This document provides specifications for storm water pollution prevention measures for the construction of a latrine annex building. The specifications require the contractor to implement controls and measures to prevent sediment from entering water bodies during construction. These include stabilization practices to control erosion, such as temporary seeding and mulching within 14 days of inactivity in any area. Structural practices such as silt fences and straw bales must also be installed and maintained to divert flows from exposed soils. The contractor must inspect all areas weekly and after storms to identify any issues, and submit monthly reports certifying compliance.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Latrine Annex Building has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex Addition to B3010
SECTION 01 57 23.00 10
STORM WATER POLLUTION PREVENTION MEASURES
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 4439 (2004) Geosynthetics
ASTM D 4491 (1999; R 2004) Water Permeability of Geotextiles by Permittivity
ASTM D 4533 (2004) Trapezoid Tearing Strength of Geotextiles
ASTM D 4632 (1991; R 2003) Grab Breaking Load and Elongation of Geotextiles
ASTM D 4751 (2004) Determining Apparent Opening Size of a Geotextile
ASTM D 4873 (2002) Identification, Storage, and Handling of Geosynthetic Rolls and Samples
1.2 GENERAL REQUIREMENTS
Contractor shall implement the storm water pollution prevention measures to prevent sediment from entering streams or water bodies as specified in this Section in conformance with the requirements of Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and the requirements of the National Pollution Discharge Elimination System (NPDES) permit attached to that Section.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-07 Certificates
Mill Certificate or Affidavit
Certificate attesting that the Contractor has met all specified requirements.
1.4 EROSION AND SEDIMENT CONTROLS
The controls and measures required by the Contractor are described below.
1.4.1 Stabilization Practices
The stabilization practices to be implemented shall include temporary seeding, mulching, geotextiles, protection of trees, preservation of mature vegetation, etc. On his daily CQC Report, the Contractor shall record the dates when the major grading activities occur, (e.g., clearing and grubbing, excavation, embankment, and grading); when construction activities temporarily or permanently cease on a portion of the site; and when stabilization practices are initiated. Except as provided in paragraphs UNSUITABLE CONDITIONS and NO ACTIVITY FOR LESS THAN 21 DAYS, stabilization practices shall be initiated as soon as practicable, but no more than 14 days, in any portion of the site where construction activities have temporarily or permanently ceased.
1.4.1.1 Unsuitable Conditions
Where the initiation of stabilization measures by the fourteenth day after construction activity temporarily or permanently ceases is precluded by unsuitable conditions caused by the weather, stabilization practices shall be initiated as soon as practicable after conditions become suitable.
1.4.1.2 No Activity for Less Than 21 Days
When the total time period in which construction activity is temporarily ceased on a portion of the site is 21 days minimum, stabilization practices do not have to be initiated on that portion of the site until 14 days have elapsed after construction activity temporarily ceased.
1.4.2 Structural Practices
Structural practices shall be implemented to divert flows from exposed soils, temporarily store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site. Structural practices shall be implemented in a timely manner during the construction process to minimize erosion and sediment runoff. Structural practices shall include the following devices.
1.4.2.1 Silt Fences
The Contractor shall provide silt fences as a temporary structural practice to minimize erosion and sediment runoff. Silt fences shall be properly installed to effectively retain sediment immediately after completing each phase of work where erosion would occur in the form of sheet and rill erosion (e.g. clearing and grubbing, excavation, embankment, and grading).
Silt fences shall be installed in the locations indicated on the drawings.
Final removal of silt fence barriers shall be upon approval by the Contracting Officer.
1.4.2.2 Straw Bales
The Contractor shall provide bales of straw as a temporary structural practice to minimize erosion and sediment runoff. If bales are used, the bales shall be properly placed to effectively retain sediment immediately after completing each phase of work (e.g., clearing and grubbing, excavation, embankment, and grading) in each independent runoff area (e.g., after clearing and grubbing in a area between a ridge and drain, bales shall be placed as work progresses, bales shall be removed/replaced/relocated as needed for work to progress in the drainage area). Areas where straw bales are to be used are shown on the drawings.
Final removal of straw bale barriers shall be upon approval by the Contracting Officer. Rows of bales of straw shall be provided as follows:
a. Along the downhill perimeter edge of all areas disturbed.
b. Along the top of the slope or top bank of drainage ditches, channels, swales, etc. that traverse disturbed areas.
c. Along the toe of all cut slopes and fill slopes of the construction areas.
d. Perpendicular to the flow in the bottom of existing drainage ditches, channels, swales, etc. that traverse disturbed areas or carry runoff from disturbed areas. Rows shall be spaced a maximum of 20 feet apart.
e. Perpendicular to the flow in the bottom of new drainage ditches, channels, and swales. Rows shall be spaced a maximum of 20 m feet apart.
f. At the entrance to culverts that receive runoff from disturbed areas.
1.4.2.3 OMITTED
PART 2 PRODUCTS
2.1 COMPONENTS FOR SILT FENCES
2.1.1 Filter Fabric
The geotextile shall comply with the requirements of ASTM D 4439, and shall consist of polymeric filaments which are formed into a stable network such that filaments retain their relative positions. The filament shall consist of a long-chain synthetic polymer composed of at least 85 percent by weight of ester, propylene, or amide, and shall contain stabilizers and/or inhibitors added to the base plastic to make the filaments resistance to deterioration due to ultraviolet and heat exposure.
Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of six months of expected usable construction life at a temperature range of -18 to plus 49 degrees C 0 to 120 degrees F. The filter fabric shall meet the following requirements:
FILTER FABRIC FOR SILT SCREEN FENCE
PHYSICAL PROPERTY TEST PROCEDURE STRENGTH REQUIREMENT
Grab Tensile ASTM D 4632 445 N min.
Elongation (%) 30 % max.
Trapezoid Tear ASTM D 4533 245 N min.
Permittivity ASTM D 4491 0.2 sec-1
FILTER FABRIC FOR SILT SCREEN FENCE
PHYSICAL PROPERTY TEST PROCEDURE STRENGTH REQUIREMENT
AOS (U.S. Std Sieve) ASTM D 4751 20-100
FILTER FABRIC FOR SILT SCREEN FENCE
PHYSICAL PROPERTY TEST PROCEDURE STRENGTH REQUIREMENT
Grab Tensile ASTM D 4632 100 lbs. min.
Elongation (%) 30 % max.
Trapezoid Tear ASTM D 4533 55 lbs. min.
Permittivity ASTM D 4491 0.2 sec-1
AOS (U.S. Std Sieve) ASTM D 4751 20-100
2.1.2 Silt Fence Stakes and Posts
The Contractor may use either wooden stakes or steel posts for fence construction. Wooden stakes utilized for silt fence construction, shall have a minimum cross section of 50 by 50 mm 2 by 2 inches when oak is used and 100 by 100 mm 4 by 4 inches when pine is used, and shall have a minimum length of 1.5 m 5 feet. Steel posts (standard "U" or "T" section) utilized for silt fence construction, shall have a minimum mass of 1.98 kg/linear meter weight of 1.33 pounds/linear foot and a minimum length of 1.5 m 5 feet.
2.1.3 Mill Certificate or Affidavit
A mill certificate or affidavit shall be provided attesting that the fabric and factory seams meet chemical, physical, and manufacturing requirements specified above. The mill certificate or affidavit shall specify the actual Minimum Average Roll Values and shall identify the fabric supplied by roll identification numbers. The Contractor shall submit a mill certificate or affidavit signed by a legally authorized official from the company manufacturing the filter fabric.
2.1.4 Identification Storage and Handling
Filter fabric shall be identified, stored and handled in accordance with
ASTM D 4873.
2.2 COMPONENTS FOR STRAW BALES
The straw in the bales shall be stalks from oats, wheat, rye, barley, rice, or from grasses such as byhalia, bermuda, etc., furnished in air dry condition. The bales shall have a standard cross section of 350 by 450 mm 14 by 18 inches. All bales shall be either wire-bound or string-tied. The Contractor may use either wooden stakes or steel posts to secure the straw bales to the ground. Wooden stakes utilized for this purpose, shall have a minimum dimensions of 50 by 50 mm 2 by 2 inches in cross section and shall have a minimum length of 1 m 3 feet. Steel posts (standard "U" or "T" section) utilized for securing straw bales, shall have a minimum mass of
1.98 kg/linear meter weight of 1.33 pounds/linear foot and a minimum length of 1 m 3 feet.
PART 3 EXECUTION
3.1 INSTALLATION OF SILT FENCES
Silt fences shall extend a minimum of 400 mm 16 inches above the ground surface and shall not exceed 860 mm 34 inches above the ground surface.
Filter fabric shall be from a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are unavoidable, filter fabric shall be spliced together at a support post, with a minimum 150 mm 6 inch overlap, and securely sealed. A trench shall be excavated approximately 100 mm 4 inches wide and 100 mm 4 inches deep on the upslope side of the location of the silt fence. The 100 by 100 mm 4 by 4 inch trench shall be backfilled and the soil compacted over the filter fabric.
Silt fences shall be removed upon approval by the Contracting Officer.
3.2 INSTALLATION OF STRAW BALES
Straw bales shall be placed in a single row, lengthwise on the contour, with ends of adjacent bales tightly abutting one another. Straw bales shall be installed so that bindings are oriented around the sides rather than along the tops and bottoms of the bales in order to prevent deterioration of the bindings. The barrier shall be entrenched and backfilled. A trench shall be excavated the width of a bale and the length of the proposed barrier to a minimum depth of 100 mm 4 inches. After the bales are staked and chinked (gaps filled by wedging with straw), the excavated soil shall be backfilled against the barrier. Backfill soil shall conform to the ground level on the downhill side and shall be built up to 100 mm 4 inches against the uphill side of the barrier. Loose straw shall be scattered over the area immediately uphill from a straw bale barrier to increase barrier efficiency. Each bale shall be securely anchored by at least two stakes driven through the bale. The first stake or steel post in each bale shall be driven toward the previously laid bale to force the bales together. Stakes or steel pickets shall be driven a minimum 450 mm 18 inches deep into the ground to securely anchor the bales.
3.3 MAINTENANCE
The Contractor shall maintain the temporary and permanent vegetation, erosion and sediment control measures, and other protective measures in good and effective operating condition by performing routine inspections to determine condition and effectiveness, by restoration of destroyed vegetative cover, and by repair of erosion and sediment control measures and other protective measures. The following procedures shall be followed to maintain the protective measures.
3.3.1 Silt Fence Maintenance
Silt fences shall be inspected in accordance with paragraph INSPECTIONS.
Any required repairs shall be made promptly. Close attention shall be paid to the repair of damaged silt fence resulting from end runs and undercutting. Should the fabric on a silt fence decompose or become ineffective, and the barrier is still necessary, the fabric shall be replaced promptly. Sediment deposits shall be removed when deposits reach one-third of the height of the barrier. When a silt fence is no longer required, it shall be removed. The immediate area occupied by the fence and any sediment deposits shall be shaped to an acceptable grade. The areas disturbed by this shaping shall be seeded in accordance with Section 32 05 33 LANDSCAPE ESTABLISHMENT, except that the coverage requirements in paragraph ESTABLISHMENT do not apply.
3.3.2 Straw Bale Maintenance
Straw bale barriers shall be inspected in accordance with paragraph INSPECTIONS. Close attention shall be paid to the repair of damaged bales, end runs and undercutting beneath bales. Necessary repairs to barriers or replacement of bales shall be accomplished promptly. Sediment deposits shall be removed when deposits reach one-half of the height of the barrier. Bale rows used to retain sediment shall be turned uphill at each end of each row. When a straw bale barrier is no longer required, it shall be removed. The immediate area occupied by the bales and any sediment deposits shall be shaped to an acceptable grade. The areas disturbed by this shaping shall be seeded in accordance with Section 32 92 19 SEEDING.
3.3.3 Diversion Dike Maintenance
Diversion dikes shall be inspected in accordance with paragraph INSPECTIONS. Close attention shall be paid to the repair of damaged diversion dikes and necessary repairs shall be accomplished promptly. When diversion dikes are no longer required, they shall be shaped to an acceptable grade. The areas disturbed by this shaping shall be seeded in accordance with Section 32 92 19 SEEDING.
3.4 INSPECTIONS
3.4.1 General
The Contractor shall inspect disturbed areas of the construction site, areas that have not been finally stabilized used for storage of materials exposed to precipitation, stabilization practices, structural practices, other controls, and area where vehicles exit the site at least once every seven (7) calendar days and within 24 hours of the end of any storm that produces 13 mm 0.5 inches or more rainfall at the site. Where sites have been finally stabilized, such inspection shall be conducted at least once every month.
3.4.2 Inspections Details
Disturbed areas and areas used for material storage that are exposed to precipitation shall be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures identified in the Storm Water Pollution Prevention Plan shall be observed to ensure that they are operating correctly. Discharge locations or points shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters.
Locations where vehicles exit the site shall be inspected for evidence of offsite sediment tracking.
3.4.3 Inspection Reports
For each inspection conducted, the Contractor shall prepare a report summarizing the scope of the inspection, name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the Storm Water Pollution Prevention Plan, maintenance performed, and actions taken. The report shall be furnished to the Contracting Officer within 24 hours of the inspection as a part of the Contractor's daily CQC REPORT. A copy of the inspection report shall be maintained on the job site.
3.4.4 Monthly Inspection Report and Certification Form for Erosion and Sediment Controls
On the first working day of each month the Contractor shall complete, sign, and submit the original form to the State of Georgia, Office of Pollution Control (OPC).
A copy of the State of Georgia's Monthly Inspection Report and Certification Form for Erosion and Sediment Controls is attached to the end of this section. On the first working day of each month the Contractor shall also furnish one copy of the form submitted to the OPC to the Contracting Officer as part of the Contractor's daily CQC Report and attach a copy of the completed form to the Plan. Unless otherwise notified by the OPC, the Contractor shall submit the Monthly Inspection Report and Certification Forms for an additional two months after the final completion of all storm water pollution prevention measures required in this contract have been implemented.
-- End of Section --