This document provides visual acceptance criteria for Stryker BCT Level A integral armour modules that have experienced damage. It defines three types of damage - light cosmetic, light structural, and heavy structural. Light cosmetic damage involves worn paint and light scuffs that are acceptable to use as-is for battle damage repair and reset. Light structural damage involves tears in the first ballistic fabric layer up to 12 square inches that are acceptable to use as-is for battle damage repair if no spares are available, but should be repaired as soon as possible. Heavy structural damage involves damage to ceramic elements, field repairs, or fabric tears over 12 square inches, and modules with this level of damage must be discarded. Accompanying exhibits provide visual examples to aid in determining damage levels.

The related federal contract opportunity notice indicates the US Army Contracting Command plans to issue a sole source RFP for a 5-year requirements contract to General Dynamics Land Systems for Stryker vehicle retrofit, reset/refurbishment, and damage repair services. The forecasted quote due date is September 30, 2018. The requirement is source controlled to General Dynamics Land Systems.

Attachment 0010

View the file

Other files

File Type Posted
A013- Hazardous Materials Management Program Report.docx DOCX document
Attachment_0036_GDLS-C_Field_Weld_Repair_Procedure_F-4000_Rev_L.pdf PDF
New_Compressed_(zipped)_Folder.zip ZIP file
Attachment_0027_-_FSRR_Repair_Tasks.docx DOCX document
B002 - Technical Inspection —
Attachment_0032_-_Double_V_Hull_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
Attachment_0037_-_DVH_StrykerTire_Criteria_MI-_BCT-0105_REV_B__6_June_2013.pdf PDF
Attachment_0005_-_EIA_649-1_Tailoring.docx DOCX document
Attachment_0022_-_Program_of_Instruction_(POI)_for_Bench_Stock_-_14SEPT2....docx DOCX document
B017 - Forecast of FY19-24 - 14SEPT2016.docx DOCX document
Attachment_0034_-_D17000_Recorded_Joint_Welding_Procedure.docx DOCX document
A009 - RFV.DOCX DOCX document
Attachment_0013_-_Mandatory_Replacement_Parts_-_05JAN2018.xlsx XLSX spreadsheet
R001 - Property Accountability Reporting.docx DOCX document
B011 - Consumed Items Report - 25JAN2018.doc DOC document
Attachment_0019_-_Reset-Refurb_Kit_Determination_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0018_-_ANAD_Reset-Refurb_Closeout_Disposition_Instructions_-_....xlsx XLSX spreadsheet
Attachment_0029_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
B006 - Refurbishment Order of March —
A006 - Funds and Man-Hours Expenditure Report.docx DOCX document
Attachment_0020_-_ANAD_Reset-Refurb_Closeout_Timeline_-_14SEPT2016.docx DOCX document
Attachment_0009_-_Government_Furnished_List_(GFX)_-_14SEPT2016.xlsx XLSX spreadsheet
Attachment_0004_-_Stryker_STS_HMMP_Plan.docx DOCX document
B003- 6.0 Driveline and C9 FUPP training instructions.doc DOC document
A004 - AT Level 1 Training.docx DOCX document
Attachment_0025_-_Labor_Split_For_Reset-Refurb_at_ANAD_-_05JAN2018.xlsx XLSX spreadsheet
S002 - DVHA1 Repair Weldments and Fixture Drawings.doc DOC document
Attachment_0030_-_Crash_Damage_Closeout_Disposition_Instructions_-_18JAN....xlsx XLSX spreadsheet
Attachment_0002_-_Retrofit_Install_Tasks.xlsx XLSX spreadsheet
Attachment_0038_-_3126_FUPP_Technical_Inspection_Rev_1_(003).pdf PDF
Attachment_0001_-_Scheduled_Government_Furnished_Property.xlsx XLSX spreadsheet
A002 - CSDR Flexfile.doc DOC document
B001 - Removed Deployment Kit Inventories - 03MAR2018.docx DOCX document
Attachment_0021_-_Bench_Stock_Management_Plan_-_14SEPT2016.docx DOCX document
A010 - RDT.DOC DOC document
A001 - OPSEC Awareness Training Report.docx DOCX document
Attachment_0003_-_PM_SBCT_OPSEC_Plan.pdf PDF
Attachment_0015_-_Specified_Components_Inspection_and_Repairs__-_13FEB20....xlsx XLSX spreadsheet
Attachment_0012__-_Removal_of_BFT_and_OSRVT_Components_-_16MAY13.pdf PDF
S001 Structural Repair Instructions.docx DOCX document
Attachment_0031_-_Flat_Bottom_Stryker_Corrosion_inspection_check_list.xlsx XLSX spreadsheet
S006 Consumed Items Report.doc DOC document
Attachment_0016_-_Customer_Support_Form_-_Jan_2018.xlsx XLSX spreadsheet
S009 Final Acceptance Report.docx DOCX document
A0014 - RFV.DOCX DOCX document
Attachment_0028_-_Retrofit_and_Repair_CSDR_Plan.pdf PDF
B016 - Technical Inspection —
A008 - PLER.DOC DOC document
Attachment_0011_-_FY19-24_Stryker_Technical_Inspection_-_16JAN2018.xlsx XLSX spreadsheet
A007 - MRR.DOCX DOCX document
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION STATEMENT D:

Distribution authorized to the Department of Defense andU.S. DoD contractors only by specific authority of AR 380-5. Date of determination is 18 May 2009. Other requests for this document shall be referred to the Project Manager, STRYKER Brigade Combat Team, (PM SBCT), ATTN:

SFAE-GCS-SBCT (Security Office), MS 325, Warren, MI 48397-5000.

Document Subject to Distribution Statement D

Rev. A Date: 9 September, 2010

GENERAL DYNAMICS LAND SYSTEMS - CANADA

PRODUCT ASSURANCE DIRECTIVE 66 - STRYKER BCT LEVEL A INTEGRAL ARMOUR

ACCEPTANCE CRITERIA - BATTLE DAMAGE / RESET VEHICLES ONLY

1.0 PURPOSE:

The purpose of this procedure is to provide visual acceptance criteria to determine whether the Stryker BCT Level A Integral Armour tiles that have experienced some damage are still acceptable for use or need to be replaced.

2.0 SCOPE:

This procedure applies to Stryker BCT Reset and Battle damaged vehicle repairs only.

This procedure does NOT apply to Stryker BCT Production armour modules I vehicles.

3.0 RESPONSIBILITY/AUTHORITY

Engineering Design and Development Systems Survivability Engineering has defined this visual acceptance criteria.

4.0 REFERENCES:

Product Assurance Directive 32 - VISUAL ACCEPTANCE CRITERIA FOR INTEGRAL

LEVEL A ARMOUR MODULES

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and DOD contractors only, per the STRYKER Security Classification Guide and Program Protection Plan.

Date of determination is 27 March 2003. Other requests for this document shall be referred to Project Manager Brigade Combat Team, ATTN: SFAE-GCS-BCT, DSN 786-2000 or Commercial 586 753-2000.

5.0 DEFINITIONS:

SBCT - Stryker Brigade Combat Team

Title: ED&D Systems - Survivability Engineering Area Manager, Survivability

Approval: ~c..·i ~ , Title: SB~a , Reset

Approval~..... Date: 2010-09-09 Approval:~~,,-::~~~r Date: 2010-09-09

UNCONTROLLED DOCUMENT - REFER TO ON-LINE VERSION

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Lev A Acceptance Criteria Rev A - Battle Damage-Reset ONLY.doc

ACCEPTANCE CRITERIA - BATTLE DAMAGE I RESET VEHICLES ONLY

6.0DESCRIPTION:
6.1As a general rule if inspected armour module(s) exhibits multiple hits/cuts in

outer covering from shrapnel damage, they should be immediately rejected. This should be evaluated on a case-by-case basis for size and quantity of hits per module size to determine disposition.

6.2 This document will distinguish between 3 types of service damage encountered on composite armour modules:

1. light Cosmetic: The paint is worn off with or without light scuffs on the ballistic fabric, but there are no tears or pieces missing in the first ballistic fabric layer. Disposition should be use as is for battle damage repair (serviceable), and re-paint on reset.

2. light Structural: Tears in the first ballistic fabric layers not exceeding 12 square inches of total area, and where maximum exposed ceramic surface does not exceed 3.5"X3.5" in at any point. Ceramic element can be visible but must be undamaged. The disposition should be use as is for battle damage repair if no spares are available and vehicle is urgently needed (module is serviceable in a ballistic sense but has limited resistance to the elements and will degrade much faster than a new or repaired module.) The modules should be returned to the armour supplier and repaired per contract approved procedure with steel epoxy and repainted as soon as possible.

3 . Heavy Structural: Damage to the ceramic elements (gouges/chips) or field repair of any kind (per 6.3). Tears in the fabric layer exceeding 12 square inches in area or with openings showing ceramic tile larger than 3.5"X3.5". These modules should be discarded.

6.3 If the inspected armour module demonstrates any evidence of a previous field applied patch repair such as :

•Putties
•Adhesives
•Fillers

The damage is considered heavy structural damage, and the disposition must be

UNACCEPTABLE (DISCARD).

6.4 If there is any doubt of a module condition of acceptability after review of the damage using the enclosed inspection criteria, then the disposition must be

UNACCEPTABLE (DISCARD).

6.5 Notify reset quality assurance for additional guidelines or final disposition of suspect module(s).

UNCONTROLLED DOCUMENT - REFER TO ON-LINE VERSION

G:\SEM\Survivability\Armour\Spail Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

Table 1. Visual Acceptance Criteria for Armour Modules Exhibiting Field Damage

Measurements # Appearance Attribute Instrumentation I Type of damage Disposition Exhibit

Procedure Gouges in aluminum nose

1 Visual evaluation Heavy Structural Discard AJ)lates

Cracks in exposed ceramic

2 Visual evaluation Heavy Structural Discard Binternal components

3 Field applied patches Visual evaluation Heavy Structural Discard C

Any quantity of field applied 4 Visual evaluation Heavy Structural Discard Dfiller material

Scuffs and abrasions to Acceptable for

5 Visual evaluation Light Cosmetic Eouter coverings reworklrepair**

Cuts* through the outer covering and exposed Acceptable for

6 Visual evaluation Light Structural Fceramics not exhibiting reworklrepair*** damage

Acceptable for 7 Tire abrasion, light Visual evaluation Light Cosmetic Greworklrepai r**

8 Tire abrasion, heavy* Visual evaluation Heavy Structural Discard H

* Tears/cuts must not exceed 12 square inches in area, and have openings no larger than 3.5"X3.5".

** Module may be used as is for battle damage repair, should be repainted on reset.

*** Module is serviceable for use to support urgent needs, but should be returned to the armour supplier and repaired per contract approved procedure as soon as possible.

UNCONTROLLED DOCUMENT - REFER TO ON-LINE VERSION

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

EXHIBIT A - GOUGES IN ALUMINUM NOSE PLATES

A1 - GOUGES IN ALUMINUM NOSE PLATES OVER CERAMIC ARMOUR

UNACCEPTABLE

UNCONTROLLED DOCUMENT - REFER TO ON-LINE VERSION

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

EXHIBIT B - CRACKS IN EXPOSED CERAMIC INTERNAL COMPONENTS

B1 - UNACCEPTABLE

UNCONTROLLED DOCUMENT - REFER TO ON-LINE VERSION

G:\SEM\Survivability\Armour\Spail Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev A - Battle Damage-Reset ONL y'doc

B2 - UNACCEPTABLE

G:\SEM\Survivability\Armour\Spali Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

EXHIBIT C - FIELD APPLIED PATCHES

C1 - UNACCEPTABLE

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev A - Battle Damage-Reset ONL V.doc

EXHIBIT D - ANY QUANTITY OF FIELD APPLIED FILLER MATERIAL

D1 - UNACCEPTABLE

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev A - Battle Damage-Reset ONL Y.doc

EXHIBIT E - SCUFFS AND ABRASIONS TO OUTER COVERINGS

E1 - ACCEPTABLE

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

E2 - ACCEPTABLE

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

EXHIBIT F - CUTS THROUGH THE OUTER COVERING AND EXPOSED CERAMICS NOT

EXHIBITING DAMAGE

F1 - ACCEPTABLE

F2 - ACCEPTABLE

G:\SEM\Survivability\Armour\Spail Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

EXHIBIT F - CUTS THROUGH THE OUTER COVERING AND EXPOSED CERAMICS NOT

EXHIBITING DAMAGE (CONTINUED)

F3 - ACCEPTABLE

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

EXHIBIT G - TIRE ABRASION, LIGHT

G1 - ACCEPTABLE

G:\SEM\Survivability\Armour\Spall Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

G2 - UNACCEPTABLE (AREA EXCEEDED)

G:\SEM\Survivability\Armour\Spail Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev

7.0 RECORDS

N/A

8.0 ATTACHMENTS:

N/A

9.0 REVISION HISTORY

Date Revision Comments Revised By

Level

2010-05-31 NR INITIAL RELEASE Stewart Loy, Systems Survivability Engineering

2010-08-31 A CRITERIA REFINED, PICTURES Marco Tatta

ADDED Survivability Engineering

"DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and DOD contractors only, per the STRYKER Security Classification Guide and Program Protection Plan. Date of determination is 27 March 2003. Other requests for this document shall be referred to Project Manager Brigade Combat Team, ATTN: SFAE-GCS-BCT, DSN 786-2000 or Commercial 586-753 2000."

UNCONTROLLED DOCUMENT - REFER TO ON-LINE VERSION

G:\SEM\Survivability\Armour\Spail Liner Acceptance Criteria\Directive 66 - SBCT Level A Acceptance Criteria Rev