B001 - Removed Deployment Kit Inventories - 03MAR2018.docx

DOCX document 33 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and information about a related federal contract opportunity. The CDRL requires the contractor to deliver quarterly reports to the Program Management Office Stryker Brigade Combat Team detailing the quantities and disposition of removed deployment kit items from Stryker vehicle refurbishment by contract order and modification. The related federal contract opportunity is a planned sole source, 5-year requirements contract issued by the US Army Contracting Command, Warren, Michigan to General Dynamics Land Systems for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. Quotes for the work are due by September 30, 2018.

Not Listed

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
B008 - Government Owned Drawdown Property Inventory Analysis Report - 25....docx DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB NO. 0704-D188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.

B. Exhibit: AA

C. Category:

TDP |_| TM |_| OTHER |_|

D. System/Item:

Stryker Family of Vehicles

E. Contract/Pr No.

F. Contractor:

GDLS

1. Data Item No.:

B001

2. Title of Data Item:

Removed Deployment Kit Inventories

3. Subtitle:

17. Price Group:

4. Authority (Data Acquisition Document No.):

DI-MGMT-80920 /T

5. Contract Reference:

C.11.10.2.1.; C.11.10.2.2;

6. Requiring Office:

PMO SBCT

18. Estimated Total Price:

7. DD 250 Req:

N/A

9. Dist. Statement Required:

D

10. Frequency:

Quarterly until complete

12. Date of First Submission:

30 days after contract award

14. Distribution

8. APP Code:

N/A

11. As of Date:

30 DAC

13. Date of Subsequent Submission:

a. Addressee:

b. Copies:

Draft
Final
Reg
Repro

16. Remarks:

BLK #: DI-MGMT-80920 is tailored as follows:

Replace section 10.2 with:

Contractor shall deliver a single report in a contractor electronic format compatible with Microsoft Excel.

Each report shall include the following information:

- Total cumulative quantities of removed, serviceable (site determined) deployment kits item pieces, specified by Kits Name, Vehicle Variant, NSN (if available) and Part Number segregated by each Refurb contract delivery order or modification.

-Total cumulative quantities of removed, unserviceable (site determined) deployment kit item pieces, specified by Kits Name, Vehicle Variant, NSN (if available) and Part Number, and disposition/location, segregated by each Refurb contract MOD.

Fasteners / consumable items not to be tracked.

https://gcscdrl.tacom.army.mil/ext

1
15. TOTAL
12

G. Prepared By:

Donnie Kluck H. Date:

03 Mar 2018 I. Approved By:

Donnie Kluck J. Date:

03 Mar 2018

DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages

File details come from the government source that posted it. Updated .