Attachment 7 - ENG Form 4025-R Shop Drawings.pdf
PDF 364 KB Posted
- Attached to
- Security System Upgrades
- Solicitation number
- W911S825BA016
About this file
The document is the U.S. Army Corps of Engineers (USACE) ENG FORM 4025, a Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer's Certificates of Compliance, dated May 2017. This form is used by contractors to submit and request approval for various types of submittals during a construction project, including preconstruction documents, shop drawings, product data, samples, design data, certificates, manufacturer's instructions, field reports, and operation & maintenance data.
The form provides detailed instructions for completing the transmittal, including how to number submittals, what information to include, and the various submittal action codes used by the USACE to approve or request modifications to submitted materials. The form is divided into two sections: Section I is initiated by the contractor to request approval of specific items, while Section II is used by the approving authority to provide their review and action status. The form includes spaces for specifying the contract number, project details, item descriptions, and references to contract documents, with a comprehensive set of codes to track the status of each submittal.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2
U.S. Army Corps of Engineers (USACE)
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.
DATE TRANSMITTAL NO.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
TO:
PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)
FROM: CONTRACT NO. CHECK ONE:
THIS TRANSMITTAL IS FOR: (Check one)
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
FIO GA DA CR DA/CR DA/GA
ITEM
NO.
(See
Note 3)
USACE
ACTION
CODE
(Note 9)
SUBMITTAL
TYPE CODE
(See Note 8)
NO.
OF
COPIES
SPEC.
PARA. NO.
DRAWING
SHEET NO.
CONTRACTOR
REVIEW
CODE
VARIATION
Enter "Y" if requesting a variation
(See Note 6)
DESCRIPTION OF SUBMITTAL ITEM
(Type size, model number/etc.)
a. i.c. d. e. f. g. h.b.
CONTRACT DOCUMENT
REFERENCE
REMARKS
SECTION II - APPROVAL ACTION
I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.
NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR
NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATEENCLOSURES RETURNED (List by item No.)
ENG FORM 4025, MAY 2017 Page 2 of 2
INSTRUCTIONS
1. Section I will be initiated by the Contractor in the required number of copies.
2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.
3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.
4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.
5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.
6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.
7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.
8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.
Submittal types are the following:
SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports
SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout
9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal
Action Codes in column i of Section I. The Submittal Action Codes are:
A -- Approved as submitted.
B -- Approved, except as noted on drawings. Resubmission not required.
C -- Approved, except as noted on drawings. Refer to attached comments.
Resubmission required.
D -- Will be returned by separate correspondence.
E -- Disapproved. Refer to attached comments.
10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.
F -- Receipt acknowledged.
X -- Receipt acknowledged, does not comply with contract requirements, as noted.
G -- Other action required (Specify)
K -- Government concurs with intermediate design. (For D-B contracts)
R -- Design submittal is acceptable for release for construction. (For D-B contracts)
| TRANSMITTAL NO: |
| TO: |
| FROM: |
| CONTRACT NO: |
| TRANSMITTAL: |
| SPECIFICATION SEC NO Cover only one section with each transmittal: |
| PROJECT TITLE AND LOCATION: |
| ITEM NO See Note 3 aRow1: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow1: |
| SUBMITTAL TYPE CODE See Note 8 cRow1: |
| NO OF COPIES dRow1: |
| SPEC PARA NO eRow1: |
| DRAWING SHEET NO fRow1: |
| CONTRACTOR REVIEW CODE gRow1: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow1: |
| USACE ACTION CODE Note 9 iRow1: |
| ITEM NO See Note 3 aRow2: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow2: |
| SUBMITTAL TYPE CODE See Note 8 cRow2: |
| NO OF COPIES dRow2: |
| SPEC PARA NO eRow2: |
| DRAWING SHEET NO fRow2: |
| CONTRACTOR REVIEW CODE gRow2: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow2: |
| USACE ACTION CODE Note 9 iRow2: |
| ITEM NO See Note 3 aRow3: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow3: |
| SUBMITTAL TYPE CODE See Note 8 cRow3: |
| NO OF COPIES dRow3: |
| SPEC PARA NO eRow3: |
| DRAWING SHEET NO fRow3: |
| CONTRACTOR REVIEW CODE gRow3: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow3: |
| USACE ACTION CODE Note 9 iRow3: |
| ITEM NO See Note 3 aRow4: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow4: |
| SUBMITTAL TYPE CODE See Note 8 cRow4: |
| NO OF COPIES dRow4: |
| SPEC PARA NO eRow4: |
| DRAWING SHEET NO fRow4: |
| CONTRACTOR REVIEW CODE gRow4: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow4: |
| USACE ACTION CODE Note 9 iRow4: |
| ITEM NO See Note 3 aRow5: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow5: |
| SUBMITTAL TYPE CODE See Note 8 cRow5: |
| NO OF COPIES dRow5: |
| SPEC PARA NO eRow5: |
| DRAWING SHEET NO fRow5: |
| CONTRACTOR REVIEW CODE gRow5: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow5: |
| USACE ACTION CODE Note 9 iRow5: |
| ITEM NO See Note 3 aRow6: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow6: |
| SUBMITTAL TYPE CODE See Note 8 cRow6: |
| NO OF COPIES dRow6: |
| SPEC PARA NO eRow6: |
| DRAWING SHEET NO fRow6: |
| CONTRACTOR REVIEW CODE gRow6: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow6: |
| USACE ACTION CODE Note 9 iRow6: |
| ITEM NO See Note 3 aRow7: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow7: |
| SUBMITTAL TYPE CODE See Note 8 cRow7: |
| NO OF COPIES dRow7: |
| SPEC PARA NO eRow7: |
| DRAWING SHEET NO fRow7: |
| CONTRACTOR REVIEW CODE gRow7: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow7: |
| USACE ACTION CODE Note 9 iRow7: |
| ITEM NO See Note 3 aRow8: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow8: |
| SUBMITTAL TYPE CODE See Note 8 cRow8: |
| NO OF COPIES dRow8: |
| SPEC PARA NO eRow8: |
| DRAWING SHEET NO fRow8: |
| CONTRACTOR REVIEW CODE gRow8: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow8: |
| USACE ACTION CODE Note 9 iRow8: |
| ITEM NO See Note 3 aRow9: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow9: |
| SUBMITTAL TYPE CODE See Note 8 cRow9: |
| NO OF COPIES dRow9: |
| SPEC PARA NO eRow9: |
| DRAWING SHEET NO fRow9: |
| CONTRACTOR REVIEW CODE gRow9: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow9: |
| USACE ACTION CODE Note 9 iRow9: |
| ITEM NO See Note 3 aRow10: |
| DESCRIPTION OF SUBMITTAL ITEM Type size model numberetc bRow10: |
| SUBMITTAL TYPE CODE See Note 8 cRow10: |
| NO OF COPIES dRow10: |
| SPEC PARA NO eRow10: |
| DRAWING SHEET NO fRow10: |
| CONTRACTOR REVIEW CODE gRow10: |
| VARIATION Enter Y if requesting a variation See Note 6 hRow10: |
| USACE ACTION CODE Note 9 iRow10: |
| ENCLOSURES RETURNED List by item No: |
| NAME AND TITLE OF APPROVING AUTHORITY: |
| REMARKS: |
| Contractor Name: |
| FIO: Off |
| THIS IS A NEW TRANSMITTAL: Off |
| THIS IS A RESUBMITTAL: Off |
| GA: Off |
| DA: Off |
| CR: Off |
| DA/CR: Off |
| DA/GA: Off |
| Date 1: |
| Date 2: |
File details come from the government source that posted it. Updated .