B017 - Forecast of FY19-24 - 14SEPT2016.docx

DOCX document 36 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This document contains a Contract Data Requirements List and related federal contract opportunity notice. The Contract Data Requirements List requires the contractor to submit a forecast of common materials needed to support vehicle refurbishment programs for fiscal years 2019 through 2024. The reports must be submitted electronically in Microsoft Excel and include part numbers, descriptions, and quantity forecasts by variant type for each ordering period. The related federal contract opportunity is a planned sole source request for proposal from the US Army to General Dynamics Land Systems for a five-year requirements contract. The contract would provide Stryker vehicle retrofit, refurbishment, damage repair services with an estimated quote due date of September 30, 2018.

Not Listed

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
B008 - Government Owned Drawdown Property Inventory Analysis Report - 25....docx DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB NO. 0704-D188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.

B. Exhibit:

FM

C. Category:

TDP |_| TM |_| OTHER |_|

D. System/Item:

Stryker Family of Vehicles

E. Contract/Pr No.

F. Contractor:

GDLS

1. Data Item No.: B017

2. Title of Data Item:

Forecast of FY19-24

3. Subtitle:

17. Price Group:

4. Authority (Data Acquisition Document No.):

DI-MGMT-80920

5. Contract Reference:

C.11.7.1.4

6. Requiring Office:

PM SBCT

18. Estimated Total Price:

7. DD 250 Req:

9. Dist. Statement Required:

D

10. Frequency:

As needed

12. Date of First Submission:

30 days after award

14. Distribution

8. APP Code:

11. As of Date:

25 Jan 2019

13. Date of Subsequent Submission:

30 days after award of each task order

a. Addressee:

b. Copies:

Draft
Final
Reg
Repro

16. Remarks:

Block 4: DI-MGMT-80920, Block 10, Paragraphs 10.1 and 10.2 are tailored as follows:

Paragraph 10.1: Deleted and replaced with the following, In a contractor electronic format compatible with Microsoft Excel.

Paragraph 10.2 & 10.2.1: Deleted and replaced with the following: “This report shall contain a forecast for common material required to support periods 2 through 5 of the Reset/Refurbishment program.

Reference section B for estimated quantities of vehicles by variant type for each ordering period.

Each report shall include, at a minimum, the following information:

- NSN (If Available)

- Contractor Part Number

- Nomenclature

- Quantity Forecasted for FY16-18 by program (Refurbishment) https://gcscdrl.tacom.army.mil/ext

1

15. TOTAL

G. Prepared By:

Donnie Kluck H. Date:

25 Jan 2018 I. Approved By:

Donnie Kluck

J. Date:

25 Jan 2018

DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages

File details come from the government source that posted it. Updated .