Exhibit_F_ENG_Form_4025.pdf

ENG Form PDF 1 MB Posted

Attached to
Fort Drum MATOC (Construction)
Solicitation number
W911S2-17-R-0002
Issued by

About this file

Exhibit F - ENG Form 4025

View the file

Other versions and copies of ENG Form 4025

File Revision Posted Attached to
Attachment_B_Eng_Form_4025-R_14AUG23.pdf Aug 14, 2023 Rehab Units 6 Servomotors and Optional Unit 8 Servomotors Big Bend Dam, SD
ATTACHMENT 14 - 24-29 MATOC Eng_Form_4025_2017May - 2 Pages.pdf 2017 Construction Requirements Contract
A21. Attachment Eng_Form_4025_2017May.pdf 2017 W912P923B0008 - W912P9 St. Louis District Lake Shelbyville Park Roads IDIQ
Attachment 4- ENG FORM 4025-R (Mar 2012).pdf Mar 2012 Job Order Contract Fort Drum
ATTACHMENT C_Eng_Form_4025-R.pdf Revision not stated Gavins Point Powerhouse Drain Rehab
ATTACHMENT C_Eng_Form_4025-R.pdf Revision not stated Cherry Creek Dam (CO) Rehab Gate Stems
Attachment 7 - ENG Form 4025-R Shop Drawings.pdf Revision not stated Security System Upgrades
TE-05 Eng Form 4025-R.pdf Revision not stated Solicitation for Protective Coatings
Eng_Form_4025-R.pdf Revision not stated Roof Repair B20187
Eng_Form_4025-R.pdf Revision not stated Roof Repair B2902 Fort Bliss, TX
Eng_Form_4025-R.pdf Revision not stated Roof Repair B11341
Appendix D - ENG Form 4025-R.pdf Revision not stated Lock and Dam 25 Dewater Rental Equipment
Appendix D - ENG Form 4025-R.pdf Revision not stated Lock and Dam 25 Dewater Rental Equipment
A02. Appendix F - Transmittals ENG Form 4025-R.pdf Revision not stated Lock & Dam Bulkhead Crane Generator Upgrade
A02_Eng_Form_4025-R.pdf Revision not stated Combined Synopsis/Solicitation for Supply and Installation of Various LED Light Fixtures and Low-Voltage Electrical Equipment at Jerry F. Costello Lock & Dam
Attachment 2 Eng Form 4025.pdf Revision not stated Four HVAC Units and Install
Exhibit 4 - Eng Form 4025-R.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
SOW Attachment (10) Eng_Form_4025-R.pdf Revision not stated NSWCPD Building 77H Fuel Pump Controller Repairs
Attachment 10 - Eng_Form_4025-R.pdf Revision not stated JBLM Firehouse #3 Kitchen and Bathroom Remodel
Attachment 7-ENG FORM 4025-R.pdf Revision not stated Project: CSC-20049 Water Heater (Solar) Improvements Bldg 11
Show all 20

Who attaches ENG Form 4025

Other files

File Type Posted
W911S2-17-R-0002_Amendment_0003,_Ft_Drum_MATOC.pdf PDF
Conformed_Copy,_W911S2-17-R-0002-0009.pdf PDF
Amendment_0009,_W911S2-17-R-0002,_Fort_Drum.pdf PDF
Conformed_Solicitation_W911S2-17-R-0002_through_Amendment_0008.pdf PDF
Attachment_1_-_Seed_Project_PW_SOW_EE-20008-5J,_Seed_Task_Order_Drum_REV02.pdf PDF
Amendment_0008,_W911S2-17-R-0008.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_CIVIL_31_May_2017_(FCS).pdf PDF
Conformed_W911S2-17-R-0002_thru_Amendment_0007.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_ELEC_31_May_2017_(fcs).pdf PDF
Amendment_0007_W911S2-17-R-0002.pdf PDF
W911S2-17-R-0002_Conformed.pdf PDF
Amendment_0006_W911S2-17-R-0002.pdf PDF
Conformed_W911S2-17-R-0002_thru_Amendment_0005.pdf PDF
Appendix_3v5_-_2016-12-20__3_Int._Munns_Corner_SWPPP_100_percent.pdf PDF
Amendment_0005_W911S2-17-R-0002.pdf PDF
Attachment_1_-_Seed_Project_PW_SOW_EE-20008-5J,_Seed_Task_Order_Drum_REV01.pdf PDF
Attachment_4_-__W911S2-17-R-0002_MATOC_Site_Visit_Sign_In_Sheet_21_Mar_2017.pdf PDF
Amendment_0004_W911S2-17-R-0002.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_CIVIL_18_May_2017.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_ELEC_18_May_2017.pdf PDF
Exhibit_B_-_Price_Proposal_Worksheet,_v1_(Revised_Amd_0004).xlsx XLSX spreadsheet
Conformed_W911S2-17-R-0002_thru_Amendment_0004.pdf PDF
Attachment_3_-_Site_Visit_Roster_W911S2-17-R-0002_06_MAR_17.pdf PDF
Amendment_0002,_17-R-0002,_Ft_Drum_MATOC,_16_Mar_17.pdf PDF
Solicitation_W911S2-17-R-0002_Through_Amendment_0002.pdf PDF
Solicitation_W911S2-17-R-0002_Through_Amendment_0001.pdf PDF
Amendment_0001_W911S2-17-R-0002_Ft_Drum_MATOC.pdf PDF
Exhibit_B-Price_Proposal_Worksheet_v1.xlsx XLSX spreadsheet
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_ELEC.pdf PDF
Appendix_3v3-2016-11-23__3_Int._NARRATIVE_100_percent.pdf PDF
Appendix_3v6-2016-12-20_3_Int._GEO-TECH_-_SIGNED_-_2.PDF PDF
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_CIVIL.pdf PDF
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_COVER.pdf PDF
Exhibit_D11_CDRL_45-48,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Exhibit_E_Application_and_Certificate_for_Payment.pdf PDF
Exhibit_D05_CDRL_20-23,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v2-2016-12-20__3_Int._Munns_Corner_SPECS_100_percent.pdf PDF
Exhibit_C-Fort_Drum's_SOP_for_Electrical_Outages.pdf PDF
Exhibit_D03_CDRL_11-15,17-R-0002,Fort_Drum,Construction_MAIDIQ,8Feb17.pdf PDF
Exhibit_D07_CDRL_28-31,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Attachment_1-Seed_Project_PW_SOW_EE-20008-5J_Seed_Task_Order_Drum.pdf PDF
Exhibit_D04_CDRL_16-19,17-R-0002,Fort_Drum,Construction_MAIDIQ,8Feb17.pdf PDF
Exhibit_G_Biological_Opinion.pdf PDF
W911S2-17-R-0002_Drum_CONMATOC_SOL.pdf PDF
Exhibit_D02_CDRL_5-10,17-R-0002,Fort_Drum,Construction_MAIDIQ,23Feb17.pdf PDF
Exhibit_D01_CDRL_1-4_17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v8-PEWS_015-As-Built_Record_Drawings.pdf PDF
Exhibit_D09_CDRL_37-40,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v8-PEWS_002-Clearing_and_Grubbing.pdf PDF
Exhibit_D10_CDRL_41-44,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHECK ONE

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CEMP-CE (Read instructions on the reverse side prior to initiating this form)

ENG FORM 4025, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

DATE (YYYYMMDD) SIGNATURE OF APPROVING AUTHORITY

THIS IS A NEW TRANSMITTAL

ITEM

NO.

a.

REMARKS

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

SHEET OF

DATE (YYYYMMDD) TRANSMITTAL NUMBER

TO FROM CONTRACT NUMBER

THIS IS A RESUBMITTAL OF

TRANSMITTAL

SPECIFICATION SCTION NUMBER (Cover only one section with each transmittal)

PROJECT TITLE AND LOCATION CHECK ONE: THIS TRANSMITTAL IS FOR

FIO GOVERNMENT APPROVAL

DESCRIPTION OF ITEM SUBMITTED

(Type size, model number/etc.,) b.

MFG. OR CONTR. CAT.

CURVE DRAWING OR

BROCHURE NO.

(See instruction no. 8) c.

NO. OF

COPIES

d.

CONTRACT REFERENCE

DOCUMENT

SPEC. PARA.

NO.

e.

DRAWING

SHEET. NO.

f.

FOR

CONTRACTOR

USE CODE

g.

VARIATION

(See instruction

No. 6) h.

FOR CE USE

CODE

i.

SECTION II - APPROVAL ACTION

I CERTIFY THAT THE ABOVE SUBMITTED ITEMS HAVE BEEN REVIEWED IN DETAIL AND ARE CORRECT AND

IN STRICT CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS EXCEPT AS

OTHERWISE NOTED.

ENCLOSURES RETURNED (List by item number)

CNTRACTOR SIGNATURE

NAME AND TITLE OF APPROVING AUTHORITY

CONTRACTOR NAME

INSTRUCTIONS

1. SECTION I WILL BE INITIATED BY THE CONTRACTOR IN THE REQUIRED NUMBER OF COPIES

2. EACH TRANSMITTAL SHALL BE NUMBERED CONSECUTIVELY IN THE SPACE PROVIDED FOR "TRANSMITTAL NO." THIS NUMBER, IN ADDITION TO THE CONTRACT NUMBER, WILL FORM A SERIAL NUMBER FOR IDENTIFYING EACH SUBMITTAL. FOR NEW SUBMITTALS OR RESUBMITTALS MARK THE APPROPRIATE BOX; ON RESUBMITTALS, INSERT TRANSMITTAL

NUMBER OF LAST SUBMISSION AS WELL AS THE NEW SUBMITTAL NUMBER.

3. THE "ITEM NO." WILL BE THE SAME "ITEM NO." AS INDICATED ON ENG FORM 4288-R FOR EACH ENTRY ON THIS FORM.

4. SUBMITTALS REQUIRING EXPENDITOUS HANDLING WILL BE SUBMITTED ON A SEPARATE FORM.

5. SEPARATE TRANSMITTAL FORM WILL BE USED FOR SUBMITTALS UNDER SEPARATE SECTIONS OF THE SPECIFICATION.\S.

6. A CHECK SHALL BE PLACED IN THE "VARIATION" COLUMN WHEN A SUBMITTAL IS NOT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS - ALSO, A WRITTEN STATEMENT TO

THAT EFFECT SHALL BE INCLUDED IN THE SPACE PROVIDED FOR "REMARKS".

7. FORM IS SELF TRANSMITTAL, LETTER OF TRANSMITTAL IS NOT REQUIRED.

8. WHEN A SAMPLE OF MATERIAL OR MANUFACTURER'S CERTIFICATE OF COMPLIANCE IS TRANSMITTED, INDICATE "SAMPLE" OR "CERTIFICATE" IN COLUMN c, SECTION I.

9. U.S. ARMY CORPS OF ENGINEERS APPROVING AUTHORITY WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SPACE PROVIDED IN SECTION I, COLUMN i TO EACH ITEM SUBMITTED. IN ADDITION THEY WILL ENSURE ENCLOSURES ARE INDICATED AND ATTACHED TO THE FORM PRIOR TO RETURN TO THE CONTRACTOR. THE CONTRACTOR WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SECTION I, COLUMN g, TO EACH ITEM SUBMITTED.

THE FOLLOWING ACTION CODES ARE GIVEN TO ITEMS SUBMITTED

A - APPROVED AS SUBMITTED.

B - APPROVED, EXCEPT AS NOTED ON DRAWINGS.

C - APPROVED, EXCEPT AS NOTED ON DRAWINGS, REFER TO ATTACHED SHEET RESUBMISSION REQUIRED.

D - WILL BE RETURNED BY SEPARATE CORREPONDENCE.

E - DISAPPROVED (See attached)

F - RECEIPT ACKNOWLEDGEED.

FX - RECEIPT ACKNOWLEDGED, DOES NOT COMPLY AS NOTED WITH CONTRACT REQUIREMENTS.

G - OTHER (Specify)

10. APPROVAL OF ITEMS DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH ALL REQUIREMENTS OF THE CONTRACT PLANS AND SPECIFICATIONS.

ENG FORM 4025INST, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

CHECK ONE

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE For use of this form, see ER 415-1-10; the proponent agency is CEMP-CE (Read instructions on the reverse side prior to initiating this form)

ENG FORM 4025, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

ITEM

NO.

a.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

SHEET OF

SPECIFICATION SCTION NUMBER (Cover only one section with each transmittal)

CHECK ONE: THIS TRANSMITTAL IS FOR

DESCRIPTION OF ITEM SUBMITTED

(Type size, model number/etc.,) b.

MFG. OR CONTR. CAT. CURVE DRAWING OR BROCHURE NO.

(See instruction no. 8) c.

NO. OF COPIES

d.

CONTRACT REFERENCE DOCUMENT

SPEC. PARA. NO.

e.

DRAWING SHEET. NO.

f.

FOR CONTRACTOR USE CODE

g.

VARIATION (See instruction No. 6) h.

FOR CE USE CODE

i.

SECTION II - APPROVAL ACTION

I CERTIFY THAT THE ABOVE SUBMITTED ITEMS HAVE BEEN REVIEWED IN DETAIL AND ARE CORRECT AND IN STRICT CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS EXCEPT AS OTHERWISE NOTED.

INSTRUCTIONS

1. SECTION I WILL BE INITIATED BY THE CONTRACTOR IN THE REQUIRED NUMBER OF COPIES

2. EACH TRANSMITTAL SHALL BE NUMBERED CONSECUTIVELY IN THE SPACE PROVIDED FOR "TRANSMITTAL NO." THIS NUMBER, IN ADDITION TO THE CONTRACT NUMBER, WILL FORM A SERIAL NUMBER FOR IDENTIFYING EACH SUBMITTAL. FOR NEW SUBMITTALS OR RESUBMITTALS MARK THE APPROPRIATE BOX; ON RESUBMITTALS, INSERT TRANSMITTAL NUMBER OF LAST SUBMISSION AS WELL AS THE NEW SUBMITTAL NUMBER.

3. THE "ITEM NO." WILL BE THE SAME "ITEM NO." AS INDICATED ON ENG FORM 4288-R FOR EACH ENTRY ON THIS FORM.

4. SUBMITTALS REQUIRING EXPENDITOUS HANDLING WILL BE SUBMITTED ON A SEPARATE FORM.

5. SEPARATE TRANSMITTAL FORM WILL BE USED FOR SUBMITTALS UNDER SEPARATE SECTIONS OF THE SPECIFICATION.\S.

6. A CHECK SHALL BE PLACED IN THE "VARIATION" COLUMN WHEN A SUBMITTAL IS NOT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS - ALSO, A WRITTEN STATEMENT TO THAT EFFECT SHALL BE INCLUDED IN THE SPACE PROVIDED FOR "REMARKS".

7. FORM IS SELF TRANSMITTAL, LETTER OF TRANSMITTAL IS NOT REQUIRED.

8. WHEN A SAMPLE OF MATERIAL OR MANUFACTURER'S CERTIFICATE OF COMPLIANCE IS TRANSMITTED, INDICATE "SAMPLE" OR "CERTIFICATE" IN COLUMN c, SECTION I.

9. U.S. ARMY CORPS OF ENGINEERS APPROVING AUTHORITY WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SPACE PROVIDED IN SECTION I, COLUMN i TO EACH ITEM SUBMITTED. IN ADDITION THEY WILL ENSURE ENCLOSURES ARE INDICATED AND ATTACHED TO THE FORM PRIOR TO RETURN TO THE CONTRACTOR. THE CONTRACTOR WILL ASSIGN ACTION CODES AS INDICATED BELOW IN SECTION I, COLUMN g, TO EACH ITEM SUBMITTED.

THE FOLLOWING ACTION CODES ARE GIVEN TO ITEMS SUBMITTED

A - APPROVED AS SUBMITTED.

B - APPROVED, EXCEPT AS NOTED ON DRAWINGS.

C - APPROVED, EXCEPT AS NOTED ON DRAWINGS, REFER TO ATTACHED SHEET RESUBMISSION REQUIRED.

D - WILL BE RETURNED BY SEPARATE CORREPONDENCE.

E - DISAPPROVED (See attached)

F - RECEIPT ACKNOWLEDGEED.

FX - RECEIPT ACKNOWLEDGED, DOES NOT COMPLY AS NOTED WITH CONTRACT REQUIREMENTS.

G - OTHER (Specify)

10. APPROVAL OF ITEMS DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH ALL REQUIREMENTS OF THE CONTRACT PLANS AND SPECIFICATIONS.

ENG FORM 4025INST, MAR 1995 PREVIOUS EDITIONS ARE OBSOLETE.

1.0 mark.a.cooper@usace.army.mil 20100915 Form Design Team CEIT-IPS-D ENG FORM 4025 Trans of Shop Drawings Equip Data Material Samples or Manu Cert of Comp MAR 1995 Mark Cooper ENG FORM 4025 Trans of Shop Drawings Equip Data Material Samples or Manu Cert of Comp MAR 1995 20100915

PrintForm:
Button1:
DATEAPPROVE:
SIGNAPPROVE:
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
Cell4:
CAPTIONS:
YYYYMMDD:
CONTRACTOR:
NAMEAPPROVE:

File details come from the government source that posted it. Updated .