Attachment_0006__DD1692_-_ENGINEERING_CHANGE_PROPOSAL_(ECP).pdf

PDF 31 KB Posted

Attached to
60mm, 81mm, 120mm Mortar Propelling Charges
Solicitation number
W52P1J-16-R-0134
Issued by

About this file

Attachment 0006 DD1692 - ENGINEERING CHANGE PROPOSAL (ECP)

View the file

Other files

File Type Posted
Attachment_0031__MINIMUM_GUARANTEED_AMOUNT_FOR_60_81_120MM_MORTAR_PROPELLING_CHARGES.pdf PDF
Attachment_0032__SCHEDULE.pdf PDF
Solicitation_W52P1J-16-R-0134_Amendment_0005.pdf PDF
RFP_W52P1J-16-R-0134_Amendment_0004.pdf PDF
RFP_W52P1J-16-R-0134_Amendment_0003.pdf PDF
RFP_W52P1J-16-R-0134_Amendment_0002.pdf PDF
RFP_W52P1J-16-R-0134_Amendment_0001.pdf PDF
Attachment_0020__52.246-4520_DRAWING_NUMBER_LISTING.PDF PDF
Attachment_0019__52.246-4520_END_ITEM_COMPONENT_LISTING.PDF PDF
Attachment_0020__52.246-4520_DRAWING_NUMBER_LISTING.PDF PDF
Attachment_0019__52.246-4520_END_ITEM_COMPONENT_LISTING.PDF PDF
Request_for_Proposal_(RFP)_W52P1J-16-R-0134_Amendment_0001.pdf PDF
Attachment_0001__PRICE_MATRIX.xlsx XLSX spreadsheet
Attachment_0011__ASC_FORM_715-7_-_HAZARDOUS_MATERIAL_FORM.pdf PDF
Attachment_0021__RECOMMENDATION_FOR_CHARGE_ESTABLISHMENT_&_UNIFORMITY_CALCULATIONS.pdf PDF
Attachment_0008__DD1695_-_NOTICE_OF_REVISION_(NOR).pdf PDF
Attachment_0017__SECURITY_STATEMENT_OF_WORK_-_PHYSICAL_SECURITY_STANDARDS_FOR_DOD_SECURITY_RISK_CATEGORY_III_IV_AMMUNITION_AND_EXPLOSIVES_(A&E)_AT_COCO_FACILITIES.pdf PDF
Attachment_0013__GUIDANCE_ON_DOCUMENTATION_OF_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL).pdf PDF
Attachment_0012__INSTRUCTIONS_FOR_COMPLETING_FORM_1423.pdf PDF
Attachment_0005__ADDRESS_LIST.pdf PDF
Attachment_0020__52.246-4520_DRAWING_NUMBER_LISTING.pdf PDF
Exhibit_F__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_81MM_M220_PROPELLING_CHARGE.pdf PDF
Attachment_0009__U.S._GOVERNMENT_POINT_OF_CONTACT_LISTING.pdf PDF
Attachment_0003__OPSEC_AQUISITION_PLAN.pdf PDF
Exhibit_G__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_120MM_M234A1_PROPELLING_CHARGE.pdf PDF
Exhibit_E__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_81MM_M219_PROPELLING_CHARGE.pdf PDF
Attachment_0019__52.246-4520_END_ITEM_COMPONENT_LISTING.pdf PDF
RFP_W52P1J-16-R-0134.pdf PDF
Exhibit_B__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_60MM_M235_PROPELLING_CHARGE.pdf PDF
Exhibit_D__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_81MM_M218_PROPELLING_CHARGE.pdf PDF
Attachment_0007__DD1694_-_REQUEST_FOR_VARIANCE_(RFV).pdf PDF
Attachment_0018__STATEMENT_OF_WORK_FOR_INERT_PROPELLING_CHARGES.pdf PDF
Attachment_0002__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Attachment_0010__STATISTICAL_PROCESS_CONTROL_(SPC)_TABLES.pdf PDF
Exhibit_C__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_60MM_M236_PROPELLING_CHARGE.pdf PDF
Exhibit_A__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_60MM_M204_PROPELLING_CHARGE.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20. NEED FOR CHANGE

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 1

PREVIOUS EDITION MAY BE USED.

7. PRIORITY

9. BASELINE AFFECTED

4. ORIGINATOR

d. ECP NO. e. TYPE f. REV

a. MODEL/TYPE

8. ECP DESIGNATION

b. CAGE CODE c. SYSTEM DESIGNATION

6. JUST. CODE

5. CLASS OF ECP

10. OTHER SYS./CONFIG. ITEMS AFFECTED

3. DODAAC

1. DATE (YYYYMMDD) Form Approved OMB No. 0704-0188

a. RECOMMENDED ITEM EFFECTIVITY

c. ESTIMATED KIT DELIVERY SCHEDULE

b. SHIP/VEHICLE CLASS AFFECTED

d. LOCATIONS OR SHIP/VEHICLE NUMBERS AFFECTED

a. SYSTEM

b. DEVELOPMENT

c. PRODUCT

11. SPECIFICATIONS AFFECTED 12. DRAWINGS AFFECTED

14. CONTRACT NO. AND LINE ITEM

13. TITLE OF CHANGE

b. CODE c. TELEPHONE NO.

a. NAME (First, Middle Initial, Last)

a. NOMENCLATURE b. PART NO. c. NSN

16. CONFIGURATION ITEM NOMENCLATURE

18. ALL LOWER LEVEL ITEMS AFFECTED

17. IN PRODUCTION

21. PRODUCTION EFFECTIVITY BY SERIAL NUMBER 22. EFFECT ON PRODUCTION DELIVERY SCHEDULE

19. DESCRIPTION OF CHANGE

23. RETROFIT

h. GOVERNMENT ACTIVITY

d. GOVERNMENT ACTIVITY

i. SIGNATURE

e. SIGNATURE

j. DATE SIGNED (YYYYMMDD)

f. DATE SIGNED (YYYYMMDD)

27. APPROVAL/DISAPPROVAL

YES NO

2. PROCURING

ACTIVITY NO.

a. TYPED NAME (First, Middle Initial, Last)

FUNCTIONAL

ALLOCATED

PRODUCT

YES NO

b. ADDRESS (Street, City, State, Zip Code)

CAGE Code Specification/Document No. Rev. SCN CAGE Code Number Rev. NOR

15. PROCURING CONTRACTING OFFICER

24. ESTIMATED COSTS/SAVINGS UNDER CONTRACT

26. SUBMITTING ACTIVITY

25. ESTIMATED NET TOTAL COSTS/SAVINGS

a. AUTHORIZED SIGNATURE

b. TITLE

a. CLASS I b. CLASS II c. CLASS II

APPROVAL

RECOMMENDED

DISAPPROVAL

RECOMMENDED APPROVED DISAPPROVED

CONCUR IN CLASSIFI-

CATION OF CHANGE

DO NOT CONCUR IN CLASSI-

FICATION OF CHANGE

APPROVED

DISAPPROVED

g. APPROVAL

DD FORM 1692, AUG 96 (EG)

The public reporting burden for this collection of information is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE GOVERNMENT ISSUING CONTRACTING OFFICER FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED IN ITEM 2 OF THIS FORM.

Designed using Perform Pro, WHS/DIOR, Aug 96

Attachment 0006

1_DATE_YYYYMMDD:
FillText13:
3_DODAAC:
a_TYPED_NAME_First_Middle:
b_ADDRESS_Street_City_Sta:
5_CLASS_OF_ECP:
6_JUST_CODE:
7_PRIORITY:
a_MODELTYPE:
b_CAGE_CODE:
c_SYSTEM_DESIGNATION:
d_ECP_NO:
e_TYPE:
f_REV:
functional:
allocated:
product:
yesother:
noother:
CAGE_Code:
SpecificationDocument_No:
Rev1:
SCIA1:
CAGE_Code2:
SpecificationDocument_No1:
Rev3:
SCIA2:
CAGE_Code4:
SpecificationDocument_No2:
Rev5:
SCIA3:
CAGE_Code1:
Number1:
Rev2:
NOR1:
CAGE_Code3:
Number2:
Rev4:
NOR2:
CAGE_Code5:
Number3:
Rev6:
NOR3:
13_TITLE_OF_CHANGE:
14_CONTRACT_NO_AND_LINE_I:
a_NAME_First_Middle_Initi:
b_CODE:
c_TELEPHONE_NO:
16_CONFIGURATION_ITEM_NOM:
YESPROD:
NOPROD:
a_NOMENCLATURE:
b_PART_NO:
c_NSN:
19_DESCRIPTION_OF_CHANGE:
20_NEED_FOR_CHANGE:
21_PRODUCTION_EFFECTIVITY:
22_EFFECT_ON_PRODUCTION_D:
a_RECOMMENDED_ITEM_EFFECT:
b_SHIPVEHICLE_CLASS_AFFEC:
c_ESTIMATED_KIT_DELIVERY:
d_LOCATIONS_OR_SHIPVEHICL:
24_ESTIMATED_COSTSSAVINGS:
25_ESTIMATED_NET_TOTAL_CO:
b_TITLE:
d_GOVERNMENT_ACTIVITY:
f_DATE_SIGNED_YYYYMMDD:
h_GOVERNMENT_ACTIVITY:
j_DATE_SIGNED_YYYYMMDD:
apprec:
disapprec:
classIIapp:
classIIdis:
concur:
nonconcur:
app:
disapp:
11:
12:
RESET_1:
RESET:
RESET_Cancel:

File details come from the government source that posted it. Updated .