Attachment 0002 DD Form 1692.pdf

DoD Form PDF 3 MB Posted

Attached to
Type I Family of All Terrain Crane Solicitation Amendment 0009
Solicitation number
W56HZV-19-R-0118
Issued by

About this file

This solicitation requests offers for a Type I Family of All-Terrain Cranes (FOATC) contract. The Department of the Army Materiel Command TACOM Life Cycle Management Command is seeking a six-year firm-fixed-price requirements contract for an estimated quantity of 265 Type I FOATC units, three first article test units, ancillary services and logistic data. Offers are due no later than March 17, 2021. The contract will have a base period of three years plus three one-year option periods. Delivery locations will be FOB Destination. This is a full and open competitive solicitation open to all responsible sources.

View the file

Other versions and copies of DD Form 1692

File Revision Posted Attached to
Section J-13I DD Form 1692 Engineering Change Proposal.pdf Revision not stated Homeland Security Cutter - Light Icebreaker (HSC-L) Solicitation
ATT 0008 DD 1692 EngineeringChangeProposal (ECP).pdf Revision not stated Quick Disconnect Mechanism Assembly LH, RH
Attachment 0005 DD1692 ENGINEERING CHANGE PROPOSAL.docx Revision not stated 60mm (M204, M235, M236); 81mm (M218, M219, M220, M658); and 120mm (M234A1) Propelling Charges
Attachment 0003 _ DD Form 1692.pdf Same revision and size as this file Revision not stated Type I Family of All Terrain Crane Draft Section C (Scope of Work); Draft Attachments, and Draft Contract Data Requirement Lists (CDRLs)
Attach_0004_-_DD1692_Engineering_Change_Proposal_(ECP).pdf Revision not stated MK3 MOD 0 and MK12 MOD 1 Pallet
Attach_0004_-_DD1692_Engineering_Change_Proposal_(ECP).pdf Revision not stated MK3 MOD 0 & MK12 MOD 1 PALLET
Attachment_0006__DD1692_-_ENGINEERING_CHANGE_PROPOSAL_(ECP).pdf Revision not stated 60mm, 81mm, 120mm Mortar Propelling Charges
dd1692-Instruction.pdf Revision not stated BOMB FUZE PROTECTION ASSEMBLY
dd1692_ECP.pdf Revision not stated BOMB FUZE PROTECTION ASSEMBLY
Attachment_0007_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION, OVER 30MM UP TO 75MM
Attachment_0014-3_DD_Form_1692_ECP(pg3).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-6_DD_Form_1692_ECP(pg6).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-5_DD_Form_1692_ECP(pg5).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-7_DD_Form_1692_ECP(pg7).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-4_DD_Form_1692_ECP(pg4).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-2_DD_Form_1692_ECP(pg2).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-1_DD_Form_1692_ECP(pg1).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0003_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION AND NUCLEAR ORDNANCE BOXES, PACKAGES AND SPECIAL CONTAINERS
Attachment_0017_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION, OVER 30MM UP TO 75MM
Show all 19

Who attaches DD Form 1692

Other files

File Type Posted
W56HZV-19-R-0118 Conformed Copy Thru AMD 0009.pdf PDF
Solic Amend W56HZV-19-R-0118 0009.pdf PDF
Attachment 0041_ Pricing Attachment.xlsx XLSX spreadsheet
FOATC T1 Industry Q and_A on RFP 25May2021.pdf PDF
FOATC T1 Industry Q and_A on RFP 11MAY2021.pdf PDF
Attachment 0004 Operator and Maintainer Technical Supplementation Requirements.pdf PDF
Attachment 0041 - Pricing Attachment .xlsx XLSX spreadsheet
ATTACH 0047 TABLE A-II TM Req Matrix10.pdf PDF
Solic Amend W56HZV-19-R-0118 0008.pdf PDF
ATTACH 0018 TABLE A-IV TM Req Matrix23.pdf PDF
Solic Amend W56HZV-19-R-0118 0007.pdf PDF
Solic Amend W56HZV-19-R-0118 0006.pdf PDF
Attachment 0041 Pricing Attachment.xlsx XLSX spreadsheet
Solic Amend W56HZV-19-R-0118 0005.pdf PDF
FOATC T1 Industry Q and A on RFP 24 March 2021.pdf PDF
Solic Amend W56HZV-19-R-0118 0004.pdf PDF
Attachment 0042 Small Business Participation Factor Workbook 03Mar2021.xlsx XLSX spreadsheet
Attachment 0001 AT-PRF-0001 Type I FOATC PD v1.5.pdf PDF
Solic Amend W56HZV-19-R-0118 0003.pdf PDF
FOATC T1 Industry Q and A on Draft RFP Updated 12 Mar 2021.pdf PDF
FOATC T1 Industry Q and A on RFP 12 March 2021.pdf PDF
Solic Amend W56HZV-19-R-0118 0002.pdf PDF
W56HZV-19-R-0118 Signed.pdf PDF
Solic Amend W56HZV-19-R-0118 0001.pdf PDF
Attachment 0028 - GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0044 Certification Form.pdf PDF
Attachment 0041 - Pricing Attachment.xlsx XLSX spreadsheet
Attachment 0006 Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0007 Type I FOATC Point of Contact (POC) List.pdf PDF
Attachment 0010 Type I FOATC Program Risk Management Plan (RMP).PDF PDF
Attachment 0026 LMI Summary Worksheet NMWR Data.pdf PDF
Attachment 0043 Small Business Participation Factor Workbook Instructions.pdf PDF
Attachment 0033 Incoming Format Transaction.pdf PDF
Solicitation W56HZV-19-R-0118.pdf PDF
Attachment 0003 DA Form 2028 Recommended Changes to Publications and Blank Forms.pdf PDF
Attachment 0013 Hazardous Materials Management Report HMMR.XLSX XLSX spreadsheet
Attachment 0025 NMWR Special Instructions.pdf PDF
Attachment 0012 Prohibited Materials Waiver.pdf PDF
Attachment 0004 COTS Publications Requirements.pdf PDF
Attachment 0015 - Level of Repair Analysis (LORA).pdf PDF
Attachment 0030 Critical Stockage List.pdf PDF
Attachment 0029 LMI Data Products Worksheet.pdf PDF
Attachment 0040 Transportability for Better Deployability SDDC TEA Pamphlet 70-1.pdf PDF
Attachment 0009 LMI Summary Worksheet Maintenance Analysis.pdf PDF
Attachment 0008 Provisioning Requirements Statement.pdf PDF
Attachment 0031 Sample of DLA Approved EDFP Drawings.pdf PDF
Attachment 0014 - Treatment And Finish Requirements.pdf PDF
Attachment 0017 - General Publications Requirements for Page-Based TMs.pdf PDF
Attachment 0045 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
FOATC T1 Industry QAs 16 Feb 2021.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

OMB 0704-0188 Exp: 10/31/2019 Page of

PREVIOUS EDITIONS ARE OBSOLETE

DD FORM 1692 (REV 01/2018)

OMB NO. 0704-0188

Exp: 10/31/2019 Page of

PREVIOUS EDITIONS ARE OBSOLETE

DD FORM 1692 (REV 01/2018)

ENGINEERING CHANGE PROPOSAL (ECP) Page 1 The public reporting burden for this collection of information, 0704-0188, is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE ACQUIRER ISSUING CONTRACTING OFFICER FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED IN ITEM 23 OF THIS FORM.

5. CLASS OF ECP:

6. PRIORITY:

7. ECP TYPE:

Check F-Formal

8. JUSTIFICATION CODE:

13. PRIMARY ITEM

14. AFFECTED

ITEM(S)

REMOVE:

f. REVISED

DOCUMENT

ATTACHED (Y/N)?

16. DOCUMENTS AFFECTED

a. CAGE

b. DOCUMENT NO.

c. TITLE/NOMENCLATURE/NAME d.

CURRENT

REVISION

e.

NOR

NO.

17. BASELINE AFFECTED:

18. IN PRODUCTION:

21a. COST IMPACT FROM ECP?

21b. RETROFIT EXISTING ASSETS?

22. CONTRACT

23. CONTRACTING OFFICER

24. ORIGINATOR

25. BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY

a. RECOMMENDATIONS:

26a. DISPOSITION: (Configuration Approval Authority)

27. ACTIVITY ACCOMPLISHING REVISION AND DATE OF REVISION

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 2

(For use if Block 17 is functional or allocated.)

EFFECTS ON FUNCTIONAL/ALLOCATED CONFIGURATION DOCUMENTATION

28. OTHER EXTERNAL SYSTEMS OR EXTERNAL

CONFIGURATION ITEMS AFFECTED:

29. OTHER SUPPLIERS / ACTIVITIES AFFECTED:

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3

(This page for use as necessary)

EFFECTS ON ENGINEERING, SUPPORT, AND OTHER PRODUCT ATTRIBUTES

38. EFFECT ON INTEGRATED PRODUCT SUPPORT ELEMENTS

39. EFFECT ON OTHER PRODUCT ATTRIBUTES

g. Demilitarization & Disposal

f. Critical Safety Item (CSI)

f. Packaging, Handling, Storage, and Transportation (PHS&T)

e. Maintenance Planning & Mgmt

e. Corrosion Prevention and Control

d. Commercial-Off-the-Shelf (COTS)

d. Supply Support

c. Sustaining Engineering

c. Anti-Counterfeiting

b. Affordability

b. Design Interface

a. Product Support Management

a. Accessibility

37. EFFECT ON SYSTEMS ENGINEERING DESIGN CONSIDERATIONS

PAR.

ENCL.

FACTOR

(X)

PAR.

ENCL.

FACTOR

(X)

m. Interoperability & Dependency

l. Intelligence

k. Insensitive Munitions

l. Computer Resources

k. Facilities & Infrastructure

j. Human Systems Integration (HSI)

i. Environment, Safety, and Occupational Health (ESOH)

j. Manpower & Personnel

i. Training & Training Support

h. Support Equipment

g. Technical Data

h. Diminishing Manufacturing Sources & Material Shortages (DMSMS)

g. Warranty/Guarantee

v. System Security Engineering

w. Electromagnetic Interference

u. Survivability

f. Other Equipment

e. Activation/Deployment Schedule

t. Standardization

s. Spectrum Management

d. Operating Procedures

c. Service Life

r. Reliability & Maintainability (R&M)

q. PHS&T

b. Certifications

a. Performance

p. Operational Energy

o. Open Systems Architecture (OSA)

n. Item Unique Identification (IUID)

49. DATE ACQUIRER APPROVAL NEEDED FOR: (DD Mmm YYYY)

46. IS SUPPLIER FIELD SERVICE ENGINEERING REQUIRED?

45a. THIS CHANGE IS TO BE ACCOMPLISHED:

43. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 4

(This page for use as necessary)

ESTIMATED NET TOTAL COST IMPACT

50. ESTIMATED NET TOTAL COST IMPACT (Use parentheses for savings) Other Costs/ Savings to the Acquirer (f)

(9) TRAINING & TRAINING SUPPORT

(8) SUPPORT EQUIPMENT

(7) TECHNICAL DATA

(13) OTHER

(12) COMPUTER RESOURCES

(11) FACILITIES & INFRASTRUCTURE

FACTOR

COSTS/SAVINGS UNDER CONTRACT

Non-Recurring (a)

RECURRING

Unit (b) Quantity (c) Total (Recurring) (d) Total (e)

a. PRODUCTION COSTS / SAVINGS

(1) CONFIGURATION ITEM / CSCI

(2) FACTORY TEST EQUIPMENT

(3) SPECIAL FACTORY TOOLING

(4) SCRAP

(5) ENGINEERING, ENGINEERING DATA REVISION

(6) REVISION OF TEST PROCEDURES

(7) QUALIFICATION OF NEW ITEMS

(8) SUBTOTAL OF PROD COSTS/SAVINGS

b. RETROFIT COSTS

(1) ENGINEERING DATA REVISION

(2) PROTOTYPE TESTING

(3) KIT PROOF TESTING

(4) RETROFIT KITS FOR OPERATIONS SYSTEMS

(5) PREP OF MWO / TCTO / SC / ALT / TD

(6) SPECIAL TOOLING FOR RETROFIT

(7) INSTALLATION - SUPPLIER PERSONNEL

(8) INSTALLATION - ACQUIRER PERSONNEL

(9) TESTING AFTER RETROFIT

(10) MODIFICATION OF GFE/GFP

(11) QUALIFICATION OF GFE/GFP

(12) SUBTOTAL OF RETROFIT COSTS/SAVINGS

c. INTEGRATED PRODUCT SUPPORT COSTS

(1) PRODUCT SUPPORT MANAGEMENT

(2) DESIGN INTERFACE

(3) SUSTAINING ENGINEERING

(4) SUPPLY SUPPORT

(5) MAINTENANCE PLANNING & MANAGEMENT

(6) PACKAGING, HANDLING, STORAGE &

TRANSPORTATION (PHS&T)

(10) MANPOWER & PERSONNEL

(14) SUBTOTAL OF IPS COSTS/SAVINGS

d. OTHER COSTS / SAVINGS

e. SUBTOTAL COSTS / SAVINGS

(1) SUBTOTAL UNDER CONTRACT

f. COORDINATION OF CHANGES WITH OTHER SUPPLIERS

g. COORDINATION CHANGES BY ACQUIRER

h. ESTIMATED NET TOTAL COSTS/SAVINGS

ENGINEERING CHANGE PROPOSAL(ECP), PAGE 5

(This page for use as necessary) ESTIMATED COSTS/SAVINGS SUMMARY, RELATED ECPs

51. ESTIMATED COSTS / SAVINGS SUMMARY, RELATED ECPs (Use parentheses for savings)

OTHER

COSTS/SAVINGS

TO ACQUIRER

(d)

CAGE CODE

(a)

ECP NUMBER

(b)

COSTS/SAVINGS

UNDER CONTRACTS

(c)

a. PRODUCTION COSTS / SAVINGS (Subtotal of Costs /Savings Elements from Page 4, 50a. applicable to aircraft, ship, tank, vehicle, missile or its subsystem)

(1) SUBTOTAL PRODUCTION COSTS / SAVINGS

b. RETROFIT COSTS (Applicable to aircraft, ship tank, vehicle, missile or its subsystem)

(1) SUBTOTAL RETROFIT COSTS

c. INTEGRATED PRODUCT SUPPORT

COSTS/SAVINGS REVISED REQUIREMENTS

(1) ITEM RETROFIT (If not covered under "b") (Applicable to aircraft, ship, tank, missile or its subsystem)

(2) IPS SUBTOTAL (Applicable to aircraft, ship tank, mission or its subsystem)

(3) OPERATOR TRAINER (Net total cost/savings from each ECP covering Operator trainer)

(4) MAINTENANCE TRAINER (Net total cost/savings from each ECP covering maintenance trainer)

(5) OTHER TRAINING EQUIPMENT

(6) SUPPORT EQUIPMENT (Net total cost/savings from each ECP on support equipment)

(7) IPS PLANS

(8) MAINTENANCE CONCEPT, PLANS, SYSTEM

DOCUMENTS

(9) INTERIM SUPPORT PLAN

NEW REQUIREMENTS

CAGE

CODE

NON-

RECURRING

COSTS

RECURRING COSTS

UNIT

QTY

TOTAL

(10) PROVISIONING DOCUMENTATION

(11) OPER TRNR/TRNG DEVICES/EQUIP

(12) MANUALS/SPARES, REPAIR PARTS

(For (11))

(13) MAINTENANCE TRNR/TRNG DEVICES/

EQUIPMENT

(14) MANUALS/SPARES, REPAIR PARTS

(for (13))

(15) SUPPORT EQUIPMENT

(16) MANUALS (for (15))

(17) PROVISIONING DOCUMENTATION (For (15))

(18) REPAIR PARTS (for (15))

(19) SUBTOTAL FOR IPS COSTS / SAVINGS

(Sum of 51C (1) through (18))

d. OTHER COSTS / SAVINGS (Total from Page 4, 50d., or related ECPs)

CAGE CODE

ECP NUMBER

(1) TOTAL OTHER COSTS / SAVINGS

(2) SUBTOTALS OF COLUMNS (A + B + C + D)

(3) SUBTOTAL UNDER CONTRACT

e. ESTIMATED NET TOTAL COSTS / SAVINGS

ENGINEERING CHANGE PROPOSAL (ECP) (HARDWARE), PAGE 6

(This page for use as necessary)

55. DATE AUTHORIZATION TO PROCEED

RECEIVED BY SUPPLIER (DD Mmm YYYY) INDICATE START DELIVEY WITH AN "S", COMPLETION DELIVERY WITH A "C", PROGRESS POINT WITH A "P".

NO. OF MONTHS

(1) Production

(2) Tech Manuals

(3) Retrofit

(4) MWO/TCTO/SC/ALT/TD

(5) Spares/Repair Parts

a. CONFIGURATION ITEM

(1) Production

(2) Tech Manuals/Prog. Tapes

(3) Retrofit

(4) MWO/TCTO/SC/ALT/TD

(5) Repair Parts

b. SUPPORT EQUIPMENT

(1) Operator

(2) Maintenance

c. TRAINER

NO. OF MONTHS

ENGINEERING CHANGE PROPOSAL (ECP) (SOFTWARE), PAGE 7

(This page for use as necessary)

59. DATE AUTHORIZATION TO PROCEED

RECEIVED BY SUPPLIER (DD Mmm YYYY) INDICATE START DELIVEY WITH AN "S", COMPLETION DELIVERY WITH A "C", PROGRESS POINT WITH A "P".

NO. OF MONTHS

(1) Software Engineering

(2) Software Documentation

(3) Software Replication

(4) Software Distribution

a. CONFIGURATION ITEM (5)

(1) Software Engineering Environment Upgrade

(2) Software Test Environment Upgrade

b. SUPPORT EQUIPMENT (3)

(1) Operator

(2) Maintenance

c. TRAINER (3)

NO. OF MONTHS

11.0.1.20130826.2.901444.899636 List Of Attachments

CurrentPage:
PageCount:
Enter the date using the format DD MMM YYYY.:
ecpNo2:
ecpRev2:
procuringActNo:
distStatmt:
Enter Title of Change:
Check Major(Class I):
Enter Minor(Class II):
Check E-Emergency:
Check U-Urgent:
Check R-Routine:
Check P-Preliminary:
formal:
Check B-Interface:
Check C-Compatibility:
Check D-Correction of Deciency:
Check O-Operational or Logic Support:
Check P-Production Stoppage:
Check R-Cost Reduction:
Check S-Safety:
Check V-Value Engineering:
Check A-Administrative:
Enter Description of Change:
Enter Need for change:
topLevelItem:
higherLevelItem:
Enter Name and Designation :
Enter Part Number:
Enter NSN:
Enter Item Name and Designation:
Enter Part Number:
Enter NSN:
Enter Alter, Add, or Remove:
Enter List of External Systems or External Configuration Items Affected:
Enter CAGE:
Enter Document:
Enter Title/Nomenclature/Name:
Enter Current Revision:
Enter NOR Number:
Enter Revised Document Attached Y/N?:
remove:
Add:
Check Functional: 0
Check Allocated: 0
Check Product: 0
Check Yes In Production:
Check No In Production:
Enter Production Effectivity (quantity, Lot Number, Serial Number, Date):
Enter Effect on Delivery Schedule:
Check Yes for Cost Impact From ECP:
Check No for Cost Impact From ECP :
Enter If Block 21A is Yes, Include References:
yes4:
no4:
Enter Retrofit Effectivity (If 21b is Yes, Enter Retrofit Effectivity Information, If 21B is No Enter N/A) :
Enter Retrofit Delivery Schedule (If 21b is Yes, Enter Retrofit Delivery Schedule Information, If 21B is No Enter N/A) :
Enter Supplier:
Enter Contract Number/Line Item:
Enter Contracting Officer Name:
Enter Contracting Officer Telephone:
Enter Contracting Officer E-mail:
Enter Originator Name:
Enter Originator Address:
Enter Originator Telephone:
Enter Originator E-mail:
cageCode:
Enter Originator Submitting Activity:
Enter Originator Authorized Signature:
Enter Originator Name and Title:
approval:
disapproval:
approveWithMod:
Enter Name and Title:
Enter the date using the format DD MMM YYYY.:
Enter Signature:
Enter Comments:
Enter Name and Title:
Enter the date using the format DD MMM YYYY.:
Enter Signature:
Enter Comments:
Enter Name and Title:
Enter the date using the format DD MMM YYYY.:
Enter Signature:
AddAttachment:
ViewAttachment:
RemoveAttachment:
Enter List of Attachment by clicking Add Attachment:
otherExtSys:
otherSuppliers:
configItemsAffected:
effectsonPerform:
effectsonStaffing:
effectsonConfiguration:
developmentalReq:
tradeOffs:
dateContractAuthNeeded:
demilitarization: 0
critSafetyItem: 0
encl37g:
encl37f:
par37g:
par37f:
pkgHandling: 0
encl38f:
par38f:
par38e:
encl38e:
maintPlanMgmt: 0
par37e:
encl37e:
corrosionPrev: 0
cots: 0
encl37d:
par37d:
supplySup: 0
encl38d:
par38d:
par38c:
encl38c:
sustainingEng: 0
par37c:
encl37c:
antiCounter: 0
affordability: 0
encl37b:
par37b:
designInterface: 0
encl38b:
par38b:
par38a:
encl38a:
prodSupMgmt: 0
par37a:
encl37a:
accessiblity: 0
interopDep: 0
encl37m:
par37m:
otherTxt:
other: 0
par37l:
encl37l:
intelligence: 0
insensitiveMun: 0
encl37k:
par37k:
compResources: 0
encl38l:
par38l:
par38k:
encl38k:
facInfrastruct: 0
par37j:
encl37j:
humanSys: 0
esoh: 0
encl37i:
par37i:
trainSup: 0
manPersonnel: 0
encl38i:
encl38j:
par38j:
par38i:
par38h:
par38g:
encl38h:
encl38g:
supEquip: 0
techData: 0
par37h:
encl37h:
diminishManufact: 0
other2: 0
other2: 0
encl37w:
par37w:
other3: 0
other2Txt:
encl37x:
par37x:
other3Txt:
encl39h:
par39h:
par39g:
encl39g:
warranty: 0
par37v:
encl37v:
sysSecurity: 0
survivability: 0
encl37u:
par37u:
otherEquip: 0
encl39f:
par39f:
par39e:
encl39e:
actDeploy: 0
par37t:
encl37t:
standardization: 0
spectrumMgmt: 0
encl37s:
par37s:
OpProced: 0
encl39d:
par39d:
par39c:
encl39c:
serviceLife: 0
par37r:
encl37r:
reliability: 0
phst: 0
encl37q:
par37q:
certifications: 0
encl39b:
par39b:
par39a:
encl39a:
performance: 0
par37p:
encl37p:
opEnergy: 0
osa: 0
encl37o:
par37o:
par37n:
encl37n:
itemUniqueID: 0
par38m:
encl38m:
altSolutions:
devStatus:
recommendRetrofit:
Enter the date using the format DD MMM YYYY.:
Enter the date using the format DD MMM YYYY.:
effect:
outofService:
Yes:
No:
Accafter: 0
Accwith: 0
Accbefore: 0
workHourstoConduct:
other43:
depot:
intermediate:
org:
a1a:
a1b:
a1c:
a1d:
a1e: 0.00000000
a1f:
a2a:
a2b:
a2c:
a2d:
a2e: 0.00000000
a2f:
a3a:
a3b:
a3c:
a3d:
a3e: 0.00000000
a3f:
a4a:
a4b:
a4c:
a4d:
a4e: 0.00000000
a4f:
a5a:
a5b:
a5c:
a5d:
a5e: 0.00000000
a5f:
a6a:
a6b:
a6c:
a6d:
a6e: 0.00000000
a6f:
a7a:
a7b:
a7c:
a7d:
a7e: 0.00000000
a7f:
a8a: 0.00000000
a8d: 0.00000000
a8f: 0.00000000
b1a:
b1b:
b1c:
b1d:
b1e: 0.00000000
b1f:
b2a:
b2b:
b2c:
b2d:
b2e: 0.00000000
b2f:
b3a:
b3b:
b3c:
b3d:
b3e: 0.00000000
b3f:
b4a:
b4b:
b4c:
b4d:
b4e: 0.00000000
b4f:
b5a:
b5b:
b5c:
b5d:
b5e: 0.00000000
b5f:
b6a:
b6b:
b6c:
b6d:
b6e: 0.00000000
b6f:
b7a:
b7b:
b7c:
b7d:
b7e: 0.00000000
b7f:
b8a:
b8b:
b8c:
b8d:
b8e: 0.00000000
b8f:
b9a:
b9b:
b9c:
b9d:
b9e: 0.00000000
b9f:
b10a:
b10b:
b10c:
b10d:
b10e: 0.00000000
b10f:
b11a:
b11b:
b11c:
b11d:
b11e: 0.00000000
b11f:
b12a: 0.00000000
b12d: 0.00000000
b12e: 0.00000000
b12f: 0.00000000
c1a:
c1b:
c1c:
c1e: 0.00000000
c1f:
c2a:
c2b:
c2c:
c2d:
c2e: 0.00000000
c2f:
c3a:
c3b:
c3c:
c3d:
c3e: 0.00000000
c3f:
c4a:
c4b:
c4c:
c4d:
c4e: 0.00000000
c4f:
c5a:
c5b:
c5c:
c5d:
c5e: 0.00000000
c5f:
c6a:
c6b:
c6c:
c6d:
c6e: 0.00000000
c6f:
c7a:
c7b:
c7c:
c7d:
c7e: 0.00000000
c7f:
c8a:
c8b:
c8c:
c8d:
c8e: 0.00000000
c8f:
c9a:
c9b:
c9c:
c9d:
c9e: 0.00000000
c9f:
c10a:
c10b:
c10c:
c10d:
c10e: 0.00000000
c10f:
c11a:
c11b:
c11c:
c11d:
c11e: 0.00000000
c11f:
c12a:
c12b:
c12c:
c12d:
c12e: 0.00000000
c12f:
c13a:
c13b:
c13c:
c13d:
c13e: 0.00000000
c13f:
c14a: 0.00000000
c14d: 0.00000000
c14e: 0.00000000
c14f: 0.00000000
d0a:
d0d:
d0e: 0.00000000
d0f:
e0a: 0.00000000
e0d: 0.00000000
e0d: 0.00000000
e0f: 0.00000000
e1f:
f1f:
g1f:
h1f: 0.00000000
a8e: 0.00000000
c1d:
e0e: 0.00000000
a0a:
a0b:
a0c:
a0d:
b0a:
b0b:
b0c:
b0d:
c0d:
cageCode10:
c10nonRecur:
c10unit:
c10qty:
c10total:
cageCode11:
c11nonRecur:
c11unit:
c11qty:
c11total:
cageCode12:
c12nonRecur:
c12unit:
c12qty:
c12total:
cageCode13:
c13nonRecur:
c13unit:
c13qty:
c13total:
cageCode14:
c14nonRecur:
c14unit:
c14qty:
c14total:
c14c:
cageCode15:
c15nonRecur:
c15unit:
c15qty:
c15total:
c15c:
c15d:
cageCode16:
c16nonRecur:
c16unit:
c16qty:
c16total:
c16c:
c16d:
cageCode17:
c17nonRecur:
c17unit:
c17qty:
c17total:
c17c:
c17d:
cageCode18:
c18nonRecur:
c18unit:
c18qty:
c18total:
c18c:
c18d:
c19c: 0.00000000
c19d: 0.00000000
cageCoded:
ecpNumberd:
d0c:
dRow1:
cageCoded1:
ecpNumberd1:
dRow1c:
dRow1d:
dRow2:
cageCoded2:
ecpNumberd2:
dRow2c:
dRow2d:
dRow3:
cageCoded3:
ecpNumberd3:
dRow3c:
dRow3d:
d1c: 0.00000000
d1d: 0.00000000
d2c: 0.00000000
d2d: 0.00000000
d3c:
d3d:
e0c: 0.00000000
configItemNom:
titleofChg:
dateAuthProceed:
a1Col1:
a5Col12:
a4Col12:
a3Col12:
a2Col12:
a1Col12:
a5Col11:
a4Col11:
a3Col11:
a2Col11:
a1Col11:
a5Col10:
a4Col10:
a3Col10:
a2Col10:
a1Col10:
a5Col9:
a4Col9:
a3Col9:
a2Col9:
a1Col9:
a5Col8:
a4Col8:
a3Col8:
a2Col8:
a1Col8:
a5Col7:
a4Col7:
a3Col7:
a2Col7:
a1Col7:
a5Col6:
a4Col6:
a3Col6:
a2Col6:
a1Col6:
a5Col5:
a4Col5:
a3Col5:
a2Col5:
a1Col5:
a5Col4:
a4Col4:
a3Col4:
a2Col4:
a1Col4:
a5Col3:
a4Col3:
a3Col3:
a2Col3:
a1Col3:
a5Col2:
a4Col2:
a3Col2:
a2Col2:
a1Col2:
a1Col13:
a1Col25:
a2Col1:
a2Col13:
a2Col25:
a3Col1:
a3Col13:
a3Col25:
a4Col1:
a4Col13:
a4Col25:
a5Col1:
a5Col13:
a1Col24:
a2Col24:
a3Col24:
a4Col24:
a5Col24:
a1Col23:
a2Col23:
a3Col23:
a4Col23:
a5Col23:
a1Col22:
a2Col22:
a3Col22:
a4Col22:
a5Col22:
a1Col21:
a2Col21:
a3Col21:
a4Col21:
a5Col21:
a1Col20:
a2Col20:
a3Col20:
a4Col20:
a5Col20:
a1Col19:
a2Col19:
a3Col19:
a4Col19:
a5Col19:
a1Col18:
a2Col18:
a3Col18:
a4Col18:
a5Col18:
a1Col17:
a2Col17:
a3Col17:
a4Col17:
a5Col17:
a1Col16:
a2Col16:
a3Col16:
a4Col16:
a5Col16:
a1Col15:
a2Col15:
a3Col15:
a4Col15:
a5Col15:
a1Col14:
a2Col14:
a3Col14:
a4Col14:
a5Col14:
a5Col25:
a1Col36:
a2Col36:
a3Col36:
a4Col36:
a5Col36:
a1Col35:
a2Col35:
a3Col35:
a4Col35:
a5Col35:
a1Col34:
a2Col34:
a3Col34:
a4Col34:
a5Col34:
a1Col33:
a2Col33:
a3Col33:
a4Col33:
a5Col33:
a1Col32:
a2Col32:
a3Col32:
a4Col32:
a5Col32:
a1Col31:
a2Col31:
a3Col31:
a4Col31:
a5Col31:
a1Col30:
a2Col30:
a3Col30:
a4Col30:
a5Col30:
a1Col29:
a2Col29:
a3Col29:
a4Col29:
a5Col29:
a1Col28:
a2Col28:
a3Col28:
a4Col28:
a5Col28:
a1Col27:
a2Col27:
a3Col27:
a4Col27:
a5Col27:
a1Col26:
a2Col26:
a3Col26:
a4Col26:
a5Col26:
rowNo1: ( 6 )
rowNo1: ( 6 )
a6Col0:
a6Col1:
a6Col12:
a6Col11:
a6Col10:
a6Col9:
a6Col8:
a6Col7:
a6Col6:
a6Col5:
a6Col4:
a6Col3:
a6Col2:
a6Col13:
a6Col24:
a6Col23:
a6Col22:
a6Col21:
a6Col20:
a6Col19:
a6Col18:
a6Col17:
a6Col16:
a6Col15:
a6Col14:
a6Col25:
a6Col36:
a6Col35:
a6Col34:
a6Col33:
a6Col32:
a6Col31:
a6Col30:
a6Col29:
a6Col28:
a6Col27:
a6Col26:
add:
b1Col1:
b1Col13:
b1Col25:
b2Col1:
b2Col13:
b2Col25:
b3Col1:
b3Col13:
b3Col25:
b4Col1:
b4Col13:
b4Col25:
b5Col1:
b1Col12:
b2Col12:
b3Col12:
b4Col12:
b5Col12:
b1Col11:
b2Col11:
b3Col11:
b4Col11:
b5Col11:
b1Col10:
b2Col10:
b3Col10:
b4Col10:
b5Col10:
b1Col9:
b2Col9:
b3Col9:
b4Col9:
b5Col9:
b1Col8:
b2Col8:
b3Col8:
b4Col8:
b5Col8:
b1Col7:
b2Col7:
b3Col7:
b4Col7:
b5Col7:
b1Col6:
b2Col6:
b3Col6:
b4Col6:
b5Col6:
b1Col5:
b2Col5:
b3Col5:
b4Col5:
b5Col5:
b1Col4:
b2Col4:
b3Col4:
b4Col4:
b5Col4:
b1Col3:
b2Col3:
b3Col3:
b4Col3:
b5Col3:
b1Col2:
b2Col2:
b3Col2:
b4Col2:
b5Col2:
b5Col13:
b1Col24:
b2Col24:
b3Col24:
b4Col24:
b5Col24:
b1Col23:
b2Col23:
b3Col23:
b4Col23:
b5Col23:
b1Col22:
b2Col22:
b3Col22:
b4Col22:
b5Col22:
b1Col21:
b2Col21:
b3Col21:
b4Col21:
b5Col21:
b1Col20:
b2Col20:
b3Col20:
b4Col20:
b5Col20:
b1Col19:
b2Col19:
b3Col19:
b4Col19:
b5Col19:
b1Col218:
b2Col18:
b3Co18:
b4Col18:
b5Col18:
b1Col17:
b2Col17:
b3Col17:
b4Col17:
b5Col17:
b1Col16:
b2Col16:
b3Col16:
b4Col16:
b5Col16:
b1Col15:
b2Col15:
b3Col15:
b4Col15:
b5Col15:
b1Col14:
b2Col14:
b3Col14:
b4Col14:
b5Col14:
b5Col25:
b1Col36:
b2Col36:
b3Col36:
b4Col36:
b5Col36:
b1Col35:
b2Col35:
b3Col35:
b4Col35:
b5Col35:
b1Col34:
b2Col34:
b3Col34:
b4Col34:
b5Col34:
b1Col33:
b2Col33:
b3Col33:
b4Col33:
b5Col33:
b1Col32:
b2Col32:
b3Col32:
b4Col32:
b5Col32:
b1Col31:
b2Col31:
b3Col31:
b4Col31:
b5Col31:
b1Col30:
b2Col30:
b3Col30:
b4Col30:
b5Col30:
b1Col29:
b2Col29:
b3Col29:
b4Col29:
b5Col29:
b1Col28:
b2Col28:
b3Col28:
b4Col28:
b5Col28:
b1Col27:
b2Col27:
b3Col27:
b4Col27:
b5Col27:
b1Col26:
b2Col26:
b3Col26:
b4Col26:
b5Col26:
rowNo2: ( 6 )
rowNo2: ( 4 )
b6Col0:
b6Col1:
b6Col12:
b6Col11:
b6Col9:
b6Col8:
b6Col7:
b6Col6:
b6Col5:
b6Col4:
b6Col3:
b6Col2:
b6Col13:
b6Col24:
b6Col23:
b6Col22:
b6Col21:
b6Col20:
b6Col19:
b6Col18:
b6Col17:
b6Col16:
b6Col15:
b6Col14:
b6Col25:
b6Col36:
b6Col35:
b6Col34:
b6Col33:
b6Col32:
b6Col31:
b6Col30:
b6Col29:
b6Col28:
b6Col27:
b6Col26:
c1Col1:
c1Col13:
c1Col25:
c2Col1:
c1Col12:
c2Col12:
c1Col11:
c2Col11:
c1Col10:
c2Col10:
c1Col9:
c2Col9:
c1Col8:
c2Col8:
c1Col7:
c2Col7:
c1Col6:
c2Col6:
c1Col5:
c2Col5:
c1Col4:
c2Col4:
c1Col3:
c2Col3:
c1Col2:
c2Col2:
c2Col13:
c1Col24:
c2Col24:
c1Col23:
c2Col23:
c1Col22:
c2Col22:
c1Col21:
c2Col21:
c1Col20:
c2Col20:
c1Col19:
c2Col19:
c1Col18:
c2Col18:
c1Col17:
c2Col17:
c1Col16:
c2Col16:
c1Col15:
c2Col15:
c1Col14:
c2Col14:
c2Col25:
c1Col36:
c2Col36:
c1Col35:
c2Col35:
c1Col34:
c2Col34:
c1Col33:
c2Col33:
c1Col32:
c2Col32:
c1Col31:
c2Col31:
c1Col29:
c2Col29:
c1Col28:
c2Col28:
c1Col27:
c2Col27:
c1Col26:
c2Col26:
rowNo3: ( 3 )
rowNo3: ( 4 )
c6Col0:
c6Col1:
c6Col12:
c6Col11:
c6Col10:
c6Col9:
c6Col8:
c6Col7:
c6Col6:
c6Col5:
c6Col4:
c6Col3:
c6Col2:
c6Col13:
c6Col24:
c6Col23:
c6Col22:
c6Col21:
c6Col20:
c6Col19:
c6Col18:
c6Col17:
c6Col16:
c6Col15:
c6Col14:
c6Col25:
c6Col36:
c6Col35:
c6Col34:
c6Col33:
c6Col32:
c6Col31:
c6Col29:
c6Col28:
c6Col27:
c6Col26:
a5Col0:
b3Col0:
b1Col18:
b3Col18:
b6Col10:
c3Col0:
c3Col1:
c3Col12:
c3Col11:
c3Col10:
c3Col9:
c3Col8:
c3Col7:
c3Col6:
c3Col5:
c3Col4:
c3Col3:
c3Col2:
c3Col13:
c3Col24:
c3Col23:
c3Col22:
c3Col21:
c3Col20:
c3Col19:
c3Col18:
c3Col17:
c3Col16:
c3Col15:
c3Col14:
c3Col25:
c3Col36:
c3Col35:
c3Col34:
c3Col33:
c3Col32:
c3Col31:
c1Col30:
c2Col30:
c3Col30:
c3Col29:
c3Col28:
c3Col27:
c3Col26:
c6Col30:

File details come from the government source that posted it. Updated .