S009 Final Acceptance Report.docx
DOCX document 38 KB Posted
- Solicitation number
- W56HZV-18-R-0048
About this file
This document contains a Contract Data Requirements List and related federal contract opportunity notice. The Contract Data Requirements List requires the contractor to deliver a Final Acceptance Report on a monthly basis, beginning 15 days after acceptance of the first vehicle. The report must include inbound and outbound Preventative Maintenance Checks and Services reports verifying all deficiencies were corrected for each repaired vehicle accepted by the government that month.
The related federal contract opportunity is a notice for a sole source, non-commercial Request for Proposal for a 5-year requirements contract for Stryker vehicle Retrofit, Reset/Refurbishment, and Damage Repair services. The requirement is source controlled to General Dynamics Land Systems, with a forecasted quote due date of September 30, 2018. The contracting agency is the Department of the Army Materiel Command Contracting Command Detroit Arsenal.
Not Listed
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB NO. 0704-D188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.
B. Exhibit: AU
C. Category:
TDP |_| TM |_| OTHER |_|
D. System/Item:
Stryker Family of Vehicles
E. Contract/Pr No.
F. Contractor:
GDLS
1. Data Item No.:
S009
2. Title of Data Item:
Final Acceptance Report
3. Subtitle:
17. Price Group:
4. Authority (Data Acquisition Document No.):
DI-MGMT-80920 /T
5. Contract Reference:
C.10.9.2; C.11.10.11.7
6. Requiring Office:
PMO SBCT
18. Estimated Total Price:
7. DD 250 Req:
No
9. Dist. Statement Required:
D
10. Frequency:
Monthly
12. Date of First Submission:
15 calendar days after Vehicle Acceptance
14. Distribution
8. APP Code:
N/A
11. As of Date:
1st vehicle inducted in the period
13. Date of Subsequent Submission:
15th of the Month
a. Addressee:
b. Copies:
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
BLK #: DI-MGMT-80920 is tailored as follows:
Replace section 10.2 with the following:
The contractor shall deliver a Final Acceptance Report in a contractor electronic format compatible with Microsoft Word, Powerpoint, Excel and or Adobe Acrobat. This report shall consist of the inbound Before Operations Preventative Maintenance Checks and Services (PMCS) Report and outbound Before Operations Preventative Maintenance Checks and Services (PMCS) report verifying all deficiencies on the inbound PMCS report have been corrected, for each repaired vehicle accepted by the Government during the previous monthly period. Delivery shall begin 15 days after the date of the first vehicle acceptance. Subsequent deliveries will be on a monthly basis until all of the vehicles on the delivery order have been delivered and accepted by the Government.
Reports can be delivered in conjunction with the presentation to DCMA of the Reset/BDR/Crash Damage serial number specific vehicle work books submitted in electronic format following vehicle acceptance by DCMA, 15 days after vehicle completion of Reset/BDR/Crash Damage.
https://gcscdrl.tacom.army.mil/ext
| 1 |
| 15. TOTAL |
| 12 |
G. Prepared By:
Donnie Kluck H. Date:
19Jan18 I. Approved By:
Donnie Kluck
J. Date:
19Jan18
DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages