Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx
XLSX spreadsheet 3 MB Posted
- Solicitation number
- W56HZV-18-R-0048
About this file
This document contains a corrosion assessment form and federal contract opportunity notice. The corrosion assessment form provides a structured process for inspecting corrosion on Stryker vehicle hulls and appurtenances. Inspectors will assess 88 hull items and 26 appurtenance items for corrosion level, take photographs of severe corrosion, and report findings. The federal contract opportunity is a sole source request for proposal from the Army Contracting Command for a five-year requirements contract for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. The incumbent contractor is General Dynamics Land Systems, with a forecasted quote due date of September 30, 2018.
Attachment 0030
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corrosion inspection Vehicle Serial No (including year group):______________________________ (e.g., ICVV-0001-10)
Date: __________________________
Program (Select exactly one):
RESET _____
REFURB____
EXCHANGE _____
OVERHAUL (Pre-Hull Blast)_______ OVERHAUL (Post-Hull Blast)______
BDR ______
Field Level ______ 30MM (Pre-Hull Blast)_______ 30MM (Post-Hull Blast)______
Inspector’s Information:
Name: ____Craig McCombs___________________________ Email: ________________________________ Phone Number: _____________ Organization:
ANAD____ GDLS _X___ PMO SBCT____ CVE____ Unit____
| Prepared by: PMO SBCT |
| Date: 9-19-2016 |
| DOCUMENT: |
| REVISION: 3 |
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and DoD contractors only, per the STRYKER Security Classification Guide and Program Protection Plan. Date of determination is 27 March 2003. Other requests for this document shall be referred to Project Manager Brigade Combat Team, ATTN: SFAE-GCS-BCT, DSN 786-2000 or Commercial 586-753-2000
1. Purpose and Scope
2. Revision Control Chart (Configuration Management Only)
3. Introduction
4. Stages of Corrosion
5. Reporting Corrosion
6. Preliminary Assessment
A. Stryker FOV Hull
B. Stryker FOV Appurtenances
| 1. PURPOSE AND SCOPE |
| The purpose of this document is to allow for a structured approach in collecting Stryker DVH corrosion data. All conclusions and findings from the assessment performed on the corroded hull and appurtenances will be submitted to PMO SBCT for further action. The document is intended to be used for ALL VARIANTS of the Stryker Family of Vehicles, despite depicting an Infantry Carrier Vehicle (ICV). |
2. REVISION CONTROL CHART (CONFIGURATION MANAGEMENT ONLY)
| Revision Level | Change Description | Changed By | Date |
| NR | INITIAL RELEASE | SN | January 20, 2015 |
| 1 | Modified Program and Organization selection fields. Modified photo placard. Added auto highlighting to visibility and assessment cells. | June 3, 2016 | |
| 2 | Added pitting criteria | SN | September 19, 2016 |
| 3 | Formatting Updated | SN | September 27, 2016 |
| 3. INTRODUCTION | |||
| The Stryker Corrosion Assessment Program was implemented to provide a structured approach to understanding, identifying and documenting the stages of corrosion present on the Stryker FOV. Once collected, the data will be used to support the program goals of determining the extent of corrosion in the fleet, determination of trends, supporting trend analysis, and development of corrosion mitigation strategies (Recapitalization, etc.). |
| 4. STAGES OF CORROSION |
| The different stages of corrosion are described below in Table 1 are taken from the U.S. Army TACOM Corrosion rating System. Examples of the corrosion stages are also highlighted in several of the pictures contained in Figures 1-5 of this document. These figures are for informational purposes only and are not intended to be all-inclusive. The severity of corrosion shall be determined by the narrative for the five (5) stages of corrosion listed below. For the purpose of this corrosion assessment, corrosion stages are defined as follows: |
| STAGE | DESCRIPTION |
| 0 | No visible signs of corrosion or degradation due to corrosion. White, red, and/or black corrosion products are not present. No paint film defects due to corrosion. Discoloration of the coating system is acceptable provided it is not caused by corrosion and does not affect the infrared signature. |
| 1 | General surface corrosion and/or minor blistering is present. White, red, and/or black corrosion products are present on the component surface being evaluated, but no significant degradation due to corrosion. |
| 2 | Heavy corrosion products are visible on the surface of the component. Base metal loss is beginning, but does not yet impair part function. White, red, and/or black corrosion products are visible. Severe paint blistering may be visible. |
| 3 | Significant metal loss due to corrosion is present, reducing the cross-sectional thickness of the part/component. Voluminous white, red, and/or black corrosion products are present. The part may have lost its structural integrity. Pinholes or craters may have developed in the base metal. |
| 4 | The base metal is perforated and/or the part/component has lost structural integrity. |
Table 1: US Army TACOM Corrosion Rating Scale
Figure 1, Corrosion on MIL-Spec CARC Painted Cold Rolled Steel
Figure 2 Figure 3
Figure 4 Figure 5
5. Substrate Evaluation (Pitting)
| A. Substrate evaluation of plate metal will be conducted AFTER the hull has been blasted to check for pitting due to corrosion. The procedures and criteria |
| are outlined in the General Information, Equipment Description and Theory of Operation for Weld Inspection for Stryker Family of Vehicles document. |
| Work Package 0007 contains the procedures to conduct hull plate inspections and the hull plate tolerances. Work package 0008 contains the |
| acceptance criteria for substrate pitting. |
6. REPORTING CORROSION
A. Using the Preliminary Assessment below, the inspector will assess the specified vehicle section for corrosion using Figures 1 through 5 and Table 1 as a guide. The inspector will place an “X” in the appropriate box to document the stage of corrosion present in the respective vehicle section. If a section of the vehicle is not accessible, the inspector will place an “X” in the “E” block.
B. Using Figure 7 as a guide, the inspector will annotate the visibility of the area being inspected by placing an “X” in the appropriate block. There can be only one entry per item in the visibility code section.
C. Photographs must be taken to document Stage 3 and 4 corrosion. The inspector will take two pictures of the item inspected. The first photograph will be of the entire item and the second photograph will be of the area of the item that contains the corrosion.
| 1. The first photograph will be a wide angle view of the item number for a perspective of the corroded area(s). |
| 2. The second photograph will be a close up view to detail the corrosion. |
D. In the event that more than one area of stage 3 or 4 corrosion per item is found, the inspector will indicate only the most severe case of corrosion on the line item of the form. There can be only one entry per line item. To document more than one instance of stage 3 or 4 corrosion on the same item, the inspector will photograph each area and annotate the level of corrosion in the Notes area at the end of each section of the Preliminary Inspection (Hull or Appurtenances).
E. The inspector will print and fill out the Photo Identification Placard, Figure 6, in block printing and place it next to the area being photographed to document the effort.
F. The inspector will use the following naming convention when saving photos:
Vehicle-serial-number-year-group_side_item number_stage_program_date_MMDDYYYY_XofY where X is Photo sequence # and Y is Total # of Photos. For example, the first photograph from an assessment of ICV-0001-05 with a corrosion issue in Item 12 that is Stage 4 on its exterior side, inspected in the Reset program, and completed on January 5, 2015 would be named: ICV-0001-05_exterior_12_STAGE4_RESET_01052015_1of2.jpg
G. The assessment and the photos will be attached to an email that will be sent to the following PMO SBCT mailbox: Usarmy.detroit.peo-gcs.mbx.stryker-corrosion-assessments@mail.mil.
STRYKER CORROSION ASSESSMENT PROGRAM
VEHICLE TYPE, SERIAL #, YEAR GROUP
ITEM NUMBER
INTERIOR OR EXTERIOR
STAGE OF CORROSION
PROGRAM (RESET/EXCHANGE/OH, ETC.)
DATE (MMDDYYY)
Figure 6, Photo Identification Placard
| Visibility Code | |
| Level | Description |
| V | Visible. (< 25% obstructed view) Most or all of the area is visible for inspection. |
| O | Obstructed View: (25% - 95% obstructed). Area is hidden behind other components. Only a Limited assessment can be captured. |
| E | Entirely Covered: (95% - 100% obstructed). Area covered with spall, armor or other components that does not allow proper assessment of the area. |
Figure 7
7. PRELIMINARY ASSESSMENT
The preliminary assessment for Stryker Family of Vehicles (FOV) is divided into 2 sections; hull and appurtenances. Each section contains information about each plate within the hull, and each appurtenance. The inspector(s) are required to input corrosion assessment data for each plate and appurtenance that applies to the hull being inspected. (e.g., ALL items MUST have an entry.)
A. Stryker FOV Hull
B. Stryker FOV Appurtenances
Note: Corrosion assessments conducted under Overhaul and 30 mm Programs should be performed AFTER disassembly so that visibility is 100%
A. Stryker DVH FOV Hull
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 1 | BOW PLATE, LOWER | ||||||||||||||||||||
| 2 | TRANSITION PLATE, FRONT, RH | ||||||||||||||||||||
| 3 | TRANSITION PLATE, FRONT, LH | ||||||||||||||||||||
| 4 | FRONT BUMPER PLATE | ||||||||||||||||||||
| 5 | CHEEK PLATE, LOWER REAR, RH | ||||||||||||||||||||
| 6 | CHEEK PLATE, LOWER REAR, LH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 7 | CHEEK PLATE, LOWER FRONT, RH | ||||||||||||||||||||
| 8 | CHEEK PLATE, LOWER FRONT, LH | ||||||||||||||||||||
| 9 | SPONSON PLATE, RH | ||||||||||||||||||||
| 10 | TOE PLATE | ||||||||||||||||||||
| 11 | SPONSON PLATE, LH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 12 | DRIVER'S FLOOR & FRONT TUNNEL ASSY | ||||||||||||||||||||
| 13 | FENDER PLATE, FRONT, LH | ||||||||||||||||||||
| 14 | FENDER PLATE, FRONT, RH | ||||||||||||||||||||
| 15 | # 2 HOUSING ASSY STRUT RH | ||||||||||||||||||||
| 16 | # 1 HOUSING ASSY STRUT RH | ||||||||||||||||||||
| 17 | # 2 HOUSING ASSY STRUT LH | ||||||||||||||||||||
| 18 | # 1 HOUSING ASSY STRUT LH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 19 | PLATE ASSY, ENGINE FLOOR FRONT | ||||||||||||||||||||
| 20 | FLANGE PLATE ASSY, TUNNEL FRONT | ||||||||||||||||||||
| 21 | TRANSITION PLATE ASSY, REAR, LH | ||||||||||||||||||||
| 22 | TRANSITION PLATE ASSY, REAR, RH | ||||||||||||||||||||
| 23 | PLATE ASSY, ENGINE FLOOR, REAR |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 24 | BRACKET STOP, RH | ||||||||||||||||||||
| 25 | BRACKET STOP, LH | ||||||||||||||||||||
| 26 | FRONT FLANGE, LH | ||||||||||||||||||||
| 27 | MOUNTING PAD ASSY, LH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 28 | REAR FENDER, LH | ||||||||||||||||||||
| 29 | REAR TUNNEL | ||||||||||||||||||||
| 30 | #4 AXLE TORSION BAR TUBE | ||||||||||||||||||||
| 31 | #3 AXLE TORSION BAR TUBE | ||||||||||||||||||||
| 32 | RH FLOOR TRANSITION PLATE | ||||||||||||||||||||
| 33 | LH FLOOR TRANSITION PLATE | ||||||||||||||||||||
| 34 | REAR FENDER, RH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 35 | RH SPONSON WELD COVERS | ||||||||||||||||||||
| 36 | LH SPONSON WELD COVERS | ||||||||||||||||||||
| 37 | LH #3 CROSS TUNNEL | ||||||||||||||||||||
| 38 | LH #4 CROSS TUNNEL | ||||||||||||||||||||
| 39 | REAR FLOOR WELD COVERS | ||||||||||||||||||||
| 40 | RH #4 CROSS TUNNEL | ||||||||||||||||||||
| 41 | RH #3 CROSS TUNNEL | ||||||||||||||||||||
| 42 | CENTRE FLOOR WELD COVERS | ||||||||||||||||||||
| 43 | FRONT FLOOR WELD COVERS |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 44 | REAR WALL TRANSITION | ||||||||||||||||||||
| 45 | RH REAR FENDER TRANSITION | ||||||||||||||||||||
| 46 | LH REAR FENDER TRANSITION | ||||||||||||||||||||
| 47 | REAR WALL UPPER | ||||||||||||||||||||
| 48 | REAR WALL LOWER |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 49 | RH #4 AXLE DRIVE TUNNEL COVER | ||||||||||||||||||||
| 50 | RH#3 AXLE DRIVE TUNNEL COVER | ||||||||||||||||||||
| 51 | REAR TUNNEL COVER | ||||||||||||||||||||
| 52 | LH #3 AXLE DRIVE TUNNEL COVER | ||||||||||||||||||||
| 53 | LH #4 AXLE DRIVE TUNNEL COVER | ||||||||||||||||||||
| 54 | LH FRONT FLOOR COVER | ||||||||||||||||||||
| 55 | INTERNAL REAR FLOOR WELD COVERS 3X | ||||||||||||||||||||
| 56 | AXLE DRIVE COVER GUSSETS 8X | ||||||||||||||||||||
| 57 | INTERNAL CENTER FLOOR WELD COVER |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 58 | RH REAR ROOF SUPPORT, REAR | ||||||||||||||||||||
| 59 | RH REAR ROOF SUPPORT, FRONT | ||||||||||||||||||||
| 60 | LH REAR ROOF SUPPORT, REAR | ||||||||||||||||||||
| 61 | LH REAR ROOF SUPPORT, FRONT | ||||||||||||||||||||
| 62 | LH REAR FENDER DOUBLER, FRONT | ||||||||||||||||||||
| 63 | LH REAR FENDER TRANSITION | ||||||||||||||||||||
| 64 | RH REAR FENDER DOUBLER, REAR | ||||||||||||||||||||
| 65 | RH REAR FENDER DOUBLER, FRONT |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 66 | WINCH BOX ASSY | ||||||||||||||||||||
| 67 | BOW PLATE, UPPER ASSEMBLY | ||||||||||||||||||||
| 68 | CHEEK PLATE UPPER, RH | ||||||||||||||||||||
| 69 | CHEEK PLATE UPPER, LH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 70 | PLATE ASSY, DRIVER'S ROOF | ||||||||||||||||||||
| 71 | PLATE, FILLER |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | V | O | E | 0 | 1 | 2 | 3 | 4 | V | O | E | ||
| 72 | SIDEWALL ASSY, RH | ||||||||||||||||||
| 73 | SIDEWALL ASSY, LH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 74 | GUARD, RH | ||||||||||||||||||||
| 75 | BOX | ||||||||||||||||||||
| 76 | PLATE INSEP ASSY | ||||||||||||||||||||
| 77 | GUARD, LH | ||||||||||||||||||||
| 78 | PLATE ASSY | ||||||||||||||||||||
| 79 | HOUSING COM HATCH |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 80 | CAP. GRILL | ||||||||||||||||||||
| 81 | GUN BASE | ||||||||||||||||||||
| 82 | REAR ROOF PLATE ASSEMBLY | ||||||||||||||||||||
| 83 | FRONT ROOF PLATE ASSEMBLY |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 84 | CENTER ROOF ASSEMBLY |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 85 | #2 STRUT BRACKET ASSY RH | ||||||||||||||||||||
| 86 | #1 STRUT BRACKET ASSY RH | ||||||||||||||||||||
| 87 | #2 STRUT BRACKET ASSY LH | ||||||||||||||||||||
| 88 | #1 STRUT BRACKET ASSY LH | ||||||||||||||||||||
| 89 | STIFFENER |
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | |||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
| 90 | ENGINE BULKHEAD ASSEMBLY |
| NOTES: | ||||||||||||||||||||||
| DVH HULL STRUCTURE CORROSION INSPECTION | Exterior Side | Pitting (Post Blast) | Visibility | Interior Side | Pitting (Post Blast) | Visibility | ||||||||||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E | 0 | 1 | 2 | 3 | 4 | Present | Fail | V | O | E |
B. Stryker DVH FOV Appurtenances
| DVH APPURTENANCE CORROSION INSPECTION | Exterior Side | Visibility | |||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | V | O | E |
| 91 | Brush Guards | ||||||||
| 92 | Lighting assemblies and electrical connectors | ||||||||
| 93 | Mirror brackets | ||||||||
| 94 | Front hatches covers, handles, hinges | ||||||||
| 95 | wire cutter mount | ||||||||
| 96 | Tiedown lugs and towing clevises | ||||||||
| 97 | Recovery winch bracket |
| DVH APPURTENANCE CORROSION INSPECTION | Exterior Side | Visibility | |||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | V | O | E |
| 98 | Antenna Mounts | ||||||||
| 99 | Tow bar and tow bar plate assy (if applicable) | ||||||||
| 100 | Lifting lug | ||||||||
| 101 | Wheels, hubs and studs |
| DVH APPURTENANCE CORROSION INSPECTION | Exterior Side | Visibility | |||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | V | O | E |
| 102 | Jerry Can Brackets L&R | ||||||||
| 103 | Rear door, rear ramp, doors hinges and handles | ||||||||
| 104 | Phone box brackets | ||||||||
| 105 | Fuel fill covers x2 | ||||||||
| 106 | Taillight assemblies and electrical connectors | ||||||||
| 107 | Tiedown lugs and towing clevises | ||||||||
| 108 | Pintle (or pintle plug if pintle is removed) | ||||||||
| 109 | Handles | ||||||||
| 110 | Winch and winch cover assembly | ||||||||
| 111 | Hatch and hatch hinges | ||||||||
| 112 | Power entry panel door, handle &hinge | ||||||||
| 113 | Antenna mount | ||||||||
| 114 | Wheel, hubs and studs | ||||||||
| 115 | Chain case/tire jack storage |
| DVH APPURTENANCE CORROSION INSPECTION | Exterior Side | Visibility | ||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | V | O | E | |
| 116 | Hatches and hinges | |||||||||
| 117 | Grilles | |||||||||
| 118 | Weapons station | |||||||||
| 119 | Wire cutter mount | |||||||||
| 120 | Engine hatch and hinge | |||||||||
| 121 | Radiator mounts (engine compartment) | |||||||||
| 122 | Alternator (engine compartment) | |||||||||
| NOTES: | ||||||||||
| DVH APPURTENANCE CORROSION INSPECTION | Exterior Side | Visibility | ||||||||
| Item | Component | 0 | 1 | 2 | 3 | 4 | V | O | E |
&"-,Bold"&26Stryker Double V Hull (DVH) Corrosion Assessment Form
&"-,Bold"&26Stryker Double V Hull Corrosion Assessment Form
DISTRIBUTION STATEMENT D AS PER COVER PAGE APPLIES Page &P of &N
Stage 0
Stage 1
Stage 2
Stage 3
Stage 4
Stage 1
Stage 2
Stage 3
Stage 4
6) CHEEK PLATE, LOWER REAR, LH
28) REAR FENDER, LH
34) REAR FENDER, RH
44) REAR WALL TRANSITION
19) PLATE ASSY, ENGINE FLOOR, FRONT
19) PLATE ASSY, ENGINE FLOOR, FRONT
35) RH SPONSON WELD COVERS
35) RH SPONSON WELD COVERS
37) LH #3 CROSS TUNNEL
48) REAR WALL
LOWER
53) LH #4 AXLE DRIVE TUNNEL COVER
53) LH #4 AXLE DRIVE TUNNEL COVER
53) LH #4 AXLE DRIVE TUNNEL COVER
53) LH #4 AXLE DRIVE TUNNEL COVER
53) LH #4 AXLE DRIVE TUNNEL COVER
60) LH REAR ROOF SUPPORT, REAR
64) RH REAR FENDER DOUBLER, REAR
69) CHEEK PLATE UPPER, LH
76) PLATE INSEP ASSY
89) STIFFENER
Photo Notes
| take two pictures |
| if more than one area of corrosion exists then document the worst |
| only one entry per section including visibility |
| use 1 of X to name photos |
| delete n/a |
| check with cary deal on photos |
| add year group to dvh photo naming convention |
image1.jpeg image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.emf image18.emf image19.emf image2.jpeg image20.emf image21.emf image22.emf image23.emf image24.png image25.png image26.png image27.png image28.png image3.jpeg image4.jpeg image5.jpeg image6.emf image7.emf image8.emf image9.emf
File details come from the government source that posted it. Updated .