This document is a template transmittal form used by contractors to submit shop drawings, equipment data, material samples, or manufacturer's certificates of compliance to the U.S. Army Corps of Engineers for approval on federal construction contracts. The two-page form includes sections for the contractor to enter details of submittal items, specify the submittal type according to the Corps' standards, and request approval. The Corps will then note its action taken on each item in the approval section. Instructions are provided to guide contractors on properly completing and submitting the form.

The related federal contract opportunity is solicitation number W912P923B0008 for indefinite delivery/indefinite quantity construction services for lake and park roads through the U.S. Army Corps of Engineers St. Louis District. Contractors will provide road construction and repair on an as-needed basis over the span of the multiple-award IDIQ contract. Pricing will be established through task orders issued against the IDIQ agreements.

View the file

Other versions and copies of ENG Form 4025

File Revision Posted Attached to
Attachment_B_Eng_Form_4025-R_14AUG23.pdf Aug 14, 2023 Rehab Units 6 Servomotors and Optional Unit 8 Servomotors Big Bend Dam, SD
ATTACHMENT 14 - 24-29 MATOC Eng_Form_4025_2017May - 2 Pages.pdf 2017 Construction Requirements Contract
Attachment 4- ENG FORM 4025-R (Mar 2012).pdf Mar 2012 Job Order Contract Fort Drum
Attachment 4- ENG FORM 4025-R (Mar 2012).pdf Mar 2012 Job Order Contract Fort Drum
ATTACHMENT C_Eng_Form_4025-R.pdf Revision not stated Gavins Point Powerhouse Drain Rehab
ATTACHMENT C_Eng_Form_4025-R.pdf Revision not stated Cherry Creek Dam (CO) Rehab Gate Stems
Attachment 7 - ENG Form 4025-R Shop Drawings.pdf Revision not stated Security System Upgrades
TE-05 Eng Form 4025-R.pdf Revision not stated Solicitation for Protective Coatings
Eng_Form_4025-R.pdf Revision not stated Roof Repair B20187
Eng_Form_4025-R.pdf Revision not stated Roof Repair B2902 Fort Bliss, TX
Eng_Form_4025-R.pdf Revision not stated Roof Repair B11341
Appendix D - ENG Form 4025-R.pdf Revision not stated Lock and Dam 25 Dewater Rental Equipment
Appendix D - ENG Form 4025-R.pdf Revision not stated Lock and Dam 25 Dewater Rental Equipment
A02. Appendix F - Transmittals ENG Form 4025-R.pdf Revision not stated Lock & Dam Bulkhead Crane Generator Upgrade
A02_Eng_Form_4025-R.pdf Revision not stated Combined Synopsis/Solicitation for Supply and Installation of Various LED Light Fixtures and Low-Voltage Electrical Equipment at Jerry F. Costello Lock & Dam
Attachment 2 Eng Form 4025.pdf Revision not stated Four HVAC Units and Install
Exhibit 4 - Eng Form 4025-R.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
SOW Attachment (10) Eng_Form_4025-R.pdf Revision not stated NSWCPD Building 77H Fuel Pump Controller Repairs
Attachment 10 - Eng_Form_4025-R.pdf Revision not stated JBLM Firehouse #3 Kitchen and Bathroom Remodel
Attachment 7-ENG FORM 4025-R.pdf Revision not stated Project: CSC-20049 Water Heater (Solar) Improvements Bldg 11
Show all 20

Who attaches ENG Form 4025

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

U.S. Army Corps of Engineers (USACE)

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

DATE TRANSMITTAL NO.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO:

PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)

FROM: CONTRACT NO. CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See

Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation

(See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a. i.c. d. e. f. g. h.b.

CONTRACT DOCUMENT

REFERENCE

REMARKS

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR

NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATEENCLOSURES RETURNED (List by item No.)

ENG FORM 4025, MAY 2017 Page 2 of 2

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal

Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted.

B -- Approved, except as noted on drawings. Resubmission not required.

C -- Approved, except as noted on drawings. Refer to attached comments.

Resubmission required.

D -- Will be returned by separate correspondence.

E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify)

K -- Government concurs with intermediate design. (For D-B contracts)

R -- Design submittal is acceptable for release for construction. (For D-B contracts)

ENG FORM 4025, MAY 2017

PREVIOUS EDITIONS ARE OBSOLETE.

Page of

ENG FORM 4025, MAY 2017

Page of U.S. Army Corps of Engineers (USACE)

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

ITEM

NO.

(See Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation (See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a.

i.

c.

d.

e.

f.

g.

h.

b.

CONTRACT DOCUMENT

REFERENCE

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted. B -- Approved, except as noted on drawings. Resubmission not required. C -- Approved, except as noted on drawings. Refer to attached comments. Resubmission required. D -- Will be returned by separate correspondence. E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify) K -- Government concurs with intermediate design. (For D-B contracts) R -- Design submittal is acceptable for release for construction. (For D-B contracts) 1.0 darwin.chen@usace.army.mil 2017-05-24 Forms Design Team Darwin Chen

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

2017-05-24

PrintButton1:
saveas:
EmailSubmitButton1:
CurrentPage:
PageCount:
No1_DateTime:
No2_Transmittal:
No3_To:
No8_Pro_Title:
No7_Specification:
No4_From:
No5_Cont_No:
No6a_CheckBox: 0
No6b_CheckBox: 0
No6_Transmittal:
No9a_CheckBox: 0
No9b_CheckBox: 0
No9c_CheckBox: 0
No9d_CheckBox: 0
No9e_CheckBox: 0
No9f_CheckBox: 0
ITEM NO. (See Note 3):
DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.):

SUBMITTAL TYPE CODE (See Note 8):
NO. OF COPIES:
SPEC. PARA. NO.:
DRAWING SHEET NO. :
CONTRACTOR REVIEW CODE
VARIATION Enter "Y" if requesting a variation (See Note 6):
USACE ACTION CODE (Note 9) :
Remarks:
Contractor_Name:
Contractor_Signature:
Authority_Name:
Authority_Signature:
Authority_DateTime:
Enclosures:

File details come from the government source that posted it. Updated .