IN THE PROJECT GEOTECHNICAL REPORT.
POINT NORTHING EASTING ELEVATION DESCRIPTION
538928.16
538840.90
539688.34
1423733.23
1422684.63
1423940.04
728.27
736.26
705.11
PK NAIL
PK NAIL
PK NAIL
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
GENERAL CIVIL NOTES
GC006 0
FJRP159073-GC004.dwg
P
8"PVC
6"
PV
C
S
EOI
8"PVC
D
D
D
SPSP
D
D
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
1 STORY
BLOCK
BUILDING
D D
EXISTING
MOORING
POINT (TYP)
S
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
N
A1 AIRCRAFT SPACING
SCALE: 1"=100' 60' 120'0
NEW 12" WIDE RED LINE
600.00 TO T/W CENTERLINE FOR FAA GROUP IV, V, VI
500' RUNWAY PRIMARY SURFACE
243.99'
75.48'
50.00'
25.00'
(TYP)
30.00' 30.00'
50.00'
50.00'
R U
N W
AY 18L-36R
385.58'
TAIL RESTRICTION LINE.
C-17 TAIL HEIGHT = 55'-1"
AIRCRAFT SPACING NOTES:
1. DIMENSIONS SHOWN
SHALL BE CONSIDERED
APPROXIMATE.
26.45'
96.85'
26.45'
96.85'
41.46'
96.85'
26.45'
92.93'
41.03'
93.26'
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
AIRCRAFT SPACING
GC007 0
FJRP159073-GC007.dwg e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
NOTES:
1. LOW-PROFILE BARRICADES SHALL MEET FAA AC 150/5370-2F (OR CURRENT EDITION).
2. FLASHERS SHALL BE BATTERY OR SOLAR OPERATED. LENS SHALL BE RED AND BE
ABLE TO ROTATE 90° OR CIRCULAR AND VISIBLE TO 360°.
3. SUPPORT BRACES SHALL BE SECURELY ATTACHED TO BOARD.
4. SAND BAGS SHALL BE PLACED ON BOTH SIDES OF EACH SUPPORT BRACE. ALL SAND
BAGS USED TO SECURE BARRICADES SHALL BE ORANGE
5. FACING OF BOARD 2"X8" TO BE COVERED WITH REFLECTIVE TAPE OR PAINT.
6. CONTRACTOR SHALL PROVIDE A SUFFICIENT NUMBER OF LOW PROFILE BARRICADES
TO EXTEND ACROSS THE PAVEMENT AT THE LOCATIONS SHOWN WITH BARRICADES
PLACED END TO END WITH NO GAPS. BOARDS TO BE CLEAN SOLID WOOD WITH NO
DECAYING OR OLD LUMBER THAT CAN CAUSE FOD CONCERNS.
7. CONTRACTOR SHALL MAINTAIN ALL LOW-PROFILE BARRICADES FOR THE DURATION OF
THE PROJECT.
8. ANY MODIFICATIONS TO LOW-PROFILE BARRICADE BOARD, SUPPORTS, SANDBAGS,
FLASHING LIGHTS, ETC SHALL BE APPROVED BY CONTRACTING OFFICER
REPRESENTATIVE PRIOR TO INSTALLATION.
2" x 8" (NOMINAL) OR 6"x6" BOARD
RED FLASHING LIGHT/LENS
8"
8'-0"
BARRICADES SHALL BE BRACED TO PREVENT TIP OVER OR
DISPLACEMENT AS MAY BE INDUCED BY WIND OR JET BLAST
SUPPORT BRACE 2" x 4", 24" IN LENGTH
SECURELY FASTENED HELD IN PLACE
BY ORANGE SANDBAGS (OR SIMILAR)
ALTERNATING 6" BANDS
OF AVIATION WHITE &
ORANGE REFLECTIVE
(ALL SIDES OF BOARD)
DIVERSION RIDGE
3" BASE ROCK ON 18" RAIL
YARD BALLAST ROCK
EX
IS
TI
N
G P
AV
ED
R O
AD
W
AY
VARIES
' M
IN
FL
O
W
FLOW FLOW
FLO
W
SPILLWAY
SEDIMENT BARRIER
(SEE NOTE 4)
SECTION C-C
EXISTING PAVED ROADWAY
FILTER FABRIC FOR STABILIZATION
2% OR GREATER
DIVERSION RIDGE REQUIRED
WHERE GRADE EXCEEDS 2%
NOTES:
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO ROADWAY. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF
ANY MEASURES USED TO TRAP SEDIMENT.
2. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY.
3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. CONTRACTOR TO PROVIDE
EQUIPMENT FOR WASHING.
4. USE SANDBAGS OR OTHER APPROVED METHODS TO CHANNELIZE RUNOFF TO BASIN AS REQUIRED.
.0
0'R (T
YP
STABILIZED CONSTRUCTION ENTRANCEB1 LOW-PROFILE BARRICADESB3
C
GC501
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
ACCESS AND SAFETY DETAILS
GC501 0
FJRP159073-GC501.dwg
H
ER
C U
LE
S
BL
VD
H
ER
C U
LES BLVD
S
T
P
8"PVC
8"PVC
8"DI
8"DI
16"D I
8"PVC
6" P
G
S
G
S S
S
S
C E
S
UNKEOI
8"PVC
D
E
T
T
SPSP
D
6"
6"
2"
FM
D
AT
U R
8"DI (4"ATUR)
8"DI(DATUR)
TRANS
SWITCH
BOX
TRANS
SWITCH
D
SWITCH
BOX
EXISTING 1 STORY
BLOCK
BUILDING
AA
A
A
A
A A
A
A
A
A
A
A
A
A
A
A
A
A A
A
A A
A
A
A
A
A A
A A
A
A A
A
A
A
MONITORING
WELL (TYP)
A
A
A
AA
A
A
A
A
A
A
A
A
A A
A
A
A A
A
A
A A
A
A
SWITCH
BOX
SWITCH
BOX
FDC
FDC
FDC
PIV
FDC
D D
LIFT
STATION
EXISTING
MOORING
POINT (TYP)
42"RC(DATUR)
24"RC (DATUR)
48"RC(DATUR)
T
PIV
SWSWSSSSWSWSWWW
O
D
8"PVC
P
SWITCH
BOX
D
8"D I
D
T
POWER
BOX
P CARD
READER
T T e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
N
A1 EXISTING CONDITIONS PLAN
SCALE: 1" = 60'
AD
60' 120'0
LEGEND:
WATER LINE
FIRE LINE
WATER METER
FIRE HYDRANT
SANITARY SEWER LINE
SANITARY MANHOLE
STORM DRAIN LINE
STORM INLET
COMMUNICATIONS LINE
ELECTRICAL LINE
MOORING POINT
MONITORING WELL
PAVEMENT MARKING
S
D
W
MW
PK NAIL
N: 538840.90 E: 1422684.63
EL: 736.26
PK NAIL
N: 538928.16 E: 1423733.23
EL: 728.27
PK NAIL
N: 539688.34 E: 1423940.04
EL: 705.11
12/02/16 D.MUETING
A.DORMAN R.BARUTH
EXISTING CONDITIONS PLAN
V-100 0
FJRP159073-V-100.dwg e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
N
A1 EXISTING PAVEMENT PLAN
SCALE: NTS
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
EXISTING PAVEMENT PLAN
V-101 0
FJRP159073-B-100.dwg
C U
LES BLVD
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINEWATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINEWATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINEWATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
S
T
P
8"PVC
8"PVC
8"DI
8"DI
8"PVC
6"
PV
C
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINE
WATERLINEWATERLINE
G
S S
S
S
C E
S
UNKEOI
8"PVC
D
D
D
E
T
T
SPSP
D
6"
6"
2"
FM
D
AT
U R
8"DI (4"ATUR)
8"DI(DATUR)
TRANS
SWITCH
BOX
TRANS
SWITCH
D
SWITCH
BOX
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
1 STORY
BLOCK
BUILDING
MONITORING
WELL (TYP)
SWITCH
BOX
SWITCH
BOX
FDC
FDC
FDC
PIV
FDC
D D
LIFT
STATION
24"RC (DATUR)
48"RC(DATUR)
T
PIV
SSSS
D
DEEP BORING20'
B3
DEEP BORING50'
B1
SHALLOW BORING10'
B8DEEP BORING10'
B7
DEEP BORING30'
B2
SHALLOW BORING10'
B6
SHALLOW BORING10'
B5
DEEP BORING30'
B4
CONCRETE CORE
C2
CONCRETE CORE
C1
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
PY
R
IG
H
T
BU
R N
S
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
D
2 3
C
4 5
A
B
N
A1 BORING LAYOUT PLAN
SCALE: NTS
AD
12/02/16 D.MUETING
A.DORMAN R.BARUTH
BORING LAYOUT PLAN
B-100 0
FJRP159073-B-100.dwg
B5
10' SHALLOW BORING
B4
30' DEEP BORINGC1
CONCRETE CORE
B6
10' SHALLOW BORING
C2
CONCRETE CORE
B7
10' DEEP BORING B8
10' SHALLOW BORING
DEEP BORING50'
B1
DEEP BORING30'
B2
DEEP BORING
B3 20'
GEOTECHNICAL EXPLORATION NOTES
1. THE BORING LOGS AND RELATED INFORMATION, INCLUDING WATER LEVELS,
DEPICT CONDITIONS ONLY AT THE SPECIFIC LOCATIONS AND AT THE
PARTICULAR TIME DESIGNATED ON THE LOGS.
2. SOIL CONDITIONS AT OTHER LOCATIONS MAY DIFFER FROM CONDITIONS
OCCURING AT THESE SPECIFIC BORING LOCATIONS. ANY ATTEMPT TO
INTERPOLATE THE STRATIGRAPHIC CONDITIONS BETWEEN BORINGS IS AT THE
CONTRACTOR'S RISK.
3. FLUCTUATIONS OR CHANGES IN WATER LEVELS AND GROUNDWATER
CONDITIONS CAN BE INFLUENCED BY SOURCES OUTSIDE THE AREAS OF THE
SITE INVESTIGATED, BY SEASONAL RAINFALL, AND BY CHANGES IN DRAINAGE
CONDITIONS IN AND AROUND THE SITE. FLUCTUATIONS CAN OCCUR AND
SHOULD BE ANTICIPATED BETWEEN THE TIME OF INVESTIGATION AND THE TIME
OF CONSTRUCTION.
4. ADDITIONAL INFORMATION IS CONTAINED IN THE ENGINEER'S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.