09 70 5 Resinous Flooring.pdf

PDF 96 KB Posted

Attached to
Construct Latrine Annex Building Federal contract opportunity
Solicitation number
W911SF-20-B-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document contains a technical specification for a resinous flooring system and a related federal contract opportunity to construct a latrine annex building. The technical specification outlines requirements for a multi-coat epoxy flooring system to be installed over existing ceramic tile flooring in shower and shower walkway areas. It specifies product submittal requirements including samples, warranties, and installer qualifications. The system must be waterproof, chemical and thermal shock resistant with a minimum thickness of 1/8 to 3/16 inches. The related federal contract opportunity is to construct a latrine annex building for the Department of the Army at Fort Eustis in accordance with attached statements of work, drawings and specifications, including the resinous flooring system.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Latrine Annex Building, newest first.
File Type Posted
W911SF-20-B-0001-0003 Solicitation Latrine Annex Building 3010 Amendment 0003.pdf PDF
3010 Latrine 144R.PDF PDF
UFGS 22 00 00 Plumbing, General Purpose.pdf PDF
03 20 01.00 10 Conc Reinf.pdf PDF
06 20 00 Finish Carpentry.pdf PDF
10 21 13 Toilet Partition.pdf PDF
26 20 00.pdf PDF
26 24 16.00 40.pdf PDF
26 00 00.00 20.pdf PDF
23 08 00 Commissioning of HVAC Systems.pdf PDF
32 92 19 Seeding.pdf PDF
SOW B3010 Latrine Addition 12 NOV 19-REVISED.pdf PDF
08 71 00 Steel Doors and Frames.pdf PDF
00 00 00 1 COVER-44054.pdf PDF
26B3010 Elec. Cut Sheet 2.pdf PDF
31 23 00 Excavation and Fill.pdf PDF
07 21 40 Spray Foam Insul.pdf PDF
22 00 00 Plumbing, General Purpose.pdf PDF
32 92 23 Sodding.pdf PDF
33 40 00.00 40 Storm Sewerage.pdf PDF
05 40 00 Cold Form Steel Framing.pdf PDF
23 03 00 Basic Materials and Methods.pdf PDF
31 32 11 Soil Surface Erosion Control.pdf PDF
01 32 01_00 10 Project Sch.pdf PDF
31 00 00 Earthwork.pdf PDF
23 07 00 Thermal Insulation for Mechanical Systems.pdf PDF
04 20 00 Masonry.pdf PDF
09 29 00 Gypsum Board.pdf PDF
06 61 16 Solid Polymer Fab.pdf PDF
22 07 19.00 40 Plumbing Piping Insulation.pdf PDF
23 23 00 Refrigerant Piping.pdf PDF
26B3010 Elec. Cut Sheet 1.pdf PDF
26 29 02.00 10.pdf PDF
44054-Complete Bid Set 12NOV.pdf PDF
02 41 00 Demolition.pdf PDF
07 60 00 Flashg and Sheet Met.pdf PDF
Wage Determination (Muscogee County).pdf PDF
31 31 16 Soil Treatment for Subterranean Termite Control.pdf PDF
Price Proposal Breakdown.xlsx XLSX spreadsheet
32 15 00 Aggregate Surface Course.pdf PDF
00 62 35 Recycled Recoverd Materials.pdf PDF
01 45 04_00 10 Contractor Quality Control.pdf PDF
01 57 20 Environmental Protection.pdf PDF
26 29 23.pdf PDF
01 57 23 Storm Water Pollution Prevention Measures.pdf PDF
07 84 00 Firestopping.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
03 30 04 Concrete for Structures.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
05 12 00 Structural Steel.pdf PDF
Show all 50

Construct Latrine Annex Building has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex Addition to B3010

SECTION 09 70 05 Page 1

SECTION 09 70 05

RESINOUS FLOORING

(Floor Stone Epoxy Coating)

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Monolithic multi coat overlay floor system for shower and shower walkways installed over existing ceramic tile flooring to provide a waterproof finish floor system.

B. Provide labor and materials for a pre-engineered and tested multiple component, slip resistant, seamless, anti-microbial, water, chemical & thermal shock resistant, high performance epoxy flooring system, including surface preparation, primers, sub-coat and finish coat.

1.02 RELATED SECTIONS

A. Demolition - Division 3 coordinate with the work of this section. Ceramic wall and floor repair shall be coordinated with this section.

1.03 Product

A. Manufacturer: approved and submitted materials for approval (prior to the proposal date) shall be equal to the Basis for design product Stonshield Broadcast standard texture as manufactured by STONHARD. Preapproved products manufactured by one the following

1. DUR-A-FLEX INC; 1-800-253-3539

2. KEY COMMERCIAL; 888-943-4532

3. STONEHARD; 1-800-257-3112

4. An approved equal product approved by the Government prior to the bid/proposal date in accordance with the bid proposal documents.

1.04 DELIVERY, STORAGE AND HANDLING

A. Deliver all materials to job site in clean, clearly labeled containers and inspected prior to start of the project work.

B. Store material in a dry, enclosed area protected from the elements as required by the manufacturer. Keep temperature of storage area between 60o and 90o F.

1.05 ENVIRONMENTAL REQUIREMENTS

A. Cure new and repaired concrete or cement based materials no less than the time recommended and specified by the manufacturer under good conditions.

B. Verify that substrate is properly dry.

C. Verify supply of adequate utilities, including electric, water, heat (between 60o and 90o F.)

and lighting of no less than 80 ft candles measured at floor surface.

D. Free work area of other trades during, and for a period of 24 hours, after floor installation.

E. Protect finished floor from damage by subsequent trades.

1.06 SUBMITTALS

Provide the following submittal in accordance with the Government’s MATOC contact and requirements. Government approval is required for all submittals.

SECTION 09 70 05 Page 2

SD-01 Product Data

Manufacturer's catalog data shall be submitted for the following items. Data shall include detailed analysis of each coating material required, with constituents measured as percentages of the total weight of coating.

Complete data sheets and safety sheets with detailed installation methods details.

Prep materials Primers and components Setting/under coat and components Aggregate Finish coat and components Metal cove base edge Sealants

SD-02 Samples

A. Manufacturer's Standard Color Charts shall be submitted for sections and actual samples of the selected color applied to a similar substrate of ceramic tile in accordance with Manufacturer's design.

B. Manufacturer’s Warranty.

SD-03 Certificates

A. Safety Plan shall be submitted.

B. Certificate of training from the manufacturer for the installers.

SD-04 Manufacturer's Instructions

Manufacturer's instructions shall be submitted for the coatings including details of mixing, handling, and application.

1.07 CONTRACTOR PERSONNEL QUALIFICATION

A. Personnel assigned to the work shall be certified by the Contractor and the manufacturer to have had manufacturer’s training and approval and to have had adequate previous experience in the successful application of the flooring product coatings similar to those specified.

1.08 WARRANTY

A. Submit a one year warranty against defects in material and workmanship upon substantial completion of installation.

SECTION 09 70 05 Page 3

PART 2 PRODUCTS

2.01 PRODUCT

A. Provide product installed 1/8” to 3/16” (minimum) thick and of a Multiple Component multi coat system with biding primers and agents, which shall be a seamless design and designed with anti-microbial, chemical and thermal shock resistant properties which shall be a complete waterproof epoxy floor system.

2.02 PRODUCT PHYSICAL PROPERTIES (minimum)

Physical Property Test Method Result

Hardness (Shore D) ASTM D-2240 80, shore D Compressive Strength ASTM D-695 17,500 psi ASTM C-579 12,500 psi Tensile Strength ASTM D-638 2,000 psi ASTM C-307 1,300 psi Tensile Elongation ASTM D-638 7.50% Flexural Strength ASTM D-790 3,700 psi ASTM C-580 2,700 psi Flexural Modulus of Elasticity ASTM D-790 4.7 × 105 Linear Shrinkage ASTM D-2566 0.02% Coefficient of Linear Expansion ASTM D-696 3.5× 10-5 Bond Strength to Concrete ASTM D-4541 400 psi substrate fails Indentation ML D-3134 .025 MAX Impact Resistance ML D-2794 >160 Water Absorption ASTM D-570 / C-413 0.04% / 0.1% Heat Resistance Limitation

Intermittent Continuous

160°F 140°F

Flammability ASTM D-635 Self Extinguishing Flame Spread/NFPA 101 ASTM E-84 Class B Abrasion Resistance ASTM C-4060 CS17 Wheel 1000 GM Load 1000 Cycles

21 mg loss

Coefficient of Friction ASTM D-2047 Standard Slip-Resistant 0.7

2.03 PRODUCT MIXING

A. Mix on site with manufacturer supplied mix and measure apparatus to ensure a timely, accurate mix ratio and minimize waste.

SECTION 09 70 05 Page 4

PART 3 EXECUTION

3.01 PREPARATION

A. Create a surface and profile on the existing ceramic tile finish as recommended and required by the product manufacturer. Provide machine or chemical treated surface and dust-free diamond ground edges.

B. Verify that surface is dry and perfectly clean, free of all oil, grease, detergent film, etc.

C. The existing ceramic tile pattern profile may telegraph through the coating this is acceptable.

3.02 INSTALLATION

A. Adhere strictly to manufacturer's current written instructions for a complete system.

B. Apply 20 mil (minimum) flexible prime coat(s) and allow to cure.

C. Apply 1/8”-3/16” multi-component finish flooring system.

1. Broadcast manufacturer’s proprietary aggregate to excess and allow to cure.

2. Sweep up excess aggregate.

3. Apply 20 mil (minimum) thick topcoat of manufacturer’s proprietary product and allow to cure.

4. Apply 15 mil (minimum) thick final topcoat of manufacturer’s proprietary product and allow to cure.

F. Installation shall be performed by the manufacturer’s trained and approved installer, who has technical qualifications, currently approved in writing, and has facilities and equipment to install the specified systems.

3.03 PREPARATION AND DETAIL

A. Thoroughly route and vacuum moving cracks and joints, then fill with manufacturer’s required proprietary fillers.

B. Pre-patch non-moving surface deviations with patching compound comprised of 100% solids epoxy and aggregate.

C. "Key in"/ Rout edge of all drains, edges and transition points according to manufacturer’s instructions.

D. Install integral cove base at all perimeter walls metal edge trim to transition to wall finish.

END OF SECTION