Attachment_0005_-_EIA_649-1_Tailoring.docx

TIA Standard DOCX document 27 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This document outlines tailoring requirements for a configuration management plan and details for a sole source contract solicitation. The configuration management plan tailoring specifies that the supplier will create and maintain product configuration documentation during contract performance. The supplier is authorized to use its own engineering change and configuration status accounting formats provided all required data elements are included.

The solicitation notice indicates the Army Contracting Command will issue a sole source request for proposal for a five-year requirements contract for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. The requirement is reserved for General Dynamics Land Systems, with quotes due by September 30, 2018. The services required involve maintenance and repair of Stryker vehicles.

Attachment 0005

View the file

Who attaches TIA-649

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
B008 - Government Owned Drawdown Property Inventory Analysis Report - 25....docx DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0002 - EIA 649-1 Tailoring 17 Oct 2017

The following sections of EIA 649-1, CM Requirements for Defense Contracts, are tailored for this contract:

Rationale, Forward, Introduction

No changes

2.3 Definitions

Acquirer is the U.S. Government.

Product Configuration Documentation (PCD), consists of Product Definition Information (PDI), Product Operational Information (POI), and Software Configuration Documentation (SCD), and is synonymous with Product Configuration Information (PCI) as defined in EIA 649.

Engineering Change Proposal (ECP) is synonymous with Engineering Change, Engineering Change Order (ECO) and other alias terms (e.g., change request, configuration change, request for change, engineering change request).

Engineering Release Record (ERR) is synonymous with Change Notice and other alias terms (e.g., Engineering Change Notice, Change Order, and Engineering Change Order).

Table 1, Table 2, Table 3, and Annex A-Tailoring Worksheet, are for reference only.

3.1 Planning and Management

No changes

3.2 Configuration Identification.

a. 3.2.2: The Supplier shall create product configuration documentation (PCD) and be the maintainer of the product baselines during the contract performance period.

b. 3.2.2.3(1): “The Supplier shall maintain the current approved configuration documentation by creating a new revision to configuration documentation within the timeframe required by the contract.

The new revision to the configuration document will provide traceability by detailing, in the Description of Change block on drawings and in the corresponding CAD parameter, conditions before and after the change is incorporated and by identifying the change using the applicable ERR number as the revision authority.”

c. 3.2.3(6): The Supplier does not need Acquirer approval to use a Supplier format ERR form, providing all content from ERR form DD2617 is included.

3.3 Configuration Change Management.

a. 3.3.1.1(1): “When an engineering change affects previously approved documentation, the Supplier shall perform the following actions:”

b. 3.3.1.3(2): The Supplier does not need Acquirer approval to use a Supplier format ECP form, providing all content from ECP forms DD1692, continuation page, and pages 1 through 7 is included.

c. 3.3.1.5: “The Acquirer is the configuration approval authority for Major (Class I) and Minor (Class 2) engineering changes as stated in the contract.”

d. 3.3.2(2): Post-production RFVs include products during production.

e. 3.3.3: Delete (1) and (2) and the NOTE. The Supplier shall submit proposed specifications in the ECP. Describe the change in accordance with ECP requirements.

3.4 Configuration Status Accounting

a. 3.4(4)d: The Supplier shall deliver end of contract (EOC) CSA information in accordance with the CSA SOW and CDRL.

3.5 Configuration Verification and Audits

No changes