B005 - ICVD Turret and Weapon Training Instructions.doc

DOC document 135 KB Posted

Attached to
Stryker Retrofit, Damage Repair, Reset/Refurbishment Services
Solicitation number
W56HZV-18-R-0048
Issued by

About this file

This document contains a Contract Data Requirements List and related federal contract opportunity notice. The Contract Data Requirements List requires the contractor, General Dynamics Land Systems, to provide training materials, work instructions, and facility set-up plans to enable the US Government to establish repair processes for components of the Stryker ICVD turret and 30mm cannon. The contractor must submit the required data within 180 days of an award for the first ICVD vehicle delivery order. The related federal contract opportunity is a planned sole source, non-commercial Request for Proposal from the US Army Contracting Command for a five-year requirements contract for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. The requirement is source controlled to General Dynamics Land Systems, with a forecasted quote due date of September 30, 2018.

Not Listed

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB NO. 0704-D188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.

B. Exhibit: FC

C. Category:

TDP FORMCHECKBOX

TM FORMCHECKBOX

OTHER FORMCHECKBOX

D. System/Item:

STRYKER FAMILY OF VEHICLES

E. Contract/Pr No.

W56HZV-18-R-0048

F. Contractor:

GDLS DEFENSE GROUP LLC

1. Data Item No.:

B005

2. Title of Data Item:

ICVD Turret & Weapon Components Training & Instructions

3. Subtitle:

FY19-23 STRYKER RESET REFURB PROGRAM

17. Price Group:

4. Authority (Data Acquisition Document No.):

DI-MISC-81321(T)

5. Contract Reference:

C.11.10.9.2

6. Requiring Office:

PMO-SBCT

18. Estimated Total Price:

7. DD 250 Req:

No

9. Dist. Statement Required:

10. D

11. Frequency:

Once

12. Date of First Submission:

180 Days after delivery order with ICVD vehs

14. Distribution

8. APP Code:

11. As of Date:

Upon award of first ICVD vehicle

13. Date of Subsequent Submission:

N/A

a. Addressee:

b. Copies:

Draft
Final
Reg
Repro

16. Remarks:

Disregard sections 10.3 and 10.3.1 of the Data Item Description DI-MISC-81321.

The Contractor shall provide the training materials, work instructions, and facility set up plans that enable the USG to establish vendor repair processes for the ICVD turret, and the weapon components of the XM813 30mm cannon associated with the Stryker ICVD vehicle, for the components listed in Attachment 0015, Specified Components Inspection and Repairs. The training materials, work instructions, and facility set up plans shall be provided with unlimited rights to the USG.

https://gcscdrl.tacom.army.
1
1
15. TOTAL
6
6

G. Prepared By:

Gerard Pokorski H. Date:

17 Sep 2018 I. Approved By:

Mike Alsip J. Date:

TBD

DD Form 1423-1, JUN 90 (EF) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages

PAGE

File details come from the government source that posted it. Updated .