B009 - Engineering Change Accomplishment Record
35 KB Posted
- Solicitation number
- W56HZV-18-R-0048
About this file
This document contains a Contract Data Requirements List and related federal contract opportunity notice. The Contract Data Requirements List outlines reporting requirements for General Dynamics Land Systems to provide the US Army quarterly Engineering Change Accomplishment Records during the performance of a requirements contract for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. The five-year requirements contract is anticipated to be sole sourced to General Dynamics Land Systems, with a forecasted quote due date of September 30, 2018. The opportunity notice specifies the contracting office is the US Army Contracting Command, Warren, Michigan.
Not Listed
Text of this file
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB NO. 0704-D188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.
B. Exhibit: AJ
C. Category:
TDP |_| TM |_| OTHER |_|
D. System/Item:
Stryker Family of Vehicles
E. Contract/Pr No.
F. Contractor:
GDLS
1. Data Item No.:
B009
2. Title of Data Item:
Engineering Change Accomplishment Record (ECAR)
3. Subtitle:
ECAR
17. Price Group:
4. Authority (Data Acquisition Document No.):
DI-ILSS-81251 /T
5. Contract Reference:
C.11.10.11.6
6. Requiring Office:
PMO SBCT
18. Estimated Total Price:
7. DD 250 Req:
NA
9. Dist. Statement Required:
D
10. Frequency:
Quarterly
12. Date of First Submission:
15 days after 1st Quarter
14. Distribution
8. APP Code:
N/A
11. As of Date:
End of the quarter
13. Date of Subsequent Submission:
15 days after start of quarter
a. Addressee:
b. Copies:
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
BLK #: DI-ILSS-81251 is tailored as follows:
Replace section 10.1 – 10.3 with The contractor shall deliver in electronic format compatible with Microsoft Word, Powerpoint, Excel and or Adobe Acrobat.
Paragraph 10.1: The following sentence is hereby added: “Shortage parts for separate Refurb operations shall be segregated or identified separately. Each submission shall identify the contract number which parts are consumed or repaired under.”
Paragraph 10.2: Deleted and replaced with the following: “This report shall contain a cumulative record of all shortage parts installed on vehicles. Each report shall include, at a minimum, the following information:
-Vehicle Serial Number
- Registration
- Hours
- Miles - End Shortage Item (Part #) -Part Description
- Installed Date -Completed by
- Shortage Created Date -Inspected by
- Government Approved Date https://gcscdrl.tacom.army.mil/ext
| 1 |
| 15. TOTAL |
| 11 |
G. Prepared By:
Donnie Kluck H. Date:
25 Jan 2018 I. Approved By:
Donnie Kluck
J. Date:
25 Jan 2018
DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .