A007 - MRR.DOCX

DOCX document 30 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for material received reporting on the Stryker Family of Vehicles program. General Dynamics Land Systems is required to annually submit a Material Received Report (MRR) detailing part numbers, nomenclature, purchase order numbers, quantities, costs and contractor task identification numbers mapped to government contract work directives. The MRR is due 90 days after each anniversary of the contract award date and shall be delivered using the Government's Integrated Data Environment in contractor format including as a minimum the outlined data fields.

Not Listed

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
B008 - Government Owned Drawdown Property Inventory Analysis Report - 25....docx DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB NO. 0704-D188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.

B. Exhibit:

BR

C. Category:

TDP |_| TM |_| OTHER |_|

D. System/Item:

Stryker Family of Vehicles

E. Contract/Pr No.

F. Contractor:

General Dynamics Land Systems

1. Data Item No.:

A007

2. Title of Data Item:

Material Received Report

3. Subtitle:

17. Price Group:

4. Authority (Data Acquisition Document No.):

DI-SESS-81903 /T

5. Contract Reference:

C.4.2

6. Requiring Office:

SFAE-GCS-SB

18. Estimated Total Price:

7. DD 250 Req:

LT

9. Dist. Statement Required:

E

10. Frequency:

Annual

12. Date of First Submission:

See Block 16

14. Distribution

8. APP Code:

D

11. As of Date:

See Block 16

13. Date of Subsequent Submission:

N/A

a. Addressee:

b. Copies:

Draft
Final
Reg
Repro

16. Remarks:

BLK 4: DI-SESS-81903 is tailored as follows:

1. Paragraph 2.1 is deleted.

Block 9: ADMINISTRATIVE OR OPERATIONAL USE. To protect technical or operational data or information from the automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data.

Block 11: The report shall be as of the anniversary of the contract award date.

Block 12: Due 90 days after the anniversary of contract award.

Block 14: The contractor shall submit data to the Government using the Government managed Integrated Data Environment.

Block 16: The MRR shall be delivered in contractor format and shall contain, at a minimum, the following data fields: Part Number, Part Nomenclature, Purchase Order Number, CLIN (not required for firm-fixed price delivery orders), Contractor Task ID Number (charge code), Project, Plant, Purchase Order Quantity, Purchase Order Extended Cost.

The contractor shall include a table that maps Contractor Task ID Numbers (charge codes) to Government contract work directive numbers.

richard.p.gilliland.civ@mail.mil

15. TOTAL

G. Prepared By:

H. Date:

I. Approved By:

J. Date:

DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages image1.emf image2.emf

File details come from the government source that posted it. Updated .