Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx
DOCX document 20 KB Posted
- Solicitation number
- W56HZV-18-R-0048
About this file
This document provides a timeline for the closeout of a refurbishment contract for Stryker vehicles. The timeline outlines key dates for the shutdown of refurbishment lines in May 2017, the issuance of a closeout modification to General Dynamics Land Systems in June 2017, the submission of closeout documentation to the US government through July 2017, the end of refurbishment vehicle production in August 2017, the identification and shipment of equipment and materials to designated locations through November 2017, and the turnover of refurbishment warehouses and buildings to the contracting officer representative by December 2017. The related federal contract opportunity notice indicates the US Army Contracting Command, Warren, MI plans to issue a sole source request for proposal in September 2018 for a 5-year requirements contract for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. The requirement is source controlled to General Dynamics Land Systems.
Attachment 0020
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0020, ANAD Refurb Closeout Timeline to FY16-18 Stryker Refurb Contract As of 16AUG16 ANAD Refurb Closeout Timeline The dates specified immediately below are tentative/estimated dates.
Refurb Line Shutdown
| May 11, 2017 | Closeout Mod Issued for ANAD Central Refurb | |
| May 16, 2017 | Signed mod issued to GDLS | |
| June 23, 2017 | CDRL B0008 submitted to USG | |
| July 04, 2017 | USG guidance returned to GDLS per CDRL timing | |
| July 05, 2017 | USG attachment 0018 (disposition plan) provided to GDLS | |
| July 30, 2017 | Refurb Vehicle Production Ends | |
| August 31, 2017 | Reduce warehouse and all site items. Begin to package and prepping for shipment | |
| Monthly | Identify/prioritize disposition and inventories, packing, prepping shipment of equipment, tooling and equipment. Shipments of PM owned Material or GFM Property to designated areas per attachment 0018 | |
| November 28, 2017 | All PM owned productive material and/or GFM assets shipped to designated locations per attachment 0018. | |
| December 14, 2017 | Turn in of refurb warehouses, buildings to COR. |