About this file
This document contains a construction specification section outlining requirements for construction and demolition waste management on a federal construction project. The specification requires contractors to implement an efficient waste management plan to divert construction and demolition debris from landfills and incinerators through practices such as material source separation, recycling, reuse, and salvage. Contractors must designate staff responsible for waste management and submit a waste management plan within 15 days of the notice to proceed, including methods for waste reduction, recycling and disposal, types and quantities of waste generated, and cost savings estimates from material sales and avoided disposal costs. Records of waste diversion activities must also be maintained and submitted. Materials must be properly contained, stored and transported for recycling using either source separation or co-mingled collection methods. Reuse and recycling should be prioritized over disposal where economically feasible. Any waste materials must be disposed of at a permitted landfill or incinerator.
This related federal contract opportunity is to construct a latrine annex building at Fort Eustis in accordance with the attached statement of work, drawings and specifications, including Section 02 42 00 on construction and demolition waste management. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Latrine Annex Building has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex Addition to B3010
SECTION 02 42 00
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
04/06
PART 1 GENERAL
1.1 GOVERNMENT POLICY
Government policy is to apply sound environmental principles in the design, construction and use of facilities. As part of the implementation of that policy the Contractor shall: (1) practice efficient waste management when sizing, cutting, and installing products and materials and (2) use all reasonable means to divert construction and demolition waste from landfills and incinerators and to facilitate their recycling or reuse.
1.2 MANAGEMENT
The Contractor shall take a pro-active, responsible role in the management of construction and demolition waste and require all subContractors, vendors, and suppliers to participate in the effort. Construction and demolition waste includes products of demolition or removal, excess or unusable construction materials, packaging materials for construction products, and other materials generated during the construction process but not incorporated into the work. In the management of waste consideration shall be given to the availability of viable markets, the condition of the material, the ability to provide the material in suitable condition and in a quantity acceptable to available markets, and time constraints imposed by internal project completion mandates. The Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling of waste. Revenues or other savings obtained for salvage, or recycling shall accrue to the Contractor.
Firms and facilities used for recycling, reuse, and disposal shall be appropriately permitted for the intended use to the extent required by federal, state, and local regulations.
1.3 PLAN
A waste management plan shall be submitted within 15 days after notice to proceed and prior to initiating any site preparation work. The plan shall include the following:
a. Name of individuals on the Contractor's staff responsible for waste prevention and management.
b. Actions that will be taken to reduce solid waste generation.
c. Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas and equipment to be used for processing, sorting, and temporary storage of wastes.
d. Characterization, including estimated types and quantities, of the waste to be generated.
e. Name of landfill and/or incinerator to be used and the estimated costs for use, assuming that there would be no salvage or recycling on the project.
f. Identification of local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity.
g. List of specific waste materials that will be salvaged for resale, salvaged and reused, or recycled. Recycling facilities that will be used shall be identified.
h. Identification of materials that cannot be recycled/reused with an explanation or justification.
i. Anticipated net cost savings determined by subtracting Contractor program management costs and the cost of disposal from the revenue generated by sale of the materials and the incineration and/or landfill cost avoidance.
1.4 RECORDS
Records shall be maintained to document the quantity of waste generated;
the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. The records shall be made available to the Contracting Officer during construction, and a copy of the records shall be delivered to the Contracting Officer upon completion of the construction.
1.5 COLLECTION
The necessary containers, bins and storage areas to facilitate effective waste management shall be provided and shall be clearly and appropriately identified. Recyclable materials shall be handled to prevent contamination of materials from incompatible products and materials and separated by one of the following methods:
1.5.1 Source Separated Method.
Waste products and materials that are recyclable shall be separated from trash and sorted into appropriately marked separate containers and then transported to the respective recycling facility for further processing.
1.5.2 Co-Mingled Method.
Waste products and recyclable materials shall be placed into a single container and then transported to a recycling facility where the recyclable materials are sorted and processed.
1.5.3 Other Methods.
Other methods proposed by the Contractor may be used when approved by the Contracting Officer.
1.6 DISPOSAL
Except as otherwise specified in other sections of the specifications, disposal shall be in accordance with the following:
1.6.1 Reuse.
First consideration shall be given to salvage for reuse since little or no re-processing is necessary for this method, and less pollution is created when items are reused in their original form. Sale or donation of waste suitable for reuse shall be considered. Salvaged materials, other than those specified in other sections to be salvaged and reinstalled, shall not be used in this project.
1.6.2 Recycle.
Waste materials not suitable for reuse, but having value as being recyclable, shall be made available for recycling whenever economically feasible.
1.6.3 Waste.
Materials with no practical use or economic benefit shall be disposed at a landfill or incinerator.
-- End of Section --