This document contains specifications for sodding in the construction of a latrine annex building. The specifications cover sod types including Zenith Zoysia, soil amendments, fertilizers, and installation requirements. Sod must be nursery grown, machine cut to 3/4 inch thickness, and free of weeds, pests and disease. Topsoil must contain 5-10% organic matter and meet pH and particle size requirements. Installation includes finish grading, placing topsoil, laying sod within 36 hours of harvesting, watering, and rolling. The project will be carried out in accordance with the attached statement of work, drawings and specifications to construct a latrine annex building for the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Latrine Annex Building has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex Addition to B3010
SECTION 32 92 23 Page 1
SECTION 32 92 23
SODDING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 602 (2007) Agricultural Liming Materials
ASTM D 4427 (2007) Peat Samples by Laboratory Testing
ASTM D 4972 (2001; R 2007) pH of Soils
TURFGRASS PRODUCERS INTERNATIONAL (TPI)
TPI GSS (1995) Guideline Specifications to Turfgrass
Sodding
U.S. DEPARTMENT OF AGRICULTURE (USDA)
DOA SSIR 42 (1996) Soil Survey Investigation Report No.
42, Soil Survey Laboratory Methods Manual, Version 3.0
1.2 DEFINITIONS
1.2.1 Stand of Turf
100 percent ground cover of the established species.
1.3 RELATED REQUIREMENTS
Section 31 00 00 EARTHWORK, Section 32 93 00 EXTERIOR PLANTS, and Section 32 05 33 LANDSCAPE ESTABLISHMENT applies to this section for pesticide use and plant establishment requirements, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Product Data
Fertilizer
SECTION 32 92 23 Page 2
Include physical characteristics, and recommendations.
SD-02 Test Reports
Topsoil composition tests (reports and recommendations).
SD-03 Certificates
Nursery, Sod farm certification for sods. Indicate type of sod in accordance with TPI GSS.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.1.1 Sod Protection
Protect from drying out and from contamination during delivery, on-site storage, and handling.
1.5.1.2 Fertilizer, Gypsum, Sulfur, Iron, and Lime Delivery
Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum, sulphur, iron,and, lime may be furnished in bulk with certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Sod Storage
Lightly sprinkle with water, cover with moist burlap, straw, or other approved covering; and protect from exposure to wind and direct sunlight until planted. Provide covering that will allow air to circulate so that internal heat will not develop. Do not store sod longer than 24 hours. Do not store directly on concrete or bituminous surfaces.
1.5.2.2 Topsoil
Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non-selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil.
1.5.2.3 Handling
Do not drop or dump materials from vehicles.
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.6.1 Restrictions
Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 32 degrees Celsius( 90 degrees Fahrenheit).
SECTION 32 92 23 Page 3
1.7 TIME LIMITATIONS
1.7.1 Sod
Place sod a maximum of thirty six hours after initial harvesting, in accordance with TPI GSS as modified herein.
PART 2 PRODUCTS
2.1 SODS
2.1.1 Classification
Nursery grown, Zenith Zoysia, certified as classified in the TPI GSS.
Machine cut sod at a uniform thickness of 19 mm( 3/4 inch) within a tolerance of 6 mm( 1/4 inch), excluding top growth and thatch. Each individual sod piece shall be strong enough to support its own weight when lifted by the ends. Broken pads, irregularly shaped pieces, and torn or uneven ends will be rejected. Wood pegs and wire staples for anchorage shall be as recommended by sod supplier.
2.1.2 Purity
Sod species shall be genetically pure, free of weeds, pests, and disease.
2.1.3 Planting Dates
Lay sod from March 1 to August 31 for warm season spring planting and from September 1 to February 20 for cool season fall planting.
2.2 TOPSOIL
2.2.1 On-Site Topsoil
Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site.
2.2.2 Off-Site Topsoil
Conform to requirements specified in paragraph entitled "Composition."
Additional topsoil shall be furnished by the Contractor.
2.2.3 Composition
Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 19 mm( 3/4 inch), with maximum 3 percent retained on 6 mm( 1/4 inch) screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials.
2.3 SOIL CONDITIONERS
SECTION 32 92 23 Page 4
Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein.
2.3.1 Lime
Commercial grade hydrate or burnt limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C 602 of not less than 80 percent.
2.3.2 Aluminum Sulfate
Commercial grade.
2.3.3 Sulfur
100 percent elemental
2.3.4 Iron
100 percent elemental
2.3.5 Peat
Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427 as modified herein. Shred and granulate peat to pass a 12.5 mm( 1/2 inch) mesh screen and condition in storage pile for minimum 6 months after excavation.
2.3.6 Sand
Clean and free of materials harmful to plants.
2.3.7 Perlite
Horticultural grade.
2.3.8 Composted Derivatives
Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:
2.3.8.1 Particle Size
Minimum percent by weight passing:
4.75 mm(No. 4 mesh) screen 95
2.36 mm(No. 8 mesh) screen 80
2.3.8.2 Nitrogen Content
Minimum percent based on dry weight:
Fir Sawdust 0.7 Fir or Pine Bark 1.0
2.3.9 Gypsum
SECTION 32 92 23 Page 5
Coarsely ground gypsum comprised of calcium sulfate dihydrate 91 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 850 micrometers( 20 mesh screen), 100 percent passing thru 970 micrometers( 16 mesh) screen.
2.3.10 Calcined Clay
Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 650 degrees C. (1200 degrees F.)
Gradation: A minimum 90 percent shall pass a 2.36 mm (No. 8) sieve; a minimum 99 percent shall be retained on a 0.250 mm (No. 60) sieve; and a maximum 2 percent shall pass a 0.150 mm (No. 100) sieve. Bulk density: A maximum 640 kilogram per cubic meter (40 pounds per cubic foot).
2.4 FERTILIZER
2.4.1 Granular Fertilizer
Organic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:
50 percent available nitrogen 50 percent available phosphorus 50 percent available potassium 50 percent sulfur 50 percent iron
2.5 WATER
Source of water shall be approved by Contracting Officer and of suitable quality for irrigation containing no element toxic to plant life.
PART 3 EXECUTION
3.1 SODDING
3.1.1 Finished Grade and Topsoil
Prior to the commencement of the sodding operation, the Contractor shall verify that finished grades are as indicated on drawings; the placing of topsoil, smooth grading, and compaction requirements have been completed in accordance with Section 31 00 00 EARTHWORK 31 23 00.00 20 EXCAVATION AND
FILL.
The prepared surface shall be a maximum 25 mm(1 inch) below the adjoining grade of any surfaced area. New surfaces shall be blended to existing areas. The prepared surface shall be completed with a light raking to remove from the surface debris and stones over a minimum 16 mm(5/8 inch) in any dimension.
3.1.2 Placing
Place sod a maximum of 36 hours after initial harvesting, in accordance with TPI GSS as modified herein.
SECTION 32 92 23 Page 6
3.1.3 Sodding Slopes and Ditches
For slopes 2:1 and greater, lay sod with long edge perpendicular to the contour. For V-ditches and flat bottomed ditches, lay sod with long edge perpendicular to flow of water. Anchor each piece of sod with wood pegs or wire staples maximum 600 mm( 2 feet) on center. On slope areas, start sodding at bottom of the slope.
3.1.4 Finishing
After completing sodding, blend edges of sodded area smoothly into surrounding area. Air pockets shall be eliminated and a true and even surface shall be provided. Frayed edges shall be trimmed and holes and missing corners shall be patched with sod.
3.1.5 Rolling
Immediately after sodding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 34kg per m( 90 pounds) for each foot of roller width.
3.1.6 Watering
Start watering areas sodded as required by daily temperature and wind conditions. Apply water at a rate sufficient to ensure thorough wetting of soil to minimum depth of 150mm( 6 inches). Run-off, puddling, and wilting shall be prevented. Unless otherwise directed, watering trucks shall not be driven over turf areas. Watering of other adjacent areas or plant material shall be prevented.
3.2 PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
3.3 RENOVATION OF EXISTING TURF AREA
Blend all parts of topdressing mixture to a uniform consistency throughout.] Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean all soil plugs off of other paving when work is complete.
3.4 RESTORATION
Restore to original condition existing turf areas which have been damaged during turf installation operations. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete.
-- End of Section --