B014 - Transfer of GFM - 25JAN2018.docx

DOCX document 33 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for the transfer of Government Furnished Material (GFM) between contracts for the Stryker Family of Vehicles. General Dynamics Land Systems, Inc. is required to submit reports detailing any planned transfers of GFM between contracts or delivery/task orders 15 days prior to the end of each Task Order period of performance. The Government will review each report and provide disposition instructions within 10 days, and the contractor must submit a final report within 5 days of receiving disposition instructions. If disposition instructions are not received within 10 business days after submitting the report, the contractor has authority to transfer GFM automatically as long as any required corrections are made once instructions are provided. This CDRL is not required if the Refurbishment Contract Close-Out option is exercised for a given Task Order period of performance, and will be replaced by a different CDRL.

Not Listed

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB NO. 0704-D188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.

B. Exhibit: AW
C. Category:

TDP |_| TM |_| OTHER |_|

D. System/Item:

Stryker Family of Vehicles

E. Contract/Pr No.

F. Contractor:

General Dynamics Land Systems, Inc. (GDLS)

1. Data Item No.: B014

2. Title of Data Item:

Transfer of GFM

3. Subtitle:

17. Price Group:

4. Authority (Data Acquisition Document No.):

STD FORM 1428

5. Contract Reference:

H.8.5.2

6. Requiring Office:

PM SBCT

18. Estimated Total Price:

7. DD 250 Req:

LT

9. Dist. Statement Required:

B

10. Frequency:

See Item 16

12. Date of First Submission:

15 days prior to end of DO/Contract POP

14. Distribution

8. APP Code:

11. As of Date:

N/A

13. Date of Subsequent Submission:

N/A

a. Addressee:

b. Copies:

Draft
Final
Reg
Repro

16. Remarks:

Block 4: DI-MGMT-80920, Block 10, Paragraph 10.2 is tailored as follows:

Fifteen (15) days prior to each Task Order PoP completion date, the contractor shall deliver a report. The Government will review each report and provide disposition instructions within ten (10) days of receipt*. If any changes to the report are required, the contractor shall revise the report according to the Governments disposition instructions and submit a final report five (5) days after receipt of disposition instructions.

*Timely disposition instructions are imperative to contract performance. Authorization for the transfer of items between contracts or between delivery/task orders may be initially issued bye the Government via Contracting Officer (PCO) letters in order to expdite the process. If disposition is not received by the contractor within 10 business days after receipt of this data deliverable, the contractor has the authority to furnish forward automatically, as long as the proper corrections can be made and are made after the Government provides official disposition.

If the Refurb Contract Close-Out option is exercised in any of the Task Order period of performances, this CDRL B014 is not required and will be replaced with CDRL B008."

https://gcscdrl.tacom.army.mil/ext

1
15. TOTAL

H. Date:

02 May 2016

1

G. Prepared By:

Donnie Kluck H. Date:

02 May 2016

J. Date:

DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages

File details come from the government source that posted it. Updated .