32 92 19 Seeding.pdf
PDF 62 KB Posted
- Attached to
- Construct Latrine Annex Building Federal contract opportunity
- Solicitation number
- W911SF-20-B-0001
About this file
This document contains specifications for seeding work on a construction project. It outlines requirements for seed mixtures, topsoil, fertilizer, mulch and other erosion control materials. The specifications provide details on submittal requirements, storage and handling of materials, preparation work, seeding methods and protection of seeded areas. A related federal contract opportunity is also included for the construction of a latrine annex building in accordance with the statement of work, drawings and specifications provided.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Latrine Annex Building has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex Addition to B3010
SECTION 32 92 19
SEEDING
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 602 (1995a; R 2001) Agricultural Liming Materials
ASTM D 4427 (1992; R 2002e1) Peat Samples by Laboratory Testing
ASTM D 4972 (2001) pH of Soils
U.S. DEPARTMENT OF AGRICULTURE (USDA)
AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act
DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0
1.2 DEFINITIONS
1.2.1 Stand of Grass
95 percent ground cover of the established species.
1.3 RELATED REQUIREMENTS
Section 31 00 00 EARTHWORK, applies to this section for pesticide use and plant establishment requirements, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Wood cellulose fiber mulch
Fertilizer
Include physical characteristics, and recommendations.
SD-06 Test Reports
Topsoil composition tests (reports and recommendations).
SD-07 Certificates
State certification and approval for seed
SD-08 Manufacturer's Instructions
Erosion Control Materials
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.1.1 Seed Protection
Protect from drying out and from contamination during delivery, on-site storage, and handling.
1.5.1.2 Fertilizer Delivery
Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer and lime may be furnished in bulk with certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Seed and Fertilizer Storage
Store in cool, dry locations away from contaminants.
1.5.2.2 Topsoil
Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non-selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil.
1.5.2.3 Handling
Do not drop or dump materials from vehicles.
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.6.1 Restrictions
Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit.
1.7 TIME LIMITATIONS
1.7.1 Seed
Apply seed within twenty four hours after seed bed preparation.
PART 2 PRODUCTS
2.1 SEED
2.1.1 Classification
Provide State-certified seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weedseed content, and inert material. Label in conformance with AMS Seed Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will be rejected. Field mixes will be acceptable when field mix is performed on site in the presence of the Contracting Officer.
2.1.2 Planting Dates
Planting Season Planting Dates
Season 1 September 15 - April 15
Season 2 April 15 - September 15
Temporary Seeding Season 1 or Season 2
2.1.3 Seed Purity
Min. Min. Percent Max.
Botanical Common Percent Germination Percent Name Name Pure Seed and Hard Seed Weed Seed
Eremochia Centipede 95 85 1 Buse
Paspalum Bahia Grass 95 85 1 Notatum
Lolium Rye Grass 95 85 1 Perenne
2.1.4 Seed Mixture by Weight
Planting Season Variety Percent (by Weight)
Season 1 Centipede 15 Bahia Grass 70 Rye Grass 15
Season 2 Centipede 50 Bahia Grass 50
Temporary Seeding Season 1 Season 2
Proportion seed mixtures by weight. Temporary seeding must later be replaced by Season 1 or Season 2 plantings for a permanent stand of grass.
The same requirements of grass establishment for Season 1and Season 2 apply for temporary seeding.
2.2 TOPSOIL
2.2.1 On-Site Topsoil
Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site in accordance with Section 31 00 00
EARTHWORK 31 23 00.00 20 EXCAVATION AND FILL.
2.2.2 Off-Site Topsoil
Conform to requirements specified in paragraph entitled "Composition."
Additional topsoil shall be furnished by the Contractor.
2.2.3 Composition
Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits:
Silt 25-50 percent Clay 10-30 percent Sand 20-35 percent pH 5.5 to 7.0 Soluble Salts 600 ppm maximum
2.3 SOIL CONDITIONERS
Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein.
2.3.1 OMITTED
2.3.2 OMITTED
2.3.3 OMITTED
2.3.4 OMITTED
2.3.5 Peat
Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation.
2.3.6 Sand
Clean and free of materials harmful to plants.
2.3.7 Perlite
Horticultural grade.
2.3.8 Composted Derivatives
Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:
2.3.8.1 Particle Size
Minimum percent by weight passing:
No. 4 mesh screen 95 No. 8 mesh screen 80
2.3.8.2 Nitrogen Content
Minimum percent based on dry weight:
Fir Sawdust 0.7 Fir or Pine Bark 1.0
2.3.9 OMITTED
2.3.10 OMITTED
2.4 FERTILIZER
2.4.1 Granular Fertilizer
Synthetic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:
13 percent available nitrogen 13 percent available phosphorus 13 percent available potassium
2.4.2 OMITTED
2.5 MULCH
Mulch shall be free from noxious weeds, mold, and other deleterious materials.
2.5.1 Straw
Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw shall contrain no fertile seed.
2.5.2 Hay
Air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Hay shall be sterile, containing no fertile seed.
2.5.3 Wood Cellulose Fiber Mulch
Use recovered materials of either paper-based (100 percent) or wood-based (100 percent) hydraulic mulch. Processed to contain no growth or germination-inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 5.5 to 8.2. Use with hydraulic application of grass seed and fertilizer.
2.6 WATER
Source of water shall be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life.
2.7 EROSION CONTROL MATERIALS
Erosion control material shall conform to the following:
2.7.1 Erosion Control Blanket
100 percent agricultural straw stitched with a degradable nettings, designed to degrade within 12 months.
2.7.2 Erosion Control Fabric
Fabric shall be knitted construction of polypropylene yarn with uniform mesh openings 3/4 to 1 inch square with strips of biodegradable paper.
Filler paper strips shall have a minimum life of 6 months.
2.7.3 Erosion Control Net
Net shall be heavy, twisted jute mesh, weighing approximately 1.22 pounds per linear yard and 4 feet wide with mesh openings of approximately 1 inch square.
2.7.4 Hydrophilic Colloids
Hydrophilic colloids shall be physiologically harmless to plant and animal life without phytotoxic agents. Colloids shall be naturally occurring, silicate powder based, and shall form a water insoluble membrane after curing. Colloids shall resist mold growth.
2.7.5 Erosion Control Material Anchors
Erosion control anchors shall be as recommended by the manufacturer.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 EXTENT OF WORK
Provide soil preparation (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.
3.1.1.1 Topsoil
Provide 4 inches of off-site topsoil to meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.
3.1.1.2 OMITTED
3.1.1.3 Fertilizer Application Rates
Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site. For bidding purposes only apply at rates for the following:
Synthetic Fertilizer 50 pounds per acre.
3.2 SEEDING
3.2.1 Seed Application Seasons and Conditions
Immediately before seeding, restore soil to proper grade. Do not seed when ground is muddy frozen snow covered or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the Contracting Officer stating the special conditions and proposed variance.
Apply seed within twenty four hours after seedbed preparation. Sow seed by approved sowing equipment. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing.
3.2.2 Seed Application Method
Seeding method shall be hydroseeding.
3.2.2.1 OMITTED
3.2.2.2 OMITTED
3.2.2.3 Hydroseeding
First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. Fiber shall be added at 1,000 pounds, dry weight, per acre. Then add and mix seed and fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure broadcasting at the rate of 6.5pounds per 1000 square feet. When hydraulically sprayed on the ground, material shall form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch.
3.2.3 Mulching
3.2.3.1 Hay or Straw Mulch
Hay or straw mulch shall be spread uniformly at the rate of 2 tons per acre.
Mulch shall be spread by hand, blower-type mulch spreader, or other approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading.
3.2.3.2 Mechanical Anchor
Mechanical anchor shall be a V-type-wheel land packer; a scalloped-disk land packer designed to force mulch into the soil surface; or other suitable equipment.
3.2.3.3 Asphalt Adhesive Tackifier
Asphalt adhesive tackifier shall be sprayed at a rate between 10 to 13 gallons per 1000 square feet. Sunlight shall not be completely excluded from penetrating to the ground surface.
3.2.3.4 Non-Asphaltic Tackifier
Hydrophilic colloid shall be applied at the rate recommended by the manufacturer, using hydraulic equipment suitable for thoroughly mixing with water. A uniform mixture shall be applied over the area.
3.2.3.5 Asphalt Adhesive Coated Mulch
Hay or straw mulch may be spread simultaneously with asphalt adhesive applied at a rate between 10 to 13 gallons per 1000 square feet, using power mulch equipment which shall be equipped with suitable asphalt pump and nozzle. The adhesive-coated mulch shall be applied evenly over the surface. Sunlight shall not be completely excluded from penetrating to the ground surface.
3.2.4 Rolling
Immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width.
If seeding is performed with cultipacker-type seeder or by hydroseeding, rolling may be eliminated.
3.2.5 Erosion Control Material
Install in accordance with manufacturer's instructions, where indicated or as directed by the Contracting Officer.
3.2.6 Watering
Start watering areas seeded as required by temperature and wind conditions. Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out.
3.3 PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
3.4 OMITTED
3.5 RESTORATION
Restore to original condition existing turf areas which have been damaged during turf installation operations at the Contractor's expense. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete.
-- End of Section --