Section J-13I DD Form 1692 Engineering Change Proposal.pdf
PDF 127 KB Posted
- Solicitation number
- 70Z02326R93280004
- Issued by
- Not on record
About this file
This document is a technical error message rather than a federal contract opportunity file. The PDF file cannot be properly accessed or displayed because it requires Adobe Reader 8 or higher and the viewing environment is not properly configured. The document contains only instructions directing users to visit http://www.adobe.com/go/pdf_forms_configure for information on installing and configuring Adobe Reader. No contract information, solicitation details, requirements, timelines, or other substantive content is available in this file.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.
For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.
Page of
PREVIOUS EDITIONS ARE OBSOLETE
DD FORM 1692 (REV 01/2018)
ENGINEERING CHANGE PROPOSAL (ECP) Page 1
PREVIOUS EDITIONS ARE OBSOLETE
DD FORM 1692 (REV 01/2018)
Page of Page of
PREVIOUS EDITIONS ARE OBSOLETE
DD FORM 1692 (REV 01/2018)
5. CLASS OF ECP:
6. PRIORITY:
7. ECP TYPE:
8. JUSTIFICATION CODE:
13. PRIMARY ITEM
14. AFFECTED
ITEM(S)
d. ALTER, ADD, OR
f. REVISED
DOCUMENT
ATTACHED (Y/N)?
16. DOCUMENTS AFFECTED
a. CAGE
b. DOCUMENT NO.
c. TITLE/NOMENCLATURE/NAME d.
CURRENT
REVISION
e.
NOR
NO.
17. BASELINE AFFECTED:
18. IN PRODUCTION:
21a. COST IMPACT FROM ECP?
21b. RETROFIT EXISTING ASSETS?
22. CONTRACT
23. CONTRACTING OFFICER
24. ORIGINATOR
25. BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY
a. RECOMMENDATIONS:
26a. DISPOSITION: (Configuration Approval Authority)
27. ACTIVITY ACCOMPLISHING REVISION AND DATE OF REVISION
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 2
(For use if Block 17 is functional or allocated.)
EFFECTS ON FUNCTIONAL/ALLOCATED CONFIGURATION DOCUMENTATION
28. OTHER EXTERNAL SYSTEMS OR EXTERNAL
CONFIGURATION ITEMS AFFECTED:
29. OTHER SUPPLIERS / ACTIVITIES AFFECTED:
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3
(This page for use as necessary) (X)
EFFECTS ON ENGINEERING, SUPPORT, AND OTHER PRODUCT ATTRIBUTES
FACTOR
ENCL.
PAR.
(X)
FACTOR
ENCL.
PAR.
37. EFFECT ON SYSTEMS ENGINEERING DESIGN CONSIDERATIONS
38. EFFECT ON INTEGRATED PRODUCT SUPPORT ELEMENTS
g. Demilitarization & Disposal
f. Critical Safety Item (CSI)
e. Corrosion Prevention and Control
d. Commercial-Off-the-Shelf (COTS)
c. Anti-Counterfeiting
b. Affordability
a. Accessibility
m. Interoperability & Dependency
l. Intelligence
k. Insensitive Munitions
j. Human Systems Integration (HSI)
i. Environment, Safety, and Occupational Health (ESOH)
h. Diminishing Manufacturing Sources & Material Shortages (DMSMS)
v. System Security Engineering
w. Electromagnetic Interference
u. Survivability
t. Standardization
s. Spectrum Management
r. Reliability & Maintainability (R&M)
q. PHS&T
p. Operational Energy
o. Open Systems Architecture (OSA)
n. Item Unique Identification (IUID)
39. EFFECT ON OTHER PRODUCT ATTRIBUTES
f. Packaging, Handling, Storage, and Transportation (PHS&T)
e. Maintenance Planning & Mgmt
d. Supply Support
c. Sustaining Engineering
b. Design Interface
a. Product Support Management
l. Computer Resources
k. Facilities & Infrastructure
j. Manpower & Personnel
i. Training & Training Support
h. Support Equipment
g. Technical Data
g. Warranty/Guarantee
f. Other Equipment
e. Activation/Deployment Schedule
d. Operating Procedures
c. Service Life
b. Certifications
a. Performance
43. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS
45a. THIS CHANGE IS TO BE ACCOMPLISHED:
46. IS SUPPLIER FIELD SERVICE ENGINEERING REQUIRED?
49. DATE ACQUIRER APPROVAL NEEDED FOR: (DD Mmm YYYY)
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 4
(This page for use as necessary)
ESTIMATED NET TOTAL COST IMPACT
50. ESTIMATED NET TOTAL COST IMPACT (Use parentheses for savings)
FACTOR
COSTS/SAVINGS UNDER CONTRACT
Non-Recurring (a)
RECURRING
Unit (b) Quantity (c) Total (Recurring) (d) Total (e) Other Costs/ Savings to the Acquirer (f)
a. PRODUCTION COSTS / SAVINGS
(1) CONFIGURATION ITEM / CSCI
(2) FACTORY TEST EQUIPMENT
(3) SPECIAL FACTORY TOOLING
(4) SCRAP
(5) ENGINEERING, ENGINEERING DATA REVISION
(6) REVISION OF TEST PROCEDURES
(7) QUALIFICATION OF NEW ITEMS
(8) SUBTOTAL OF PROD COSTS/SAVINGS
b. RETROFIT COSTS
(1) ENGINEERING DATA REVISION
(2) PROTOTYPE TESTING
(3) KIT PROOF TESTING
(4) RETROFIT KITS FOR OPERATIONS SYSTEMS
(5) PREP OF MWO / TCTO / SC / ALT / TD
(6) SPECIAL TOOLING FOR RETROFIT
(7) INSTALLATION - SUPPLIER PERSONNEL
(8) INSTALLATION - ACQUIRER PERSONNEL
(9) TESTING AFTER RETROFIT
(10) MODIFICATION OF GFE/GFP
(11) QUALIFICATION OF GFE/GFP
(12) SUBTOTAL OF RETROFIT COSTS/SAVINGS
c. INTEGRATED PRODUCT SUPPORT COSTS
(1) PRODUCT SUPPORT MANAGEMENT
(2) DESIGN INTERFACE
(3) SUSTAINING ENGINEERING
(4) SUPPLY SUPPORT
(5) MAINTENANCE PLANNING & MANAGEMENT
(6) PACKAGING, HANDLING, STORAGE &
TRANSPORTATION (PHS&T)
(7) TECHNICAL DATA
(8) SUPPORT EQUIPMENT
(9) TRAINING & TRAINING SUPPORT
(10) MANPOWER & PERSONNEL
(11) FACILITIES & INFRASTRUCTURE
(12) COMPUTER RESOURCES
(13) OTHER
(14) SUBTOTAL OF IPS COSTS/SAVINGS
d. OTHER COSTS / SAVINGS
e. SUBTOTAL COSTS / SAVINGS
(1) SUBTOTAL UNDER CONTRACT
f. COORDINATION OF CHANGES WITH OTHER SUPPLIERS
g. COORDINATION CHANGES BY ACQUIRER
h. ESTIMATED NET TOTAL COSTS/SAVINGS
ENGINEERING CHANGE PROPOSAL(ECP), PAGE 5
(This page for use as necessary) ESTIMATED COSTS/SAVINGS SUMMARY, RELATED ECPs
51. ESTIMATED COSTS / SAVINGS SUMMARY, RELATED ECPs (Use parentheses for savings)
CAGE CODE
(a)
ECP NUMBER
(b)
COSTS/SAVINGS
UNDER CONTRACTS
(c)
OTHER
COSTS/SAVINGS
TO ACQUIRER
(d)
a. PRODUCTION COSTS / SAVINGS (Subtotal of Costs /Savings Elements from Page 4, 50a. applicable to aircraft, ship, tank, vehicle, missile or its subsystem)
(1) SUBTOTAL PRODUCTION COSTS / SAVINGS
b. RETROFIT COSTS (Applicable to aircraft, ship tank, vehicle, missile or its subsystem)
(1) SUBTOTAL RETROFIT COSTS
c. INTEGRATED PRODUCT SUPPORT
COSTS/SAVINGS REVISED REQUIREMENTS
(1) ITEM RETROFIT (If not covered under "b") (Applicable to aircraft, ship, tank, missile or its subsystem)
(2) IPS SUBTOTAL (Applicable to aircraft, ship tank, mission or its subsystem)
(3) OPERATOR TRAINER (Net total cost/savings from each ECP covering Operator trainer)
(4) MAINTENANCE TRAINER (Net total cost/savings from each ECP covering maintenance trainer)
(5) OTHER TRAINING EQUIPMENT
(6) SUPPORT EQUIPMENT (Net total cost/savings from each ECP on support equipment)
(7) IPS PLANS
(8) MAINTENANCE CONCEPT, PLANS, SYSTEM
DOCUMENTS
(9) INTERIM SUPPORT PLAN
NEW REQUIREMENTS
CAGE
CODE
NON-
RECURRING
COSTS
RECURRING COSTS
UNIT
QTY
TOTAL
(10) PROVISIONING DOCUMENTATION
(11) OPER TRNR/TRNG DEVICES/EQUIP
(12) MANUALS/SPARES, REPAIR PARTS
(For (11))
(13) MAINTENANCE TRNR/TRNG DEVICES/
EQUIPMENT
(14) MANUALS/SPARES, REPAIR PARTS
(for (13))
(15) SUPPORT EQUIPMENT
(16) MANUALS (for (15))
(17) PROVISIONING DOCUMENTATION (For (15))
(18) REPAIR PARTS (for (15))
(19) SUBTOTAL FOR IPS COSTS / SAVINGS
(Sum of 51C (1) through (18))
d. OTHER COSTS / SAVINGS (Total from Page 4, 50d., or related ECPs)
CAGE CODE
ECP NUMBER
(1) TOTAL OTHER COSTS / SAVINGS
(2) SUBTOTALS OF COLUMNS (A + B + C + D)
(3) SUBTOTAL UNDER CONTRACT
e. ESTIMATED NET TOTAL COSTS / SAVINGS
ENGINEERING CHANGE PROPOSAL (ECP) (HARDWARE), PAGE 6
(This page for use as necessary)
55. DATE AUTHORIZATION TO PROCEED
RECEIVED BY SUPPLIER (DD Mmm YYYY) INDICATE START DELIVERY WITH AN "S", COMPLETION DELIVERY WITH A "C", PROGRESS POINT WITH A "P".
NO. OF MONTHS
a. CONFIGURATION ITEM
(1) Production
(2) Tech Manuals
(3) Retrofit
(4) MWO/TCTO/SC/ALT/TD
(5) Spares/Repair Parts
b. SUPPORT EQUIPMENT
(1) Production
(2) Tech Manuals/Prog. Tapes
(3) Retrofit
(4) MWO/TCTO/SC/ALT/TD
(5) Repair Parts
c. TRAINER
(1) Operator
(2) Maintenance
NO. OF MONTHS
ENGINEERING CHANGE PROPOSAL (ECP) (SOFTWARE), PAGE 7
(This page for use as necessary)
59. DATE AUTHORIZATION TO PROCEED
RECEIVED BY SUPPLIER (DD Mmm YYYY) INDICATE START DELIVERY WITH AN "S", COMPLETION DELIVERY WITH A "C", PROGRESS POINT WITH A "P".
NO. OF MONTHS
a. CONFIGURATION ITEM
(1) Software Engineering
(2) Software Documentation
(3) Software Replication
(4) Software Distribution (5)
b. SUPPORT EQUIPMENT
(1) Software Engineering Environment Upgrade
(2) Software Test Environment Upgrade (3)
c. TRAINER
(1) Operator
(2) Maintenance (3)
NO. OF MONTHS
11.0.1.20130826.2.901444.899636 DD Form 1692, "Engineering Change Proposal (ECP)"
| CurrentPage: |
| PageCount: |
| topRightLastUpdated: |
| Enter the date prepared using the format DD MMM YYYY.: |
| Enter ECP number.: |
| Enter ECP revision.: |
| Enter procuring activity number.: |
| Enter distribution statement.: |
| Enter Title of Change: |
| Check Major (Class I): |
| Enter Minor (Class II): |
| Check E-Emergency: |
| Check U-Urgent: |
| Check R-Routine: |
| Check P-Preliminary: |
| formal: |
| Check B-Interface: |
| Check C-Compatibility: |
| Check D-Correction of Deficiency: |
| Check O-Operational or Logic Support: |
| Check P-Production Stoppage: |
| Check R-Cost Reduction: |
| Check S-Safety: |
| Check V-Value Engineering: |
| Check A-Administrative: |
| Enter Description of Change: |
| Enter Need for change: |
| Enter top-level item name and designation: |
| Enter high-level item name and designation: |
| Enter Name and Designation : |
| Enter Part Number: |
| Enter NSN: |
| Enter Item Name and Designation: |
| Enter Part Number: |
| Enter NSN: |
| Enter Alter, Add, or Remove: |
| Enter List of External Systems or External Configuration Items Affected: |
| Enter CAGE: |
| Enter Document number: |
| Enter Title/Nomenclature/Name: |
| Enter Current Revision: |
| Enter NOR Number: |
| Enter Y or N (yes or no) for Revised Document Attached: |
| Select to remove a row.: |
| Add: |
| Check Functional: |
| Check Allocated: |
| Check Product: |
| Check Yes In Production: |
| Check No, not In Production: |
| Enter Production Effectivity (quantity, Lot Number, Serial Number, Date): |
| Enter Effect on Delivery Schedule: |
| Check No for Cost Impact From ECP : |
| Check Yes for Cost Impact From ECP: |
| If Block 21A is Yes, enter Include References: |
| Check yes for retrofit existing assets: |
| Check no for retrofit existing assets: |
| (If 21b is Yes, Enter Retrofit Effectivity Information, If 21B is No Enter N/A) : |
| If 21b is Yes, Enter Retrofit Delivery Schedule Information, If 21B is No Enter N/A) : |
| Enter Supplier: |
| Enter Contract Number/Line Item: |
| Enter Contracting Officer Name: |
| Enter Contracting Officer Telephone number: |
| Enter Contracting Officer E-mail: |
| Enter Originator Name: |
| Enter CAGE code.: |
| Enter Originator Telephone: |
| Enter Originator E-mail: |
| Enter Originator Address (street, city, state, zip code): |
| Enter Originator Submitting Activity: |
| Enter Originator Authorized Signature: |
| Enter authorizing official's Name and Title: |
| Check for approval: |
| Check for disapproval: |
| Check for approval with modification: |
| Enter Name and Title: |
| Enter the date signed using the format DD MMM YYYY.: |
| Enter Signature: |
| Enter Comments: |
| Enter Name and Title: |
| Enter the date signed using the format DD MMM YYYY.: |
| Enter Signature: |
| Enter Comments: |
| Enter Name and Title: |
| Enter the date signed using the format DD MMM YYYY.: |
| Enter Signature: |
| Select to add new attachment: |
| Select to view selected attachment: |
| Select to remove selected attachment: |
| Enter List of Attachment by clicking Add Attachment: |
| Enter other external systems or external configuratio items affected: |
| Enter other suppliers/activities affected: |
| Enter configuration items affected: |
| Enter effects on performance allocations and interfaces in system specification: |
| Enter effects on staffing, integrated logistics support, training, operational effectiveness, or software: |
| Enter effects on configuration item specifications: |
| Enter developmental requirements and status: |
| Enter trade-offs and alternative solutions: |
| Enter date by which contractual authority is needed in format DD MMM YYYY: |
| Check for Demilitarization & Disposal: |
| Check for Critical Safety Item (CSI): |
| Enter ENCL.: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Corrosion Prevention and Control: |
| Check for Commercial-Off-the-Shelf (COTS): |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for anti-counterfeiting: |
| Check for affordability: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Accessibility: |
| Check for Interoperability & Dependency: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Intelligence: |
| Check for Insensitive Munitions: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Human Systems Integration (HSI): |
| Check for : |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Diminishing Manufacturing Sources & Material Shortages (DMSMS): |
| Check for Other: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter other: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for System Security Engineering: |
| Check for Survivability: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Standardization: |
| Check for Spectrum Management: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Reliability & Maintainability (R&M): |
| Check for PHS&T: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Operational Energy: |
| Check for Open Systems Architecture (OSA): |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Item Unique Identification (IUID): |
| Check for Packaging, Handling, Storage, and Transportation (PHS&T): |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Maintenance Planning & Mgmt: |
| Check for Supply Support: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Sustaining Engineering: |
| Check for Design Interface: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Product Support Management: |
| Enter other: |
| Check for Other: |
| Check for Computer Resources: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Facilities & Infrastructure: |
| Check for Training & Training Support: |
| Check for Manpower & Personnel : |
| Enter ENCL.: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Enter ENCL.: |
| Check for Support Equipment: |
| Check for Technical Data: |
| Check for Other: |
| Enter other: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Warranty/Guarantee: |
| Check for Other Equipment: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Activation/Deployment Schedule: |
| Check for Operating Procedures: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Service Life: |
| Check for Certifications: |
| Enter ENCL.: |
| Enter PAR.: |
| Enter PAR.: |
| Enter ENCL.: |
| Check for Performance: |
| Enter PAR.: |
| Enter ENCL.: |
| Enter alternate solutions: |
| Enter developmental status: |
| Enter recommendations for retrofit: |
| Enter organization: |
| Enter iintermediate: |
| Enter depot: |
| Enter other: |
| Enter work-hours to conduct system tests after retrofit: |
| Check if this change is to be accomplished before the following changes: |
| Check if this change is to be accomplished with the following changes: |
| Check if this change is to be accomplished after the following changes: |
| Check yes, supplier field service engineering required: |
| Check no, supplier field service engineering not required: |
| Enter out of service time : |
| Enter external changes: |
| Enter effect of this ECP and previously approved ECPs on item: |
| Enter the date acquirer approval needed for retrofit using the format DD MMM YYYY.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Enter recurring costs/savings under contract quantity for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| Enter recurring costs/savings under contract unit for respective factor.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter non-recurring costs/savings under contract for respective factor.: |
| d0d: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Enter other costs/savings to the acquirer for respective factor.: |
| Automatically calculated.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| Enter costs/savings under contracts.: |
| Enter other costs/savings to acquirer.: |
| Enter other costs/savings to acquirer.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Automatically calculated.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Enter CAGE code.: |
| Enter non-recurring costs.: |
| Enter recurring costs unit.: |
| Enter recurring costs quantity.: |
| Recurring costs total is automatically calculated.: |
| Automatically calculated.: |
| Enter other costs/savings to acquirer.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| d0c: |
| Enter other costs/savings.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| dRow1c: |
| dRow1d: |
| Enter other costs/savings.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| dRow2c: |
| dRow2d: |
| Enter other costs/savings.: |
| Enter CAGE code.: |
| Enter ECP number.: |
| dRow3c: |
| dRow3d: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Automatically calculated.: |
| Enter subtotal costs/savings under contract.: |
| Enter subtotal under contract for other costs/savings to acquirer.: |
| Automatically calculated.: |
| Enter CSCI nomenclature.: |
| Enter title of change.: |
| Enter the date authorization to proceed received by supplier using the format DD MMM YYYY.: |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| rowNo1: |
| Enter row title.: |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Select to add a row.: |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
| Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.": |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .