TE-05 Eng Form 4025-R.pdf

PDF 60 KB Posted

Attached to
Solicitation for Protective Coatings Federal contract opportunity
Solicitation number
W911S825BA015
Issued by
Department of the Army

About this file

The document is an ENG Form 4025-R, which is a transmittal form for submitting shop drawings, equipment data, material samples, or manufacturer's certificates of compliance. The form provides detailed instructions for contractors to submit documentation for review and approval by the U.S. Army Corps of Engineers. Key instructions include:

The form requires contractors to number transmittals consecutively, include specification section numbers, and submit items from a single specification section. Contractors must indicate submittal types (ranging from preconstruction to closeout data) and can note variations from contract requirements. The Corps of Engineers will assign action codes to each submittal, such as "Approved as submitted" (A), "Approved with exceptions" (B), or "Disapproved" (E). The form emphasizes that approval does not relieve the contractor from meeting all contract requirements, and is specifically designed for design-build and construction contract documentation processes.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation for Protective Coatings, newest first.
File Type Posted
TE-01 Price List (Revision 2 Revised 2025-07-11).xlsx XLSX spreadsheet
Solicitation Amendment 03 W911S825BA0150003 SF 30.pdf PDF
Solicitation Questions and Answers (Revised Amendment 3).pdf PDF
TE-17 - UFGS 02 83 00 - Lead Remediation - 2018.pdf PDF
TE-24 - UFGS 09 97 13.00 40 - Steel Coatings - 2014 (1).pdf PDF
TE-15 - UFC 3 190 06 - Protective Coatings and Paints - 2021.pdf PDF
TE-18 - UFGS 04 03 00 - Conservation for Period Masonry - 2017.pdf PDF
TE-19 - UFGS 07 92 00 - Joint Sealants - 2023.pdf PDF
TE-23 - UFGS 09 90 00 - Paintings and Coatings - 2021.pdf PDF
TE-16 - UFGS 02 82 00 - Asbestos Remediation - 2019.pdf PDF
TE-21 - UFGS 09 65 00 - Resilient Flooring - 2010.pdf PDF
Solicitation Amendment 02 W911S825BA0150002 SF 30.pdf PDF
TE-20 - UFGS 09 01 90.50 - PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING - 2009.PDF PDF
TE-22 - UFGS 09 67 23.13 - Standard Resinous Flooring - 2019.pdf PDF
Solicitation Amendment W911S825BA0150001 SF 30.pdf PDF
Solicitation Questions and Answers.pdf PDF
Attachment B Task Order Proposal Tech Review.xlsx XLSX spreadsheet
Attachment A Task Order SOW Example.docx DOCX document
TE-1 Base Year Price List (Revised).xlsx XLSX spreadsheet
TE-04 Project Schedule Example.xlsx XLSX spreadsheet
TE-11 General Decision Number - WA20250111 (Pierce) 06 June 2025.docx DOCX document
Solicitation - W911S825BA015.pdf PDF
TE-03 Contract Progress Report.pdf PDF
TE-10 General Decision Number WA20250108 (King) 06 JUNE 2025.docx DOCX document
TE-2 Statement of Work (2025-06-06).pdf PDF
TE-06 Daily Contract Inspection Report.pdf PDF
TE-08 Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
TE-12 General Decision Number - WA20250116 (Thurston) 06 June 2025.docx DOCX document
TE-13 General Decision Number - WA20250029 (Jefferson) 06 June 2025.docx DOCX document
TE-07 Sustainable Acquisition Exception Form.pdf PDF
TE-14 General Decision Number WA20250119 (Yakima) 06 June 2025.docx DOCX document
TE-09 HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

DATE TRANSMITTAL NO.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO:

PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)

FROM: CONTRACT NO. CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See

Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation

(See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a. i.c. d. e. f. g. h.b.

CONTRACT DOCUMENT

REFERENCE

REMARKS

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR

NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATEENCLOSURES RETURNED (List by item No.)

REPLACES EDITION OF MAR 95, WHICH IS OBSOLETE.ENG FORM 4025-R, MAR 2012

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal

Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted.

B -- Approved, except as noted on drawings. Resubmission not required.

C -- Approved, except as noted on drawings. Refer to attached comments.

Resubmission required.

D -- Will be returned by separate correspondence.

E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify)

K -- Government concurs with intermediate design. (For D-B contracts)

R -- Design submittal is acceptable for release for construction. (For D-B contracts)

ENG FORM 4025-R, MAR 2012

Page of

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

ITEM

NO.

(See Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation (See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a.

i.

c.

d.

e.

f.

g.

h.

b.

CONTRACT DOCUMENT

REFERENCE

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

REPLACES EDITION OF MAR 95, WHICH IS OBSOLETE.

ENG FORM 4025-R, MAR 2012

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted. B -- Approved, except as noted on drawings. Resubmission not required. C -- Approved, except as noted on drawings. Refer to attached comments. Resubmission required. D -- Will be returned by separate correspondence. E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify) K -- Government concurs with intermediate design. (For D-B contracts) R -- Design submittal is acceptable for release for construction. (For D-B contracts)

ENG FORM 4025-R, MAR 2012

1.0 darwin.chen@usace.army.mil 2012-03-27 Forms Design Team Darwin Chen

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

2012-03-29

CurrentPage:
PageCount:
No1_DateTime:
No2_Transmittal:
No3_To:
No8_Pro_Title:
No7_Specification:
No4_From:
No5_Cont_No:
No6a_CheckBox: 0
No6b_CheckBox: 0
No6_Transmittal:
No9a_CheckBox: 0
No9b_CheckBox: 0
No9c_CheckBox: 0
No9d_CheckBox: 0
No9e_CheckBox: 0
No9f_CheckBox: 0
ITEM NO. (See Note 3):
DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.):

SUBMITTAL TYPE CODE (See Note 8):
NO. OF COPIES:
SPEC. PARA. NO.:
DRAWING SHEET NO. :
CONTRACTOR REVIEW CODE
VARIATION Enter "Y" if requesting a variation (See Note 6):
USACE ACTION CODE (Note 9) :
Remarks:
Contractor_Name:
Contractor_Signature:
Authority_Name:
Authority_Signature:
Authority_DateTime:
Enclosures:

File details come from the government source that posted it. Updated .