A0014 - RFV.DOCX

DOCX document 28 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This Contract Data Requirements List outlines technical requirements for Requests for Variance submissions related to the Stryker Family of Vehicles program. The contractor, General Dynamics Land Systems, must submit approved minor Requests for Variance monthly in the first week of the month for archiving, including justification, documentation, and consideration. Major Requests for Variance must be submitted within three business days of identifying a major departure from baseline requirements. Recurring or permanent change requests must be resubmitted in accordance with Engineering Change Proposal requirements. The Army Contracting Command in Warren, Michigan will issue a sole source Request for Proposal for a five-year requirements contract for Stryker vehicle Retrofit, Reset/Refurbishment, and Damage Repair services with a forecasted quote due date of September 30, 2018. The requirement is source controlled to General Dynamics Land Systems.

Not Listed

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
B008 - Government Owned Drawdown Property Inventory Analysis Report - 25....docx DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY
TDP
TM
OTHER

D. SYSTEM/ITEM.

Stryker Family of Vehicles

E. CONTRACT/PR NO.

F. CONTRACTOR

General Dynamics Land Systems

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Request For Variance (RFV)

3. SUBTITLE

Variance, RFV, deviation, RFD, waiver, RFW

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

C.4.3.1, C.4.3.2.3, C.4.3.2.3.1.3, C.4.3.2.3.2, C.4.3.2.4

6. REQUIRING OFFICE

SFAE-GCS-S

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

SEE BLK 16

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

a. ADDRESSEE
b. COPIES
Draft
Final
Reg
Repro

16 REMARKS

Files delivered shall include TrueType Fonts and Searchable Text option. All files shall have text recognition capability.

The terms ‘Variance’ and ‘RFV’ are synonymous with former terms – ‘deviation’, ‘RFD’, ‘waiver’, and ‘RFW’.

Prepare the RFV in accordance with forms DD1694-DD1694C, or equivalent contractor format.

Forms and instructions are available from the DoD Forms Management website at:

http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm.

Major, minor, and critical classification are also defined in the DD1694 form preparation instructions.

Blocks 2 & 4: Submit supporting documentation as part of the RFV.

Block 7: LT = Letter of Transmittal; submit to addressees as notification that deliverable has been submitted.

Block 8:

The Government will:

a) disposition or comment on major RFVs within 5 business days of receipt;

b) not allow critical RFVs (i.e., a departure impacting health, safety, environment, or security).

Delivery after 12:00 noon on a business day shall constitute a formal delivery on the next business day.

Ace Windchill *

15. TOTAL

G. PREPARED BY

H. DATE

30 JAN 18

I. APPROVED BY

J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

A027

B. EXHIBIT

C. CATEGORY
TDP
TM
OTHER

D. SYSTEM/ITEM.

Stryker Family of Vehicles

E. CONTRACT/PR NO.

F. CONTRACTOR

General Dynamics Land Systems

16 REMARKS (Continued)

Block 9: Technical data shall be marked with an appropriate Distribution Statement and, as applicable, the Export Control Notice, prior to distribution, regardless of media. The Contractor shall contact the Program Office, SFAE-GCS-S, for the appropriate distribution statement/export control warning, prior to finalization of data.

Blocks 10, 12 & 13:

The contractor shall submit approved minor RFVs monthly, in the first week of the month for archiving. Include justification, documentation, and consideration. All other Requests for Variance shall be submitted for Government approval. Include justification, documentation, and consideration

a) submit a Major RFV within 3 business days of identifying a major departure from baseline requirements.

Delivery after 12:00 noon on a business day shall constitute a formal delivery on the next business day.

Upon receipt of Government comments:

a) resubmit amendments, corrections or revisions to major RFVs within 2 business days.

b) resubmit recurring or permanent changes in accordance with ECP requirements

Delivery after 12:00 noon on a business day shall constitute a formal delivery on the next business day.

Block 14:

Repro = electronic/digital copies ** https://ace2.tacom.army.mil/index.html

DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 2 Pages image1.wmf

File details come from the government source that posted it. Updated .