This document package includes construction drawings and specifications for a federal contract solicitation to construct a latrine annex building. The solicitation seeks to construct an annex to Building 3010 in accordance with the attached scope of work, drawings, and specifications. The drawings depict the electrical, lighting, and power plans for the latrine annex and include notes specifying fixture types and installation requirements. The solicitation number is W911SF-20-B-0001 and was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis for a latrine annex at Fort Benning, Georgia. Responses are due in accordance with the standard solicitation response timeline.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Latrine Annex Building, newest first.
File Type Posted
W911SF-20-B-0001-0003 Solicitation Latrine Annex Building 3010 Amendment 0003.pdf PDF
3010 Latrine 144R.PDF PDF
UFGS 22 00 00 Plumbing, General Purpose.pdf PDF
03 20 01.00 10 Conc Reinf.pdf PDF
06 20 00 Finish Carpentry.pdf PDF
10 21 13 Toilet Partition.pdf PDF
26 20 00.pdf PDF
26 24 16.00 40.pdf PDF
26 00 00.00 20.pdf PDF
23 08 00 Commissioning of HVAC Systems.pdf PDF
32 92 19 Seeding.pdf PDF
SOW B3010 Latrine Addition 12 NOV 19-REVISED.pdf PDF
08 71 00 Steel Doors and Frames.pdf PDF
00 00 00 1 COVER-44054.pdf PDF
26B3010 Elec. Cut Sheet 2.pdf PDF
31 23 00 Excavation and Fill.pdf PDF
07 21 40 Spray Foam Insul.pdf PDF
22 00 00 Plumbing, General Purpose.pdf PDF
32 92 23 Sodding.pdf PDF
33 40 00.00 40 Storm Sewerage.pdf PDF
05 40 00 Cold Form Steel Framing.pdf PDF
23 03 00 Basic Materials and Methods.pdf PDF
31 32 11 Soil Surface Erosion Control.pdf PDF
01 32 01_00 10 Project Sch.pdf PDF
31 00 00 Earthwork.pdf PDF
09 70 5 Resinous Flooring.pdf PDF
23 07 00 Thermal Insulation for Mechanical Systems.pdf PDF
04 20 00 Masonry.pdf PDF
09 29 00 Gypsum Board.pdf PDF
06 61 16 Solid Polymer Fab.pdf PDF
22 07 19.00 40 Plumbing Piping Insulation.pdf PDF
23 23 00 Refrigerant Piping.pdf PDF
26B3010 Elec. Cut Sheet 1.pdf PDF
26 29 02.00 10.pdf PDF
02 41 00 Demolition.pdf PDF
07 60 00 Flashg and Sheet Met.pdf PDF
Wage Determination (Muscogee County).pdf PDF
31 31 16 Soil Treatment for Subterranean Termite Control.pdf PDF
Price Proposal Breakdown.xlsx XLSX spreadsheet
32 15 00 Aggregate Surface Course.pdf PDF
00 62 35 Recycled Recoverd Materials.pdf PDF
01 45 04_00 10 Contractor Quality Control.pdf PDF
01 57 20 Environmental Protection.pdf PDF
26 29 23.pdf PDF
01 57 23 Storm Water Pollution Prevention Measures.pdf PDF
07 84 00 Firestopping.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
03 30 04 Concrete for Structures.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
05 12 00 Structural Steel.pdf PDF
Show all 50

Construct Latrine Annex Building has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL SITE PLAN

E1

SCALE OF FEET

050 50 100

1 ELECTRICAL SITE PLAN

E1

SCALE: 50’ = 1’-0"

SPECIAL ELECTRICAL KEYED NOTES:

4 5

6 7

44054-E1

TO THE LIVE-SIDE OF THE POWER METER BASE (DIRECTIONAL BORING).

FLINT ELECTRIC WILL PROVIDE AND RUN THE UNDERGROUND SECONDARY POWER CABLES FROM THE 75KVA PAD-MOUNTED TRANSFORMER

225A, 120/208V, THREE-PHASE, AND FOUR-WIRE PANELBOARD (PANEL NL) INSIDE THE LATRINE.

ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL POWER CABLES FROM THE LOAD-SIDE OF THE POWER METER TO THE NEW

THE KNOX BOX.

CONTRACTOR SHALL PROVIDE AND INSTALL A KNOX BOX NEAR THE DISCONNECT SWITCH. THE PAD-LOCK KEY SHALL PUT INSIDE

ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL A DISCONNECT SWITCH NEAR THE POWER METER BASE WITH THE PAD-LOCK.

ON THE EXTERIOR WALL OF THE NEW LATRINE ADDITION NEAR BUILDING 3010 AS INDICATED ON THE DRAWING.

ELECTRICAL CONTRACTOR SHALL OBTAIN THE POWER METER BASE FROM FLINT ELECTRIC AND INSTALL THE POWER METER BASE

75KVA, 120/208V, THREE-PHASE, PAD-MOUNTED TRANSFORMER (DIRECTIONAL BORING) AS INDICATED ON THE DRAWING.

FLINT ELECTRIC WILL PROVIDE AND RUN THE UNDERGROUND PRIMARY CABLES FROM THE MEDIUM VOLTAGE JUNCTION BOX TO THE

ON THE DRAWING.

FLINT ELECTRIC WILL PROVIDE AND INSTALL A 75KVA, 120/208V, THREE-PAHSE PAD-MOUNTED TRANSFORMER AS INDICATED

FLINT ELECTRIC WILL PROVIDE AND INSTALL A 3-PHASE MEDIUM VOLTAGE JUNCTION BOX AS INDICATED ON THE DRAWING.

BID DOCUMENTS

85% DESIGN

D A

T E

S Y

M B

O L

R E

V

IS

IO

N S

B Y

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

DATE

L&E NO:

NOTED

D. SAYLOR

K. CHAN

DIRECTORATEDIRECTORATE

OF PUBLIC WORKS

FORT BENNING, GEORGIA

01 NOV 19

FORT BENNING, GEORGIA

BUILDING 3010 FOR 30TH AG

NEW LATRINE ADDITION

E N

TE

R

E X

IT

C O R R

ID

O R

M E C H

AU

D

ITO

R

IU

M

P R O C E S S

IN

G

O P E N

B R E E Z

W

AY

E X

IS

TIN

G

B

LD

G

S3S3

S

THE HARD CEILING

MEZZANINE ABOVE

S

NL-1

NL-3

NL-5

SCALE: 1/4" = 1’-0"

SCALE: 1/4" = 1’-0"

LED WALL

CAT# ELM2-LED-HO (NO REMOTES) - EXTENDED RUN-TIME FOR HIGH-OUTPUT UNIT

LITHONIA LIGHTING - M12 LED THERMOPLASTIC EMERGENCY LIGHT WITH NI-CAD BATTERY

A

TYPE LAMP MOUNTING

E LED SURFACE

FIXTURE SCHEDULE

WALL

SURFACE

AE

LED

LED

B LED

LEDBE

C LED H.E.WILLIANS, INC. CAT# 39W-4-L52/840-A-EM/10WLP-DRV-UNV

LITHONIA LIGHTING CAT# LHQM-LED-R-HO-SD

LED COOPER LIGHTING - CROSSTOUR MAXX LED WALL AND SITE LUMINAIRE

F

(NICKEL-CADMIUM BATTERY) AND SELF-DIAGNOSTICS CAPABILITY

LHQM LED EXIT SIGN (WHITE HOUSING AND RED LETTER COLOR) WITH TWO LED LAMP HEADS

EFFICACY AND ENERGY EFFICIENCY. MADE IN USA

DESIGNED FOR SURFACE OR SUSPENDED APPLICATIONS. LED TECHNOLOGY PROVIDES HIGH

D

AND VOLUMETRIC DISTRIBUTION. HIGH EFFICACT LED LIGHT ENGINES.

FEATURES A POPULAR CENTER BASKET DESIGN THAT OFFERS A CLEAN, VERSATILE STYLE

LITHONIA LIGHTING CAT# BLTX4-48L-ADP-EZ1-LP840-NESPDT7

SURFACE

AND VOLUMETRIC DISTRIBUTION. HIGH EFFICACT LED LIGHT ENGINES.

FEATURES A POPULAR CENTER BASKET DESIGN THAT OFFERS A CLEAN, VERSATILE STYLE

LITHONIA LIGHTING CAT# BLTX4-48L-ADP-EZ1-LP840-NESPDT7-EL14L

SURFACE

AND VOLUMETRIC DISTRIBUTION. HIGH EFFICACT LED LIGHT ENGINES.

FEATURES A POPULAR CENTER BASKET DESIGN THAT OFFERS A CLEAN, VERSATILE STYLE

LITHONIA LIGHTING CAT# 2BLTX2-40L-ADP-EZ1-LP840-NESPDT7

SURFACE

AND VOLUMETRIC DISTRIBUTION. HIGH EFFICACT LED LIGHT ENGINES.

FEATURES A POPULAR CENTER BASKET DESIGN THAT OFFERS A CLEAN, VERSATILE STYLE

LITHONIA LIGHTING CAT# 2BLTX2-40L-ADP-EZ1-LP840-NESPDT7-EL14L

0’ 5’12" 10’

SCALE: 1/4 INCH = 1 FOOT

ELECTRICAL LIGHTING PLANS

ELECTRICAL LIGHTING PLAN - MEZZANINE

ELECTRICAL LIGHTING PLAN - LATRINE

A

A

A

A

A

AE

A

A

A

A

A

AE

B

BB

B

BE

BE

DD

EE

FF

A

AE

B

BE

C

LEGEND

S

S

E

F

CIRCUIT

UNSWITCHED

TO AN

CIRCUIT

UNSWITCHED

TO AN

SPECIAL ELECTRICAL KEYED NOTES:

LED LIGHT FIXTURE

EXTERIOR WALL MOUNT

1’ X 4’ LED FIXTURE

2’ X 2’ LED FIXTURE

2’ X 2’ LED FIXTURE

1’ X 4’ LED FIXTURE

1’ X 4’ LED FIXTURE

D LIGHT SWITCH

LIGHT SWITCH

OCCUPANCY SENSING

SENSOR

CEILING MOUNT OCCUPANCY

UNIT

EMERGENCY LIGHTING

FIXTURE

EXIT SIGN LED

SURFACE

CAT# XTOR8B-W (120V POWER)

E2

E2

44054-E2

E2

CC

CC

TYP.

TYP.

B

TYP.

TYP.

TYP.

ALL EXIT SIGN FIXTURES AND EMERGENCY LIGHTING UNITS SHALL BE INSTALLED ON AN UNSWITCHED CIRCUIT.

PROVIDE AND INSTALL CEILING MOUNT OCCUPANCY SENSOR AS INDICATED ON DRAWING.

PASSIVE INFRARED SENSOR TECHNOLOGY TO MONITOR A ROOM FOR OCCUPANCY.

INSTALL MULTI-TECHNOLOGY OCCUPANCY SENSORS (MTOS) WALL SWITCH AS INDICATED ON DRAWING. THE MTOS WALL SWITCH SHALL COMBINE BOTH ULTRASONIC AND

PROVIDE AND INSTALL A TOGGLE SWITCH ON THE JANITOR CLOSET. MOUNT THE SWITCH AT 48-INCH ABOVE THE FINISHED FLOOR.

PROVIDE AND INSTALL OCCUPANCY SENSING WALL SWITCH WITH MANUAL OVERRIDE IN ALL THE LATRINE. MOUNT THE SWITCHES AT 48-INCH ABOVE FINISHED FLOOR.

PROVIDE AND INSTALL LOCAL SWITCHING AS INDICATED ON THE DRAWING.

PACK FOR THE DESIGNATED EMERGENCY LIGHT FIXTURES IN THE BUILDING TO MAINTAIN NFPA 101 LIFE SAFETY REQUIREMENT.

SELECT FIXTURES THROUGHOUT BUILDING WILL BE USED FOR EMERGENCY LIGHTING. CONTRACTOR IS REQUIRED TO PROVIDE AND INSTALL THE EMERGENCY BATTERY

PROVIDE AND INSTALL M12 LED EMERGENCY LIGHTING UNIT WITH TWO LAMP HEADS (FIXTURE F) AS INDICATED ON DRAWING.

AS INDICATED ON DRAWING.

PROVIDE AND INSTALL WALL MOUNT OR CEILING MOUNT LED EXIT SIGN FIXTURE WITH TWO (2) LED LAMP HEADS (FIXTURE E) AND SELF DIAGNOSTICS CAPABILITY

WITH PHOTO-CELL CONTROL.

PROVIDE AND INSTALL CROSSTOUR MAXX LED WALL AND SITE LUMINAIRE (FIXTURE D) AS INDICATED ON DRAWING. CONNECT THE EXTERIOR WALL MOUNT FIXTURES

ON THE ROOF STRUCTURE TO SUPPORT THE FIXTURES.

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE C) AS INDICATED ON DRAWING. PROVIDE AND INSTALL MOUNTING STRUCTURE

SURFACE-MOUNTED THE FIXTURE ON THE CENTER OF THE 4’X4’ SQUARE ON THE CEILING.

PROVIDE AND INSTALL 2’X2’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE BE) WITH 1400 NOMINAL LUMEN BATTERY PACK AS INDICATED ON DRAWING.

THE CENTER OF THE 4’X4’ SQUARE ON THE CEILING.

PROVIDE AND INSTALL 2’X2’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE B) AS INDICATED ON DRAWING. SURFACE-MOUNTED THE FIXTURE ON

SURFACE MOUNTED THE FIXTURE ON THE CEILING, CLOSE TO THE WALL.

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE AE) WITH 1400 NOMINAL LUMEN BATTERY PACK AS INDICATED ON DRAWING.

THE CEILING CLOSE TO THE WALL.

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE A) AS INDICATED ON DRAWING. SURFACE-MOUNTED THE FIXTURE ON

9 10 11 12 13 14 15

ALL EXIT SIGN FIXTURES AND EMERGENCY LIGHTING UNITS SHALL BE INSTALLED ON AN UNSWITCHED CIRCUIT.

PROVIDE AND INSTALL CEILING MOUNT OCCUPANCY SENSOR AS INDICATED ON DRAWING.

PASSIVE INFRARED SENSOR TECHNOLOGY TO MONITOR A ROOM FOR OCCUPANCY.

INSTALL MULTI-TECHNOLOGY OCCUPANCY SENSORS (MTOS) WALL SWITCH AS INDICATED ON DRAWING. THE MTOS WALL SWITCH SHALL COMBINE BOTH ULTRASONIC AND

PROVIDE AND INSTALL A TOGGLE SWITCH ON THE JANITOR CLOSET. MOUNT THE SWITCH AT 48-INCH ABOVE THE FINISHED FLOOR.

PROVIDE AND INSTALL OCCUPANCY SENSING WALL SWITCH WITH MANUAL OVERRIDE IN ALL THE LATRINE. MOUNT THE SWITCHES AT 48-INCH ABOVE FINISHED FLOOR.

PROVIDE AND INSTALL LOCAL SWITCHING AS INDICATED ON THE DRAWING.

PACK FOR THE DESIGNATED EMERGENCY LIGHT FIXTURES IN THE BUILDING TO MAINTAIN NFPA 101 LIFE SAFETY REQUIREMENT.

SELECT FIXTURES THROUGHOUT BUILDING WILL BE USED FOR EMERGENCY LIGHTING. CONTRACTOR IS REQUIRED TO PROVIDE AND INSTALL THE EMERGENCY BATTERY

PROVIDE AND INSTALL M12 LED EMERGENCY LIGHTING UNIT WITH TWO LAMP HEADS (FIXTURE F) AS INDICATED ON DRAWING.

AS INDICATED ON DRAWING.

PROVIDE AND INSTALL WALL MOUNT OR CEILING MOUNT LED EXIT SIGN FIXTURE WITH TWO (2) LED LAMP HEADS (FIXTURE E) AND SELF DIAGNOSTICS CAPABILITY

WITH PHOTO-CELL CONTROL.

PROVIDE AND INSTALL CROSSTOUR MAXX LED WALL AND SITE LUMINAIRE (FIXTURE D) AS INDICATED ON DRAWING. CONNECT THE EXTERIOR WALL MOUNT FIXTURES

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE C) AS INDICATED ON DRAWING. PROVIDE AND INSTALL MOUNTING STRUCTURE

PROVIDE AND INSTALL 2’X2’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE BE) WITH 1400 NOMINAL LUMEN BATTERY PACK AS INDICATED ON DRAWING.

THE CENTER OF THE 4’X4’ SQUARE ON THE CEILING.

PROVIDE AND INSTALL 2’X2’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE B) AS INDICATED ON DRAWING. SURFACE-MOUNTED THE FIXTURE ON

SURFACE MOUNTED THE FIXTURE ON THE CEILING, CLOSE TO THE WALL.

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE AE) WITH 1400 NOMINAL LUMEN BATTERY PACK AS INDICATED ON DRAWING.

THE CEILING CLOSE TO THE WALL.

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE A) AS INDICATED ON DRAWING. SURFACE-MOUNTED THE FIXTURE ON1

SPECIAL ELECTRICAL KEYED NOTES:

SPECIAL ELECTRICAL KEYED NOTES:

MEZZANINE FLOOR UP TO THE ROOF STRUCTURE.

PROVIDE AND INSTALL A MOUNTING STRUCTURE ABOVE THE MEZZANINE FOR THE LIGHT SWITCH AND RECEPTACLE. THE MOUNTING STRUCTURE SHALL BE BUILT FROM THE

ALL EXIT SIGN FIXTURES AND EMERGENCY LIGHTING UNITS SHALL BE INSTALLED ON AN UNSWITCHED CIRCUIT.

PROVIDE AND INSTALL CEILING MOUNT OCCUPANCY SENSOR AS INDICATED ON DRAWING.

PASSIVE INFRARED SENSOR TECHNOLOGY TO MONITOR A ROOM FOR OCCUPANCY.

INSTALL MULTI-TECHNOLOGY OCCUPANCY SENSORS (MTOS) WALL SWITCH AS INDICATED ON DRAWING. THE MTOS WALL SWITCH SHALL COMBINE BOTH ULTRASONIC AND

PROVIDE AND INSTALL A TOGGLE SWITCH ON THE JANITOR CLOSET. MOUNT THE SWITCH AT 48-INCH ABOVE THE FINISHED FLOOR.

PROVIDE AND INSTALL OCCUPANCY SENSING WALL SWITCH WITH MANUAL OVERRIDE IN ALL THE LATRINE. MOUNT THE SWITCHES AT 48-INCH ABOVE FINISHED FLOOR.

PROVIDE AND INSTALL LOCAL SWITCHING AS INDICATED ON THE DRAWING.

PACK FOR THE DESIGNATED EMERGENCY LIGHT FIXTURES IN THE BUILDING TO MAINTAIN NFPA 101 LIFE SAFETY REQUIREMENT.

SELECT FIXTURES THROUGHOUT BUILDING WILL BE USED FOR EMERGENCY LIGHTING. CONTRACTOR IS REQUIRED TO PROVIDE AND INSTALL THE EMERGENCY BATTERY

PROVIDE AND INSTALL M12 LED EMERGENCY LIGHTING UNIT WITH TWO LAMP HEADS (FIXTURE F) AS INDICATED ON DRAWING.

AS INDICATED ON DRAWING.

PROVIDE AND INSTALL WALL MOUNT OR CEILING MOUNT LED EXIT SIGN FIXTURE WITH TWO (2) LED LAMP HEADS (FIXTURE E) AND SELF DIAGNOSTICS CAPABILITY

WITH PHOTO-CELL CONTROL.

PROVIDE AND INSTALL CROSSTOUR MAXX LED WALL AND SITE LUMINAIRE (FIXTURE D) AS INDICATED ON DRAWING. CONNECT THE EXTERIOR WALL MOUNT FIXTURES

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE C) AS INDICATED ON DRAWING. PROVIDE AND INSTALL MOUNTING STRUCTURE

PROVIDE AND INSTALL 2’X2’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE BE) WITH 1400 NOMINAL LUMEN BATTERY PACK AS INDICATED ON DRAWING.

THE CENTER OF THE 4’X4’ SQUARE ON THE CEILING.

PROVIDE AND INSTALL 2’X2’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE B) AS INDICATED ON DRAWING. SURFACE-MOUNTED THE FIXTURE ON

SURFACE MOUNTED THE FIXTURE ON THE CEILING, CLOSE TO THE WALL.

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE AE) WITH 1400 NOMINAL LUMEN BATTERY PACK AS INDICATED ON DRAWING.

THE CEILING CLOSE TO THE WALL.

PROVIDE AND INSTALL 1’X4’, SURFACE MOUNT, LED LIGHT FIXTURE (FIXTURE A) AS INDICATED ON DRAWING. SURFACE-MOUNTED THE FIXTURE ON

BID DOCUMENTS

85% DESIGN

D A

T E

S Y

M B

O L

R E

V

IS

IO

N S

B Y

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

DATE

L&E NO:

NOTED

D. SAYLOR

K. CHAN

DIRECTORATEDIRECTORATE

OF PUBLIC WORKS

FORT BENNING, GEORGIA

01 NOV 19

FORT BENNING, GEORGIA

BUILDING 3010 FOR 30TH AG

NEW LATRINE ADDITION

OPEN BREEZWAY

0’ 5’12" 10’

SCALE: 1/4 INCH = 1 FOOT

GFIGFI

1 ELECTRICAL POWER PLAN - LATRINE

SCALE: 1/4" = 1’-0"

ELECTRICAL POWER PLAN - MEZZANINE

SCALE: 1/4" = 1’-0"

E3

E3

44054-E3

E3

ELECTRICAL POWER PLANS

NL-2

NL-6

NL-4

NL-8

SPECIAL ELECTRICAL KEYED NOTES:

GFI

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW NL-7

NL-9

NL-11

NL-13

NL-10

NL-12

NL-14

NL-15

NL-17

NL-19

NL-16

FAN

EXHAUST

GFI

WP

S

BID DOCUMENTS

85% DESIGN

WITH 32 CIRCUIT SPACES IN THE LATRINE.

PROVIDE AND INSTALL 225A, 120/208V, THREE-PHASE, AND 4-WIRE, RECESSED MOUNTED PANELBOARD

THE PAD-LOCK FOR THE DISCONNECT SWITCH.

METER BASE TO SHUT DOWN THE POWER SERVICE TO THE LATRINE DURING EMERGENCY. PROVIDE

ELECTRICAL CONTARCTOR SHALL PROVIDE AND INSTALL A DISCONNECT SWITCH NEXT TO THE POWER

WALL TO A NEW 225A, 120/208V, 3-PHASE, AND 4-WIRE PANELBOARD (PANEL NL) INSDIE THE LATRINE.

ELECTRICAL CONTRACTOR SHALL CONNECT THE LOAD-SIDE OF THE POWER METER BASE MOUNTED ON THE EXTERIOR

METER BASE ON THE EXTERIOR WALL AS INDICATED ON THE DRAWING.

ELECTRICAL CONTRACTOR SHALL OBTAIN THE POWER METER BASE FROM FLINT ELECTRIC AND INSTALL THE POWER

EXHAUST FAN CONTROL PER MECHANICAL SCOPE OF WORK AND DRAWING SPECIFICATIONS.

INSTALL POWER SERVICE TO THE EXHAUST FAN PER MANUFACTURER’S RECOMMENDATIONS. PROVIDE AND INSTALL

PROVIDE AND ISNTALL 120V, SINGLE-PHASE POWER SERVICE TO THE 1/4-HP EXHAUST FAN INSIDE THE LATRINE.

MANUFACTURER’S RECOMMENDATIONS.

WIRING, CONDUIT, CIRCUIT BREAKER, AND ENCLOSURE. INSTALL POWER SERVICE TO THE INDOOR UNIT PER

LATRINE. CONTRACTOR SHALL INSTALL DISCONNECT SWITCH AND CONNECT SWITCH TO POWER PANEL WITH PROPER

PROVIDE 208 VOLTS, 60 HZ, 3-PHASE POWER SERVICE TO THE INDOOR UNIT (RVE-40-30-30L-5D-R) INSIDE THE

(CD) UNIT PER MANUFACTURER’S RECOMMENDATIONS.

WIRING, CONDUIT, CIRCUIT BREAKER, AND ENCLOSURE. INSTALL POWER SERVICE TO THE OUTSIDE CONDENSER

LATRINE. CONTRACTOR SHALL INSTALL DISCONNECT SWITCH AND CONNECT SWITCH TO POWER PANEL WITH PROPER

PROVIDE 208 VOLTS, 60 HZ, 3-PHASE POWER SERVICE TO THE REMOTE CONDENSER UNIT (CD) OUTSIDE THE

DRAWINGS FOR DETAILS.

PROVIDE POWER TO THERMOSTATS THROUGHOUT THE LATRINE. REFER TO MECHANICAL SCOPE OF WORK AND

INSTANTANEOUS HOT WATER HEATER PER MANUFACTURER’S RECOMMENDATIONS.

THE ECO SMART INSTANTANEOUS HOT WATER HEATER UNDER THE MOP SINK. INSTALL POWER SERVICE TO THE

PROVIDE AND INSTALL 2 #10 AWG COPPER CABLES AND 1 #10 AWG COPPER GROUND IN 1/2-INCH CONDUIT FOR

INSTANTANEOUS HOT WATER HEATER PER MANUFACTURER’S RECOMMENDATIONS.

THE ECO SMART INSTANTANEOUS HOT WATER HEATER UNDER THE SINK. INSTALL POWER SERVICE TO THE

PROVIDE AND INSTALL 2 #10 AWG COPPER CABLES AND 1 #10 AWG COPPER GROUND IN 1/2-INCH CONDUIT FOR

SEE DRAWING SHEET 44054-E2.

MOUNTING STRUCTURE FOR THE LIGHT SWITCH AND RECEPTACLE NEAR THE STAIRWAY ABOVE THE MEZZANINE.

OUTLET NEXT TO THE LIGHT SWITCH ABOVE THE MEZZANINE NEAR THE STAIRWAY. PROVIDE AND INSTALL

PROVIDE AND INSTALL 120V, 20A, GENERAL DUPLEX RECEPTACLE AS INDICATED ON THE DRAWING. MOUNT THE

MOUNT THE OUTLET 18-INCH ABOVE THE FINISHED FLOOR.

PROVIDE AND INSTALL 120V, 20A, WEATHER-PROOF GFI RECEPTACLE CIRCUIT AS INDICATED ON THE DRAWING.

18-INCH ABOVE THE FINISHED FLOOR.

PROVIDE AND INSTALL 120V, 20A, GFI RECEPTACLE CIRCUIT AS INDICATED ON DRAWING. MOUNT THE OUTLETS

MOUNT THE OUTLETS 18-INCH ABOVE THE FINISHED FLOOR.

PROVIDE AND INSTALL 120V, 20A, DEDICATED GFI RECEPTACLE CIRCUIT FOR THE WATER DRINKING FOUNTAINS.

D A

T E

S Y

M B

O L

R E

V

IS

IO

N S

B Y

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

DATE

L&E NO:

NOTED

D. SAYLOR

K. CHAN

DIRECTORATEDIRECTORATE

OF PUBLIC WORKS

FORT BENNING, GEORGIA

01 NOV 19

FORT BENNING, GEORGIA

BUILDING 3010 FOR 30TH AG

NEW LATRINE ADDITION

OPEN BREEZWAY

AUDITORIUM

PROCESSING

110 112

CORRIDOR

MECHANICAL

44054-E4

E4

PANEL SCHEDULE

NO.

POLES

TRIP

AMPS

CIRC

NO.

LOAD SERVEDLOAD SERVED

NO.

POLES

TRIP

AMPS

CIRC

NO. CB

PHASE LOAD VA

A

PHASE 3 WIRES 4

PANEL AIC RATING: XX,000 AMPS

VOLTS 120/208SURFACE MOUNTED

LOCATION :

PANEL: NL

MCB: 225 A BY: KMC

100%

75%

TOTAL CONNECTED LOAD

ESTIMATED DEMAND LOAD

15 3

LTG ABOVE MEZZANINE

LTGS ON RIGHT SIDE

LTGS ON LEFT SIDE

ABOVE MEZZANINE REC

B3010 LATRINE

ADDITION

INSTANT. HW (JAN)

INSTANT. HW (1/3)

INSTANT. HW (2/3)

INSTANT. HW (3/3)

INSTANT. HW (2/4)

INSTANT. HW (3/4)

INSTANT. HW (4/4)

INSTANT. HW (1/2)

INSTANT. HW (2/2)

INSTANT. HW (1/4)

JANITOR/OUTSIDE REC

WATER FOUNTAIN REC R

WATER FOUNTAIN REC L

OUTDOOR UNIT

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

1/4-HP EXHAUST FAN

20500 17740 17040

41.46 KVA

55.28 KVA

DEMAND LINE AMPS = 115 A

45INDOOR UNIT 3

20 1SPARE20 1 SPARE

BID DOCUMENTS

85% DESIGN

D A

T E

S Y

M B

O L

R E

V

IS

IO

N S

B Y

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

DATE

L&E NO:

NOTED

D. SAYLOR

K. CHAN

DIRECTORATEDIRECTORATE

OF PUBLIC WORKS

FORT BENNING, GEORGIA

01 NOV 19

FORT BENNING, GEORGIA

BUILDING 3010 FOR 30TH AG

NEW LATRINE ADDITION

44054-A0
44054-C1
44054-C2
44054-C3
44054-A1
44054-A2
44054-A3
44054-A4
44054-A5
44054-A6
44054-A7
44054-A8
44054-M1
44054-P1
44054-P2
44054-P3
44054-P4
44054-E1
44054-E2
44054-E3
44054-E4
44054-E1
44054-E2
44054-E3
44054-E4

File details come from the government source that posted it. Updated .