About this file

This document contains specifications for spray foam insulation for use in construction of a latrine annex building. The specifications cover open cell spray foam insulation, including required physical and mechanical properties, fire performance standards, and thermal resistance ratings. Installation requirements specify applying the insulation by spray method to a uniform density and minimum thickness. The related federal contract opportunity is to construct a latrine annex building at Fort Eustis in accordance with the included statement of work, drawings, and specifications, including the spray foam insulation specifications. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Latrine Annex Building, newest first.
File Type Posted
W911SF-20-B-0001-0003 Solicitation Latrine Annex Building 3010 Amendment 0003.pdf PDF
3010 Latrine 144R.PDF PDF
Site Visit Attendance Sheet 18 February 2020.pdf PDF
RFI Questions Addendum 1.pdf PDF
W911SF-20-B-0001-0001 Solicitation Latrine Annex Building 3010 Amendment 0001.pdf PDF
03 20 01.00 10 Conc Reinf.pdf PDF
06 20 00 Finish Carpentry.pdf PDF
10 21 13 Toilet Partition.pdf PDF
26 20 00.pdf PDF
26 24 16.00 40.pdf PDF
26 00 00.00 20.pdf PDF
23 08 00 Commissioning of HVAC Systems.pdf PDF
32 92 19 Seeding.pdf PDF
SOW B3010 Latrine Addition 12 NOV 19-REVISED.pdf PDF
08 71 00 Steel Doors and Frames.pdf PDF
00 00 00 1 COVER-44054.pdf PDF
26B3010 Elec. Cut Sheet 2.pdf PDF
31 23 00 Excavation and Fill.pdf PDF
22 00 00 Plumbing, General Purpose.pdf PDF
32 92 23 Sodding.pdf PDF
33 40 00.00 40 Storm Sewerage.pdf PDF
05 40 00 Cold Form Steel Framing.pdf PDF
07 60 00 Flashg and Sheet Met.pdf PDF
Wage Determination (Muscogee County).pdf PDF
31 31 16 Soil Treatment for Subterranean Termite Control.pdf PDF
Price Proposal Breakdown.xlsx XLSX spreadsheet
32 15 00 Aggregate Surface Course.pdf PDF
00 62 35 Recycled Recoverd Materials.pdf PDF
01 45 04_00 10 Contractor Quality Control.pdf PDF
01 57 20 Environmental Protection.pdf PDF
26 29 23.pdf PDF
01 57 23 Storm Water Pollution Prevention Measures.pdf PDF
07 84 00 Firestopping.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
03 30 04 Concrete for Structures.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
05 12 00 Structural Steel.pdf PDF
32 16 13 Concrete Sidewalks.pdf PDF
23 05 93 Testing & Balancing.pdf PDF
06 10 00 Rough Carpentry.pdf PDF
05 50 13 Miscel Metal Fabrications.pdf PDF
W911SF-20-B-0001 Solicitation Latrine Annex Building 3010.pdf PDF
23 03 00 Basic Materials and Methods.pdf PDF
31 32 11 Soil Surface Erosion Control.pdf PDF
01 32 01_00 10 Project Sch.pdf PDF
31 00 00 Earthwork.pdf PDF
09 70 5 Resinous Flooring.pdf PDF
23 07 00 Thermal Insulation for Mechanical Systems.pdf PDF
04 20 00 Masonry.pdf PDF
09 29 00 Gypsum Board.pdf PDF
Show all 50

Construct Latrine Annex Building has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07 21 14

Annex Addition to B3010

SECTION 07 21 14

SPRAY FOAM INSULATION

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Open Cell Spray Foam Insulation.

1.2 RELATED SECTIONS

A. Section 07480 - Exterior Wall Assemblies: Exterior Insulated Finish Systems EIFS.

B. Section 09200 - Gypsum Board: Insulation installed in conjunction with interior wall and ceiling finish systems.

C. Section 15810 - Ducts: Insulation to surround HVAC ductwork.

1.3 REFERENCES

A. ASTM C 518 - Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus.

B. ASTM C 177 - Standard Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus.

C. ASTM C 1338 - Standard Test Method for Determining Fungi Resistance of Insulation Materials and Facings.

D. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

E. ASTM E 96 - Standard Test Methods for Water Vapor Transmission of Materials.

F. ASTM E 283 - Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.

G. ASTM D 1621 - Standard Test Method for Compressive Properties of Rigid Cellular Plastics.

H. ASTM D 1622 - Standard Test Method for Apparent Density of Rigid Cellular Plastics.

I. ASTM D 1623 - Standard Test Method for Tensile and Tensile Adhesion Properties of Rigid Cellular Plastics.

J. ASTM D 2126 - Standard Test Method for Response of Rigid Cellular Plastics to Thermal and Humid Aging.

K. ASTM D 2842 - Standard Test Method for Water Absorption of Rigid Cellular Plastics.

1.4 PERFORMANCE REQUIREMENTS

A. Conform to applicable code for flame and smoke, concealment, and over coat requirements.

1.5 SUBMITTALS

A. Submit under provisions of Section 01300.

B. Product Data: Manufacturer's data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Storage and handling requirements and recommendations.

3. Installation methods.

C. Manufacturer's Certificates: Certify products meet or exceed specified requirements.

1.6 QUALITY ASSURANCE

A. Manufacturer Qualifications: Manufacturer with a minimum of ten years experience manufacturing products in this section shall provide all products listed.

B. Installer Qualifications: Products listed in this section shall be installed by a single organization with at least five years experience successfully installing insulation on projects of similar type and scope as specified in this section.

C.Toxicity/Hazardous Materials

1.Provide products that contain no urea-formaldehyde.

2.Products and equipment requiring or using CFCs, HCFCs, or HFCs during the manufacturing or application process will not be permitted.

3.Provide products that contain no PBDEs

D. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship.

1. Finish areas designated by Architect.

2. Do not proceed with remaining work until workmanship is approved by Architect.

3. Refinish mock-up area as required to produce acceptable work.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation.

B. Storage: Store materials in dry locations with adequate ventilation, protected from freezing rain, direct sunlight and excess heat and in such a manner to permit easy access for inspection and handling.

Store at temperature between 55 and 80 degrees F (12.7 to 26.6 degrees C).

C. Handling: Handle materials to avoid damage.

1.8 PRE-APPLICATION MEETINGS

A. Convene minimum two weeks prior to starting work of this section.

1.9 SEQUENCING

A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.

1.10 PROJECT CONDITIONS

A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

B. Do not apply insulation when substrate temperatures are under 40 degrees F (4.4 degrees C) prior to installation.

C. Surfaces must be dry prior to application of spray foam. Excess humidity may cause poor adhesion, and result in product failure.

D. To avoid overspray, product should not be applied when conditions are windy.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Acceptable Manufacturer:

1.CertainTeed Corp., Insulation Group

2. ICYNENE LD-C-50TM by Icynene Inc

B. Substitutions: Not permitted.

C. Requests for substitutions will be considered in accordance with provisions of Section 01600.

2.2 SPRAY FOAM INSULATION

A. Insulation: Polyurethane water-blown type Open Cell Foam: Listed Manufacturers or approved equal; Open Cell Foam is a low density, MDI-based semi-rigid polyurethane foam:

1. Physical and Mechanical Properties:

a. Core Density: 0.45-0.55 pcf when tested in accordance with

ASTM D 1622.

b. Thermal Resistance: 3.6 when tested in accordance with ASTM C 518 at 75 degrees F, (h-ft2- degrees F)/Btu.

c. Open Cell Content: Greater than 95 percent when tested in accordance with ASTM D 2842.

d. Compressive Strength: Greater than 2.4 psi when tested in accordance with ASTM D 1621.

e. Tensile Strength: 5.2 psi when tested in accordance with

ASTM D 1623.

f. Water Absorption: Less than 30 percent by volume when tested in accordance with ASTM D 2842.

g. Dimensional Stability: Less than 12 percent by volume when tested in accordance with ASTM D 2126 at 75 degrees F/95 percent RH, 28 Days.

h. Water Vapor Transmission: 33 perm/inch when tested in accordance with ASTM E 96.

i. Air Permeability: 0.013 when tested in accordance with ASTM E 283 at 5-1/2 inch thickness, L/s/m2.

j. Fungi Resistance: Pass, with no growth when tested in accordance with ASTM C 1338.

2. Fire performance

a. Flame Spread: Less than 25 when tested in accordance with

ASTM E 84.

b. Smoke: Less than 400 when tested in accordance with ASTM E

84.

c. Oxygen Index 23 percent

3. Thermal Performance: Tested in accordance with ASTM C 518 and/or ASTM C 177 at 75 degrees F (24 degrees C) mean temperature.

a. Thickness 6 inches (152 mm), R-Value 21.6 (h-ft2-degreesF)/Btu (3.8 (m2-degreesC)/W).

PART 3 EXECUTION

3.1 EXAMINATION

A. Do not begin installation until substrates have been properly prepared.

B. Verify that all exterior and interior wall, partition, and floor/ceiling assembly construction has been completed to the point where the insulation may correctly be installed.

C. Verify that substrate and cavities are dry and free of any foreign material that will impede application.

D. Verify that mechanical and electrical services in ceilings, walls and floors have been installed and tested and, if appropriate, verify that adjacent materials are dry and ready to receive insulation.

E. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

3.2 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

C. Mask and protect adjacent surfaces from overspray or dusting.

3.3 INSTALLATION

A. Install in accordance with manufacturer's instructions. Product must be installed according to local code, and must be applied by a qualified applicator.

B. Apply insulation by spray method, to uniform monolithic density without voids.

C. Apply to minimum cured thickness as indicated on the Drawings or as scheduled at the end of this Section.

D. Apply to minimum cured thickness of ____ inches.

E. Apply to achieve thermal resistance R-Value of _____ .

F. Apply insulation to seal voids at truss ends to prevent wind scouring of ceiling insulation.

G. Seal plumbing stacks, electrical wiring and other penetrations into attic to control air leakage.

H. Apply insulation to fill voids around bathtubs to point of accessibility.

I. Apply insulation to fill voids around doors and windows. Apply insulation to fill voids around accessible service and equipment penetrations.

J. Do not install spray foam insulation in areas where it will be in contact with equipment or materials with operating temperatures of 180 degrees F (82 degrees C) or greater.

K. Apply insulation in unvented roof spaces and cathedral ceiling areas.

L. Where building is designed to meet the specific air tightness standards of the Energy Star Program, apply insulation as recommended by manufacturer to provide airtight construction. Apply sealant to joints between structural assemblies as specified in Division 7.

M. Patch damaged areas using a certified installer.

3.4 FIELD QUALITY CONTROL

A. Inspection will include verification of insulation and density.

3.5 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before Substantial Completion.

3.6 SCHEDULES

A. For the following locations, apply the average cured thickness indicated.

1. Building roof deck; underside between rafters; from ridge down to eaves. Protect ridge vent which shall remain open for attic ventilation.

END OF SECTION