Exhibit_F_ENG_Form_4025.pdf

PDF 1 MB Posted

Attached to
Fort Drum MATOC (Construction) Federal contract opportunity
Solicitation number
W911S2-17-R-0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Bragg

About this file

Exhibit F - ENG Form 4025

View the file

Other files for this federal contract opportunity

Other files attached to Fort Drum MATOC (Construction), newest first.
File Type Posted
W911S2-17-R-0002_Amendment_0003,_Ft_Drum_MATOC.pdf PDF
Amendment_0009,_W911S2-17-R-0002,_Fort_Drum.pdf PDF
Conformed_Copy,_W911S2-17-R-0002-0009.pdf PDF
Amendment_0008,_W911S2-17-R-0008.pdf PDF
Conformed_Solicitation_W911S2-17-R-0002_through_Amendment_0008.pdf PDF
Attachment_1_-_Seed_Project_PW_SOW_EE-20008-5J,_Seed_Task_Order_Drum_REV02.pdf PDF
Amendment_0007_W911S2-17-R-0002.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_ELEC_31_May_2017_(fcs).pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_CIVIL_31_May_2017_(FCS).pdf PDF
W911S2-17-R-0002_Conformed.pdf PDF
Appendix_3v5_-_2016-12-20__3_Int._Munns_Corner_SWPPP_100_percent.pdf PDF
Conformed_W911S2-17-R-0002_thru_Amendment_0005.pdf PDF
Amendment_0005_W911S2-17-R-0002.pdf PDF
Attachment_4_-__W911S2-17-R-0002_MATOC_Site_Visit_Sign_In_Sheet_21_Mar_2017.pdf PDF
Amendment_0004_W911S2-17-R-0002.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_ELEC_18_May_2017.pdf PDF
Exhibit_B_-_Price_Proposal_Worksheet,_v1_(Revised_Amd_0004).xlsx XLSX spreadsheet
Attachment_1_-_Seed_Project_PW_SOW_EE-20008-5J,_Seed_Task_Order_Drum_REV01.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_CIVIL_18_May_2017.pdf PDF
Solicitation_W911S2-17-R-0002_Through_Amendment_0002.pdf PDF
Amendment_0001_W911S2-17-R-0002_Ft_Drum_MATOC.pdf PDF
Solicitation_W911S2-17-R-0002_Through_Amendment_0001.pdf PDF
Exhibit_D08_CDRL_32-36,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v8-PEWS_001-General_Requirements.pdf PDF
Exhibit_D12_CDRL_49-51,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v7-EE-00026-0J_Concept_Plan_Set.pdf PDF
Exhibit_D06_CDRL_24-27,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v4-2016-12-20__3_Int._Munns_Corner_SPECS_REGISTER_100_percent.pdf PDF
Exhibit_H_DD_Form_1354.pdf PDF
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_ELEC.pdf PDF
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_COVER.pdf PDF
Exhibit_D11_CDRL_45-48,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Exhibit_E_Application_and_Certificate_for_Payment.pdf PDF
Exhibit_D03_CDRL_11-15,17-R-0002,Fort_Drum,Construction_MAIDIQ,8Feb17.pdf PDF
Exhibit_C-Fort_Drum's_SOP_for_Electrical_Outages.pdf PDF
Exhibit_D07_CDRL_28-31,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Exhibit_D04_CDRL_16-19,17-R-0002,Fort_Drum,Construction_MAIDIQ,8Feb17.pdf PDF
Attachment_1-Seed_Project_PW_SOW_EE-20008-5J_Seed_Task_Order_Drum.pdf PDF
Appendix_3v8-PEWS_015-As-Built_Record_Drawings.pdf PDF
Exhibit_D09_CDRL_37-40,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_CIVIL.pdf PDF
Exhibit_G_Biological_Opinion.pdf PDF
W911S2-17-R-0002_Drum_CONMATOC_SOL.pdf PDF
Exhibit_D01_CDRL_1-4_17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v3-2016-11-23__3_Int._NARRATIVE_100_percent.pdf PDF
Exhibit_B-Price_Proposal_Worksheet_v1.xlsx XLSX spreadsheet
Appendix_3v6-2016-12-20_3_Int._GEO-TECH_-_SIGNED_-_2.PDF PDF
Exhibit_D05_CDRL_20-23,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v2-2016-12-20__3_Int._Munns_Corner_SPECS_100_percent.pdf PDF
Exhibit_D02_CDRL_5-10,17-R-0002,Fort_Drum,Construction_MAIDIQ,23Feb17.pdf PDF
Show all 50

Fort Drum MATOC (Construction) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHECK ONE

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CEMP-CE (Read instructions on the reverse side prior to initiating this form)

ENG FORM 4025, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

DATE (YYYYMMDD) SIGNATURE OF APPROVING AUTHORITY

THIS IS A NEW TRANSMITTAL

ITEM

NO.

a.

REMARKS

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

SHEET OF

DATE (YYYYMMDD) TRANSMITTAL NUMBER

TO FROM CONTRACT NUMBER

THIS IS A RESUBMITTAL OF

TRANSMITTAL

SPECIFICATION SCTION NUMBER (Cover only one section with each transmittal)

PROJECT TITLE AND LOCATION CHECK ONE: THIS TRANSMITTAL IS FOR

FIO GOVERNMENT APPROVAL

DESCRIPTION OF ITEM SUBMITTED

(Type size, model number/etc.,) b.

MFG. OR CONTR. CAT.

CURVE DRAWING OR

BROCHURE NO.

(See instruction no. 8) c.

NO. OF

COPIES

d.

CONTRACT REFERENCE

DOCUMENT

SPEC. PARA.

NO.

e.

DRAWING

SHEET. NO.

f.

FOR

CONTRACTOR

USE CODE

g.

VARIATION

(See instruction

No. 6) h.

FOR CE USE

CODE

i.

SECTION II - APPROVAL ACTION

I CERTIFY THAT THE ABOVE SUBMITTED ITEMS HAVE BEEN REVIEWED IN DETAIL AND ARE CORRECT AND

IN STRICT CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS EXCEPT AS

OTHERWISE NOTED.

ENCLOSURES RETURNED (List by item number)

CNTRACTOR SIGNATURE

NAME AND TITLE OF APPROVING AUTHORITY

CONTRACTOR NAME

INSTRUCTIONS

1. SECTION I WILL BE INITIATED BY THE CONTRACTOR IN THE REQUIRED NUMBER OF COPIES

2. EACH TRANSMITTAL SHALL BE NUMBERED CONSECUTIVELY IN THE SPACE PROVIDED FOR "TRANSMITTAL NO." THIS NUMBER, IN ADDITION TO THE CONTRACT NUMBER, WILL FORM A SERIAL NUMBER FOR IDENTIFYING EACH SUBMITTAL. FOR NEW SUBMITTALS OR RESUBMITTALS MARK THE APPROPRIATE BOX; ON RESUBMITTALS, INSERT TRANSMITTAL

NUMBER OF LAST SUBMISSION AS WELL AS THE NEW SUBMITTAL NUMBER.

3. THE "ITEM NO." WILL BE THE SAME "ITEM NO." AS INDICATED ON ENG FORM 4288-R FOR EACH ENTRY ON THIS FORM.

4. SUBMITTALS REQUIRING EXPENDITOUS HANDLING WILL BE SUBMITTED ON A SEPARATE FORM.

5. SEPARATE TRANSMITTAL FORM WILL BE USED FOR SUBMITTALS UNDER SEPARATE SECTIONS OF THE SPECIFICATION.\S.

6. A CHECK SHALL BE PLACED IN THE "VARIATION" COLUMN WHEN A SUBMITTAL IS NOT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS - ALSO, A WRITTEN STATEMENT TO

THAT EFFECT SHALL BE INCLUDED IN THE SPACE PROVIDED FOR "REMARKS".

7. FORM IS SELF TRANSMITTAL, LETTER OF TRANSMITTAL IS NOT REQUIRED.

8. WHEN A SAMPLE OF MATERIAL OR MANUFACTURER'S CERTIFICATE OF COMPLIANCE IS TRANSMITTED, INDICATE "SAMPLE" OR "CERTIFICATE" IN COLUMN c, SECTION I.

9. U.S. ARMY CORPS OF ENGINEERS APPROVING AUTHORITY WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SPACE PROVIDED IN SECTION I, COLUMN i TO EACH ITEM SUBMITTED. IN ADDITION THEY WILL ENSURE ENCLOSURES ARE INDICATED AND ATTACHED TO THE FORM PRIOR TO RETURN TO THE CONTRACTOR. THE CONTRACTOR WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SECTION I, COLUMN g, TO EACH ITEM SUBMITTED.

THE FOLLOWING ACTION CODES ARE GIVEN TO ITEMS SUBMITTED

A - APPROVED AS SUBMITTED.

B - APPROVED, EXCEPT AS NOTED ON DRAWINGS.

C - APPROVED, EXCEPT AS NOTED ON DRAWINGS, REFER TO ATTACHED SHEET RESUBMISSION REQUIRED.

D - WILL BE RETURNED BY SEPARATE CORREPONDENCE.

E - DISAPPROVED (See attached)

F - RECEIPT ACKNOWLEDGEED.

FX - RECEIPT ACKNOWLEDGED, DOES NOT COMPLY AS NOTED WITH CONTRACT REQUIREMENTS.

G - OTHER (Specify)

10. APPROVAL OF ITEMS DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH ALL REQUIREMENTS OF THE CONTRACT PLANS AND SPECIFICATIONS.

ENG FORM 4025INST, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

CHECK ONE

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE For use of this form, see ER 415-1-10; the proponent agency is CEMP-CE (Read instructions on the reverse side prior to initiating this form)

ENG FORM 4025, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

ITEM

NO.

a.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

SHEET OF

SPECIFICATION SCTION NUMBER (Cover only one section with each transmittal)

CHECK ONE: THIS TRANSMITTAL IS FOR

DESCRIPTION OF ITEM SUBMITTED

(Type size, model number/etc.,) b.

MFG. OR CONTR. CAT. CURVE DRAWING OR BROCHURE NO.

(See instruction no. 8) c.

NO. OF COPIES

d.

CONTRACT REFERENCE DOCUMENT

SPEC. PARA. NO.

e.

DRAWING SHEET. NO.

f.

FOR CONTRACTOR USE CODE

g.

VARIATION (See instruction No. 6) h.

FOR CE USE CODE

i.

SECTION II - APPROVAL ACTION

I CERTIFY THAT THE ABOVE SUBMITTED ITEMS HAVE BEEN REVIEWED IN DETAIL AND ARE CORRECT AND IN STRICT CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS EXCEPT AS OTHERWISE NOTED.

INSTRUCTIONS

1. SECTION I WILL BE INITIATED BY THE CONTRACTOR IN THE REQUIRED NUMBER OF COPIES

2. EACH TRANSMITTAL SHALL BE NUMBERED CONSECUTIVELY IN THE SPACE PROVIDED FOR "TRANSMITTAL NO." THIS NUMBER, IN ADDITION TO THE CONTRACT NUMBER, WILL FORM A SERIAL NUMBER FOR IDENTIFYING EACH SUBMITTAL. FOR NEW SUBMITTALS OR RESUBMITTALS MARK THE APPROPRIATE BOX; ON RESUBMITTALS, INSERT TRANSMITTAL NUMBER OF LAST SUBMISSION AS WELL AS THE NEW SUBMITTAL NUMBER.

3. THE "ITEM NO." WILL BE THE SAME "ITEM NO." AS INDICATED ON ENG FORM 4288-R FOR EACH ENTRY ON THIS FORM.

4. SUBMITTALS REQUIRING EXPENDITOUS HANDLING WILL BE SUBMITTED ON A SEPARATE FORM.

5. SEPARATE TRANSMITTAL FORM WILL BE USED FOR SUBMITTALS UNDER SEPARATE SECTIONS OF THE SPECIFICATION.\S.

6. A CHECK SHALL BE PLACED IN THE "VARIATION" COLUMN WHEN A SUBMITTAL IS NOT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS - ALSO, A WRITTEN STATEMENT TO THAT EFFECT SHALL BE INCLUDED IN THE SPACE PROVIDED FOR "REMARKS".

7. FORM IS SELF TRANSMITTAL, LETTER OF TRANSMITTAL IS NOT REQUIRED.

8. WHEN A SAMPLE OF MATERIAL OR MANUFACTURER'S CERTIFICATE OF COMPLIANCE IS TRANSMITTED, INDICATE "SAMPLE" OR "CERTIFICATE" IN COLUMN c, SECTION I.

9. U.S. ARMY CORPS OF ENGINEERS APPROVING AUTHORITY WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SPACE PROVIDED IN SECTION I, COLUMN i TO EACH ITEM SUBMITTED. IN ADDITION THEY WILL ENSURE ENCLOSURES ARE INDICATED AND ATTACHED TO THE FORM PRIOR TO RETURN TO THE CONTRACTOR. THE CONTRACTOR WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SECTION I, COLUMN g, TO EACH ITEM SUBMITTED.

THE FOLLOWING ACTION CODES ARE GIVEN TO ITEMS SUBMITTED

A - APPROVED AS SUBMITTED.

B - APPROVED, EXCEPT AS NOTED ON DRAWINGS.

C - APPROVED, EXCEPT AS NOTED ON DRAWINGS, REFER TO ATTACHED SHEET RESUBMISSION REQUIRED.

D - WILL BE RETURNED BY SEPARATE CORREPONDENCE.

E - DISAPPROVED (See attached)

F - RECEIPT ACKNOWLEDGEED.

FX - RECEIPT ACKNOWLEDGED, DOES NOT COMPLY AS NOTED WITH CONTRACT REQUIREMENTS.

G - OTHER (Specify)

10. APPROVAL OF ITEMS DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH ALL REQUIREMENTS OF THE CONTRACT PLANS AND SPECIFICATIONS.

ENG FORM 4025INST, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

1.0 mark.a.cooper@usace.army.mil 20100915 Form Design Team CEIT-IPS-D ENG FORM 4025 Trans of Shop Drawings Equip Data Material Samples or Manu Cert of Comp MAR 1995 Mark Cooper ENG FORM 4025 Trans of Shop Drawings Equip Data Material Samples or Manu Cert of Comp MAR 1995 20100915

PrintForm:
Button1:
DATEAPPROVE:
SIGNAPPROVE:
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
Cell4:
CAPTIONS:
YYYYMMDD:
CONTRACTOR:
NAMEAPPROVE:

File details come from the government source that posted it. Updated .