Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This document contains an attachment and solicitation notice related to Stryker vehicle reset and refurbishment services. The attachment outlines the labor split between General Dynamics Land Systems and the Army's Anniston Army Depot for various reset and refurbishment tasks on Stryker, MGS, and NBCRV vehicles through 2023. Tasks are divided between the organizations with percentages ranging from 0 to 100 percent depending on the specific task. The related solicitation is a sole source notice for a five-year requirements contract for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. The requirement is source controlled to General Dynamics Land Systems with a forecasted quote due date of September 30, 2018. The contracting agency is the US Army Contracting Command, Warren, Michigan.

Attachment 0025

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
B008 - Government Owned Drawdown Property Inventory Analysis Report - 25....docx DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Non-MGS and NBCRV

Attachment 025, FY19-23 Labor Split for Refurb/Reset at ANAD
Non-MGS and NBCRV Variants
PhaseProgramTASK% of Vehs ANAD performs task on Labor% of Vehs GDLS performs task on Labor
0REFURB/RESETPrepare Vehicle Book (TI, Structural Assessment, etc)0100
0REFURB/RESETReceive & Offload Vehicle1000
0REFURB/RESETRemove Deployment kits and sort, package and ship to locationa as identified by USG.5050
0REFURB/RESETRemove all exterior armor prior to structural assessment & re-apply during process(optional)5050
1REFURB/RESETStructural Assessment0100
1REFURB/RESETTransport Vehicle to phase 11000
1REFURB/RESETRemove Seats, Floor Boards, Engine Panels and Cooling Grill5050
1REFURB/RESETPerform Incoming TI5050
1REFURB/RESETRemove FUPP5050
1REFURB/RESETRemove Batteries, Clean and Inspect all Components5050
1REFURB/RESETSteam Clean FUPP1000
1REFURB/RESETSteam Clean Vehicle1000
2REFURB/RESETTransport Vehicle to Phase 2 Stand1000
2REFURB/RESETRemove Wheels5050
2REFURB/RESETRemove Differentials5050
2REFURB/RESETRemove and Perform Functional Checks on Heater Head5050
2REFURB/RESETWeld Repair1000
2REFURB/RESETSpall Replacement as required1000
2REFURB/RESETDetailed Engine Bay Cleaning & DCMA buyoff5050
2REFURB/RESETInstall FUPP, Validate Start Up Functions and Install Engine Grille5050
2REFURB/RESETPerform TI Repairs, Mandatory Replacements and Inspections and Conduct Tri-Annual Services5050
2REFURB/RESETInstall Differentials5050
2REFURB/RESETInstall Wheels5050
2REFURB/RESETRemove from Stands1000
2REFURB/RESETPerform Wheel Alignment5050
2REFURB/RESETInstall Batteries5050
2REFURB/RESETReplace/Adjust Armor Panels as required5050
2REFURB/RESETAdd POL5050
2REFURB/RESETAFES test and repairs5050
2REFURB/RESETService RWS & 30 MM Weapon if equiped5050
2REFURB/RESETService Winch5050
2REFURB/RESETGeneral Troubleshooting (Static Testing)5050
2REFURB/RESETInstall Golden Set, Test Communications and Wiring - SVC included5050
2REFURB/RESETOutbound TI5050
2REFURB/RESETOutbound TI Repairs5050
2REFURB/RESETRoad Test5050
3REFURB/RESETInstall Floor Boards, Seats5050
3REFURB/RESETFinal Wash Vehicle1000
3REFURB/RESETFinal Paint Vehicle (exterior and select interior components)1000
3REFURB/RESETDCMA Final Acceptance Inspection5050
3REFURB/RESETShortage Application5050
3REFURB/RESETPackaging Prep for Shipment5050
3REFURB/RESETDeliver to shipping Point5050
3REFURB/RESETPrepare Vehicle Shipping Documentation and Coordinate with USG for Movement0100
REFURB/RESETREFURB/RESETFUPP - Repair5050
REFURB/RESETREFURB/RESETNBC sub assembly1000
REFURB/RESETREFURB/RESETMC Gun, Light Weight Mine Roller (LWMR), ESVV MEP Refurb Manufacturer's Standard Repair (MSR) of Drive Line and RWS NEOF checkout1000
REFURB/RESETREFURB/RESETWheel & Tire - per tire criteria1000
REFURB/RESETREFURB/RESETRun-Up Differentials - minor repairs as required1000

REFURB/RESET REFURB/RESET Site Materials Management 0 100

Attachment 025, FY19-23 Labor Split for Reset at ANAD (by vehicles per effort) MGS & NBCRV Variant As of 05 January 2018

&P

DRAFT

MGS - NBCRV

Attachment 025, FY19-23 Labor Split for Refurb/Reset at ANAD
MGS & NBCRV Variant
ProgramTASKANAD LABOR SPLITGDLS LABOR SPLIT
REFURB/RESETMGS removal of deployment kits5050
REFURB/RESETRemove all exterior armor prior to structural assessment & re-apply during process(optional)5050
REFURB/RESETMGS chassis repair5050
REFURB/RESETMGS turret-related repair tasks per the IETM (labor split per vehicle)5050
REFURB/RESETMGS turret-to chassis reintegration (labor split per vehicle)5050
REFURB/RESETMGS vehicle presentation to DCMA5050
REFURB/RESETNBCRV removal of deployment kits5050
REFURB/RESETRemove all exterior armor prior to structural assessment & re-apply during process(optional)5050
REFURB/RESETNBCRV removal/reinstallation of MEP Components (labor split per vehicle)5050
REFURB/RESETNBCRV remove/reinstall NBC sensor system components (labor split per vehicle)5050
REFURB/RESETNBCRV chassis repair per the IETM (labor split per vehicle)5050
REFURB/RESETNBCRV vehicle presentation to DCMA5050

Note: GDAO is allowed use & access to MGS STTE & Tooling required for future MGS effots

Attachment 025, FY19-23 Labor Split for Reset at ANAD (by vehicles per effort) MGS & NBCRV Variant As of 05 January 2018