Attachment_0014-4_DD_Form_1692_ECP(pg4).pdf
DoD Form PDF 62 KB Posted
- Attached to
- Expeditionary Shelter Protection System (ESPS)
- Solicitation number
- W911QY-16-R-0003
About this file
Attachment 0014-4_DD Form 1692_ECP(pg4)
View the file
Other versions and copies of DD Form 1692
Show all 19
Who attaches DD Form 1692
Other files
Show 40 more
Latest 50 of 100 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 4
(This page for use as necessary.)
f. COORDINATION OF CHANGES WITH OTHER CONTRACTORS
g. COORDINATION CHANGES BY GOVERNMENT
h. ESTIMATED NET TOTAL COSTS/SAVINGS
(1) SPARES/REPAIR PARTS REWORK
(2) NEW SPARES AND REPAIR PARTS
(3) SUPPLY/PROVISIONING DATA
(4) SUPPORT EQUIPMENT
(5) RETROFIT KITS FOR SPARES
(6) OPERATOR TRAINING COURSES
(7) MAINTENANCE TRAINING COURSES
(8) REVISION OF TECHNICAL MANUALS
(9) NEW TECHNICAL MANUALS
(10) TRAINING/TRAINERS
(11) INTERIM SUPPORT
(12) MAINTENANCE MANPOWER
(13) COMPUTER PROGRAMS/DOCUMENTATION
51. ESTIMATED NET TOTAL COST IMPACT (Use parentheses for savings)
e. SUBTOTAL COSTS/SAVINGS
FACTOR
a. PRODUCTION COSTS / SAVINGS
c. INTEGRATED LOGISTICS SUPPORT COSTS/
SAVINGS
d. OTHER COSTS/SAVINGS
Non- Recurring
(a)
RECURRING
Unit (b)
Quantity (c)
Total (Recurring) (d)
Total (e)
COST / SAVINGS UNDER CONTRACT
Other Costs/
Savings to the Government
(f)
(1) CONFIGURATION ITEM / CSCI
(2) FACTORY TEST EQUIPMENT
(3) SPECIAL FACTORY TOOLING
(4) SCRAP
(5) ENGINEERING, ENGINEERING DATA REVISION
(6) REVISION OF TEST PROCEDURES
(7) QUALIFICATION OF NEW ITEMS
(8) SUBTOTAL OF PROD COSTS / SAVINGS
b. RETROFIT COSTS
(1) ENGINEERING DATA REVISION
(2) PROTOTYPE TESTING
(3) KIT PROOF TESTING
(4) RETROFIT KITS FOR OPERATIONAL SYSTEMS
(5) PREP. OF MWO/TCTO/SC/ALT/TD
(6) SPECIAL TOOLING FOR RETROFIT
(7) INSTALLATION - CONTRACTOR PERSONNEL
(8) INSTALLATION - GOVERNMENT PERSONNEL
(9) TESTING AFTER RETROFIT
(10) MODIFICATION OF GFE/GFP
(11) QUALIFICATION OF GFE/GFP
(12) SUBTOTAL OF RETROFIT COSTS/SAVINGS
(14) SUBTOTAL OF ILS COSTS/SAVINGS
(1) SUBTOTAL UNDER CONTRACT
ECP NUMBER:
OMB No.
0704-0188
PAN:
DD FORM 1692/4, MAR 2013
DISTRIBUTION STATEMENT:
DD Form 1694/4, Engineering Change Proposal Page 4, March 2013
WHS/ESD/IMD
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 4
(This page for use as necessary.)
f. COORDINATION OF CHANGES WITH OTHER CONTRACTORS
g. COORDINATION CHANGES BY GOVERNMENT
h. ESTIMATED NET TOTAL COSTS/SAVINGS
(1) SPARES/REPAIR PARTS REWORK
(2) NEW SPARES AND REPAIR PARTS
(3) SUPPLY/PROVISIONING DATA
(4) SUPPORT EQUIPMENT
(5) RETROFIT KITS FOR SPARES
(6) OPERATOR TRAINING COURSES
(7) MAINTENANCE TRAINING COURSES
(8) REVISION OF TECHNICAL MANUALS
(9) NEW TECHNICAL MANUALS
(10) TRAINING/TRAINERS
(11) INTERIM SUPPORT
(12) MAINTENANCE MANPOWER
(13) COMPUTER PROGRAMS/DOCUMENTATION
51. ESTIMATED NET TOTAL COST IMPACT
(Use parentheses for savings)
e. SUBTOTAL COSTS/SAVINGS
FACTOR
a. PRODUCTION COSTS / SAVINGS
c. INTEGRATED LOGISTICS SUPPORT COSTS/
SAVINGS
d. OTHER COSTS/SAVINGS Non- Recurring (a)
RECURRING
Unit (b) Quantity (c) Total (Recurring) (d) Total (e)
COST / SAVINGS UNDER CONTRACT
Other Costs/ Savings to the Government (f)
(1) CONFIGURATION ITEM / CSCI
(2) FACTORY TEST EQUIPMENT
(3) SPECIAL FACTORY TOOLING
(4) SCRAP
(5) ENGINEERING, ENGINEERING DATA REVISION
(6) REVISION OF TEST PROCEDURES
(7) QUALIFICATION OF NEW ITEMS
(8) SUBTOTAL OF PROD COSTS / SAVINGS
b. RETROFIT COSTS
(1) ENGINEERING DATA REVISION
(2) PROTOTYPE TESTING
(3) KIT PROOF TESTING
(4) RETROFIT KITS FOR OPERATIONAL SYSTEMS
(5) PREP. OF MWO/TCTO/SC/ALT/TD
(6) SPECIAL TOOLING FOR RETROFIT
(7) INSTALLATION - CONTRACTOR PERSONNEL
(8) INSTALLATION - GOVERNMENT PERSONNEL
(9) TESTING AFTER RETROFIT
(10) MODIFICATION OF GFE/GFP
(11) QUALIFICATION OF GFE/GFP
(12) SUBTOTAL OF RETROFIT COSTS/SAVINGS
(14) SUBTOTAL OF ILS COSTS/SAVINGS
(1) SUBTOTAL UNDER CONTRACT
ECP NUMBER:
OMB No.
0704-0188
PAN:
DD FORM 1692/4, MAR 2013
DISTRIBUTION STATEMENT:
| Procuring Activity Number (PAN).: |
| Engineering Change Proposal (ECP) number.: |
| 51. Estimated net total cost impact. a. Production costs/savings. Cost/Savings under contract: (a) Non-recurring. (1) Configuration item/CSCI. Enter a minus sign for savings, parentheses will appear automatically.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (2) Factory test equipment. Enter a minus sign for savings.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (3) Special factory tooling.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (4) Scrap.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (5) Engineering, engineering data revision.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (6) Revision of test procedures.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (7) Qualification of new items.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (8) Subtotal of production costs/savings.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| b. Retrofit costs. Cost/Savings under contract: (a) Non-recurring. (1) Engineering data revision. Enter a minus sign for savings.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (2) Prototype testing.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (3) Kit Proof Testing.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (4) Retrofit kits for operational systems.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Recurring. (b) Unit.: |
| Cost/Savings under contract: (a) Non-recurring. (5) Prep. of MWO/TCTO/SC/ALT/TD.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (6) Special tooling for retrofit.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (7) Installation - contractorpersonnel.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| (8) Installation - Government personnel. (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (9) Testing after retrofit.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (10) Modification of GFE/GFP.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Recurring. (b) Unit.: |
| Cost/Savings under contract: (a) Non-recurring. (11) Qualification of GFE/GFP.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (12) Subtotal of retrofit costs/savings.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| c. Integrated Logistics Support (ILS) costs/savings. Cost/Savings under contract: (a) Non-recurring. (1) Spare/repair parts rework. Enter a minus sign for savings.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (2) New spares and repair parts.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (3) Supplying/provisioning data.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (4) Support equipment.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (5) Retrofit kits for spares.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (6) Operator training courses.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (7) Maintenance training courses.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (8) Revision of technical manuals.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (9) New technical manuals.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (10) Training/trainers.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (11) Interim support.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Recurring. (b) Unit.: |
| Cost/Savings under contract: (a) Non-recurring. (12) Maintenance manpower.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (13) Computer programs/documentation.: |
| Recurring. (b) Unit.: |
| (c) Quantity.: |
| (d) Total recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| Cost/Savings under contract: (a) Non-recurring. (14) Subtotal of ILS costs/savings.: |
| (d) Total recurring.: |
| (f) Other Costs/savings to the Government.: |
| d. Other Cost/Savings. Under contract: (a) Non-recurring. : |
| (d) Recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| e. Subtotal costs/savings. Under contract: (a) Non-recurring. : |
| (d) Recurring.: |
| (e) Total (recurring plus non-recurring).: |
| (f) Other Costs/savings to the Government.: |
| (f) Other Costs/savings to the Government. (1) Subtotal under contract.: |
| (f) Other Costs/savings to the Government. f. Coordination of changes with other contractors.: |
| (f) Other Costs/savings to the Government. g. Coordination changes by government.: |
| (f) Other Costs/savings to the Government. h. Estimated net total costs/savings.: |
| Distribution statement.: |
File details come from the government source that posted it. Updated .