Attachment_1_-_Seed_Project_PW_SOW_EE-20008-5J,_Seed_Task_Order_Drum_REV02.pdf
PDF 561 KB Posted
- Attached to
- Fort Drum MATOC (Construction) Federal contract opportunity
- Solicitation number
- W911S2-17-R-0002
About this file
Attachment 1 - Seed Project PW SOW EE-20008-5J, Seed Task Order Drum REV02
View the file
Other files for this federal contract opportunity
Show all 50
Fort Drum MATOC (Construction) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public Works Engineering Repair, Rehabilitation & Construction (RRC) 18 April 17
Work Order No: EE-20008-5J] Project Title: Repair Reconstruct Hangar Access/Munns Corner
Intersection
General: This Statement of Work (SOW) contains requirements applicable to this task order. This SOW presents an overview of Government requirements. The SOW describes definable features of work that the Government deems necessary to complete the project. The Contractor shall not consider the definable features of work to be inclusive of all requirements or tasks necessary that would result in a complete and useable project for acceptance by the Government. It shall be the Contractor’s responsibility to prepare a fully developed proposal to provide a complete and usable project acceptable to the Government.
1.1 Project Purpose and Description: The purpose of this project to complete the reconstruction and realignment of the intersection of Hangar Access (FOB Shank) Road and Munns Corners.
The existing intersection fails to maintain safe and efficient flow of traffic. Increased traffic loads require reconstruction and realignment of the intersection to improve traffic flow, and pedestrian and vehicle safety.
1.2 Government Specific Task Order Milestones
Task Order Milestones Days Comments Pre-Construction Meeting (Contractor to bring an initial price-loaded progress schedule)
10 Business Days after Task Order Award
Contractor Final Progress Schedule 5 Business Days after Notice to Proceed
Acquire Dig Permit
Business Days after Notice To Proceed.
10-days to submit the request, and 10-days for Government to mark utilities and approve the dig permit
Request for Final Inspection 10 Business Days Prior to Contractor’s Requested Date for Final Inspection
Post Construction Submittal Package 5 Business Days Prior to the Contractor’s Requested Date for Final Inspection
As-built Record Drawings 5 Business Days Prior to Final Inspection
Final Government Inspection 5 Business Days (minimum) from Task Order Completion Date
Acceptance and Final Punch List Inspection N/A Must be Completed Prior to the task order completion date.
Task Order Completion 225 Calendar Days
1.3 Government Design Plans
1.3.1 Government furnished engineering design plans, specifications, and related documents were prepared under separate contract to be 100% engineered construction plans.
Government design documents present anticipated existing conditions, proposed conditions, conditions that might affect construction of the project, typical details, and/or other related information for Contractors to prepare a price proposal(s) for Government review for technical acceptability. Not all definable features of work are defined herein that may be shown in the Government design plans. Similarly, project requirements stated herein, may not be graphically presented in the Government design documents. Therefore, it is the contractor’s responsibility to ensure that all project requirements, presented in the Government furnished design documents and the written text of this statement of work are coordinated in preparing its proposal. Government design documents are intended to be used concurrently with the written RTOP statement of work; not independently.
18 April 17
Work Order No: EE-20008-5J] Project Title: Repair Reconstruct Hangar Access/Munns Corner
1.3.2 Contractors shall consider the Government concept plans as 100% engineered construction plans suitable for construction of the project.
1.3.3 Contractors are further referred to FAR Clause 52.236-3 – Site Investigation and Conditions Affecting the Work and FAR Clause 52.236-21 – Specifications and Drawings for Construction referenced in the Contractor’s contract.
1.4 Existing Site Conditions
1.4.1 Site Location is as shown on the drawings.
1.4.2 Site Description: Munns Corners Road is a two-lane bi-directional asphalt paved roadway.
Hanger Access Drive (FOB Shank Road) is also a two-lane bi-directional asphalt paved roadway that forms a “T” intersection with Munns Corners Road. The intersection is controlled with a traffic signal. The south bound approach to the intersection provides for a protected left turn and a right turn. East bound approach to the intersection provides a protected left turn and straight through. Underground utilities, water, sewer, gas, electrical, and communications, are located on the both sides of Munns Corners and Hangar Assess Drive (FOB Sank Road).
1.5 Existing Utilities
1.5.1 The Government design plans show the location of existing utilities. Unless specifically stated otherwise, the exact location and precise depth/elevation of underground utilities are unknown. The Contractor, as limited herein, can rely upon the general location of existing utilities shown on the Government design plans. The specified depth/elevation of a utility shall be approximate and subject to changes in depth/elevation of ±1 foot. When not specified the depth/elevation from existing grade shall be subject to changes in depth/elevation in the table below. The horizontal locations of all utilities, unless specified otherwise, are accurate to ±5 feet on each side of the edge of the utility (i.e., outside edge of a duct bank or pipe). The general limits of vertical location are defined in Table 1.
Table 1 General Limits for Utilities Utility Depth from Existing
Grade Variance
Water 5-6 feet ±1.5 feet Sewer - Gravity Calculated from the invert elevations, slope, and length of the pipe
±6 inches
Sewer – Force Mains 5-6 feet ±2 feet Natural Gas 24 inches ±12 inches Underground Primary Electric 30 inches ±12 inches Underground Secondary Electric 24 inches ±12 inches Communications Duct Banks (at the apex)
24 inches ±12 inches
Communications (direct buried) 24 inches ±12 inches
18 April 17
Work Order No: EE-20008-5J] Project Title: Repair Reconstruct Hangar Access/Munns Corner
Stormwater Calculated from the invert elevations, slope and length of pipe
±6 inches
1.6 Project Lay Down, Contractor Parking, Equipment/Materials Staging/Parking Areas.
1.6.1 Lay Down Area: The contractor laydown area will be located as shown on the government concept plans.
1.6.2 Contractor Parking Area: The contractor parking area is co-located with the project lay down area.
18 April 17
Work Order No: EE-20008-5J] Project Title: Repair Reconstruct Hangar Access/Munns Corner
2 DEFINABLE FEATURES OF WORK (DFOW): This section presents definable features of work (DFOW) to successfully complete the project. These definable features of work are not inclusive of all requirements necessary that would result in a complete and useable project for acceptance by the Government. It shall be the Contractor’s responsibility to provide a fully developed price proposal to meet the requirements for a complete and usable project acceptable to the Government. When specified below, PW Engineering Work Statements (PEWSs) supplement the definable features of work and Government furnished design documents. PWES are in the appendices to this statement of work.
2.1 General Requirements
General requirements shall be provided in accordance with PEWS 001 – General Requirements.
The Contractor is required to provide a draft DD Form 1354, Transfer and Acceptance of DoD Real Property for this task order.
Preconstruction, construction, and post construction submittals shall be provided in accordance with the submittal register contained in the project specifications book.
2.2 Stormwater Management: Provide storm water management in accordance with the Government furnished design documents. The contractor is responsible for all inspection, testing, and maintenance/repair of stormwater management practices through the duration of the construction and until final acceptance of the project by the government.
2.2.1 Notice of Termination (NOT): The contractor shall prepare the Notice of Termination (NOT). The NOT will be submitted to PW Engineering’s Project Manager within 2‐business days of the final SWPPP inspection documenting site stabilization has been achieved. The NOT will be submitted to the State by Fort Drum’s Stormwater Management Program.
2.2.2 Stormwater Plan Amendments: The contractor shall be responsible to amend stormwater management documents when:
2.2.2.1 Contractor’s operations at the construction site are not in compliance with NYSDEC requirements and when these non-compliant operations cannot be modified, altered, or corrected to maintain compliance with stormwater management regulations and project requirements.
2.2.2.2 Contractor requested and the Government approved the contractor’s requested change(s) in design plans that material alter stormwater management practices as defined in the Government provided design documents.
2.3 Maintenance & Protection of Traffic: The contractor is responsible for implementing maintenance and protection of traffic (MTP) for the construction project to include ingress and egress of construction and employee vehicles from/to the project work areas. MPT plans, if presented, in the Government design documents shall be the minimum accepted level of MTP.
When a government furnished MTP is not included in the design documents, the contractor shall implement MTP that is at a level generally consider acceptable under construction industry standards and shall be in accordance the Manual for Uniform Traffic Control Devices (MUTCDs) and the NYSDOT supplement.
18 April 17
Work Order No: EE-20008-5J] Project Title: Repair Reconstruct Hangar Access/Munns Corner
Closure of Munns Corners Road will not be permitted. Munns Corners Road is the only primary access road to Wheeler Sac Army Airfield (WSAAF). Closure of Hangar Access Road will be allowed provided work on Munns Corners Road is completed to allow detouring of traffic.
2.8 Clearing and Grubbing: Clearing and Grubbing shall be provided in accordance with PWES 002
– Clearing and Grubbing.
2.9 Demolition: Complete demolition of existing traffic signal, electrical, roadway, and other existing site features as shown on the design plans. The instrument survey that was completed for the design did not locate all traffic signal features (i.e., they were not visible at the surface).
The government has included the in this statement of work the government concept plans associated with the Munns Corners/Hangar Access Road Intersection Improvement project (EE- 00026-0J) that shows the general location and layout of the traffic signal as well as recently completed roadway pavement improvement cross sections.
2.10 Roadway Reconstruction: The contractor shall complete construction of the roadway realignment in accordance with the government provided construction documents.
2.11 Parking Lot Construction The Contractor shall complete construction of parking lot and associated site work in accordance with Government provided construction documents. All work associated with parking lot is considered new work. (L-work).
2.12 Site Restoration: Complete site restoration in accordance with the government provided construction documents.
2.12.1 The contractor shall confine all work within the proposed limits of construction as shown on the
Government design plans. Any work beyond the limits of construction, by the contractor or subcontractor at any tier, will be restored to conditions equal to or better than existing prior to being affected at no additional expense to the government and shall not be a grounds for a claim to extend the project completion date.
2.13 As-built Records: As-built record drawings shall be based an instrument survey conducted by a licensed Land Surveyor. Prepare as-built record drawings in accordance with PEWS 015 – As-built Record Drawings and the project specifications.
18 April 17
Work Order No: EE-20008-5J] Project Title: Repair Reconstruct Hangar Access/Munns Corner
3 APPENDICES
3.1 100% Construction Plans, (pdf. and AutoCAD)
3.2 Construction Specifications
3.3 Design Narrative
3.4 Submittal Register
3.5 Stormwater Pollution Prevention Plan (SWPPP)
3.6 Geotechnical Engineering Memorandum
3.7 EE-00026-0J Concept Plan Sent – Munns Corners/Hangar Access Drive Intersection
Improvements.
3.8 PW Engineering Work Statements
PEWS 001 General Requirements
PEWS 002 Clearing & Grubbing
PEWS 015 As-built Record Drawings
Repair, Rehabilitation & Construction (RRC) 18 April 17
Work Order No: EE-20008-5J] Project Title: Repair Reconstruct Hangar Access/Munns Corner
WINEST PROPOSAL CATEGORIES
Contractor shall prepare their proposal with sufficient detail to permit the government to make a knowledgeable review for technical acceptability.
Contractors shall prepare the proposals as outlined below.
Roadway Construction -
1. General Requirements
2. Stormwater Management
3. Clearing and Grubbing
4. Maintenance and Protection of Traffic
5. Roadway Construction
6. Roadway Lighting
7. Site Restoration
8. As-built Record Drawings
Parking Lot Construction –
1. General Requirements
2. Stormwater Management
3. Clearing and Grubbing
4. Maintenance and Protection of Traffic
5. Parking Lot Construction
6. Roadway Lighting
7. Site Restoration
8. As-built Record Drawings
File details come from the government source that posted it. Updated .