B008 - Government Owned Drawdown Property Inventory Analysis Report - 25....docx
DOCX document 36 KB Posted
- Solicitation number
- W56HZV-18-R-0048
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines requirements for a contractor to deliver an analysis report on government-owned drawdown property and recommendations for disposition. Delivery of the report in Microsoft Word or PDF format is required once by June 23, 2017. The related federal contract opportunity is a planned sole source, 5-year requirements contract between the US Army Contracting Command in Warren, Michigan and General Dynamics Land Systems. The contract will provide requirements for Stryker vehicle retrofit, reset/refurbishment, and damage repair services, with an anticipated request for quotes due by September 30, 2018 issued under the authority of FAR 6.302-1 and 16.503.
Not Listed
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB NO. 0704-D188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.
B. Exhibit: AC
C. Category:
TDP |_| TM |_| OTHER |_|
D. System/Item:
Stryker Family of Vehicles
E. Contract/Pr No.
F. Contractor:
GDLS
1. Data Item No.:
B008
2. Title of Data Item:
Government Owned Drawdown Property Inventory Analysis Report
3. Subtitle:
17. Price Group:
4. Authority (Data Acquisition Document No.):
DI-MGMT-80920 /T
5. Contract Reference:
C.10.12.1.1; C.10.12.1.2 & C.11.12.1.2; C.11.12.1.3;
6. Requiring Office:
PMO SBCT
18. Estimated Total Price:
7. DD 250 Req:
No
9. Dist. Statement Required:
D
10. Frequency:
Once
12. Date of First Submission:
23 June 2017
14. Distribution
8. APP Code:
N/A
11. As of Date:
January 2017
13. Date of Subsequent Submission:
N/A
a. Addressee:
b. Copies:
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
BLK #: DI-MGMT-80920 is tailored as follows-- Replace section 10.2 with the following: The contractor shall deliver an analysis of Government-furnished property provided under the DVH Reset contract, in a contractor electronic format compatible with Microsoft Word, PowerPoint, Excel, and/or Adobe Acrobat.
The analysis shall include, at a minimum, the contractor’s recommendations to the government regarding disposition of the following categories of Government-furnished property in the order of precedence listed below.:
Parts (Based on consumption, and order of precedence as listed below)--
1. DRCF (incl. MGS Post-Ph. II Retrofit Maint Activity & FY17-18 Refurb)
2. Crash Damage Repair
3. 30mm ONS
4. FBH Recap
5. AWCF
6. PCARSS
Tooling & Equipment (Order of precedence as listed below. Within each order of precedence, categorize the item as follows: Local Storage Indoor; Local Storage Indoor Containerized; Local Storage PMCS/Calibration Req’d Defer; Local Storage PMCS/Calibration Req’d Maintain; SNLC Storage Indoor; SNLC Storage Indoor Containerized; SNLC Storage PMCS/Calibration Req’d Defer; SNLC Storage PMCS/Calibration Req’d Maintain; Sierra Army Depot Outdoor; Sierra Army Depot Covered; Summary of est. sq. ft. required and maintenance costs by Order of Precedence/Category)--
1. FY17-18 Refurb
2. 30mm ONS
3. FBH Recap
4. DVH ECP Ph. 2 (Modify Existing Hulls)
5. Crash Damage Repair
6. Depot Maintenance Plant Equipment (DMPE)
7. AWCF
8. PCARSS
The Government will review and provide approval/disapproval within 14 days of receipt.
https://gcscdrl.tacom.army.mil/ext
| 1 |
| 15. TOTAL |
| 7 |
G. Prepared By:
Donnie Kluck H. Date:
19Jan18 I. Approved By:
Donnie Kluck
J. Date:
19Jan18
DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
File details come from the government source that posted it. Updated .