ATT 0008 DD 1692 EngineeringChangeProposal (ECP).pdf

DoD Form PDF 3 MB Posted

Attached to
Quick Disconnect Mechanism Assembly LH, RH
Solicitation number
W56HZV-23-R-0064_Quick_Disconnect_Mechanism_Assembly_LH_RH
Issued by

About this file

This solicitation requests proposals for a requirements contract to provide quick disconnect mechanism assemblies left-hand and right-hand. The contract will have an estimated value of 143 units for the left-hand assembly and 114 units for the right-hand assembly over three years. Offerors must be certified under the United States/Canada Joint Certification Program and have a DD Form 2345 on file to access the technical data package. Proposals are due to the Army contracting specialist by the date specified and must include pricing for all fill-in contract clauses. If awarded, the firm-fixed-price contract will require delivery of 72 left-hand and 57 right-hand units per month to Anniston, Alabama within 240 days of award. The assemblies must meet ISO 9001:2015 standards and MIL-STD-1916 requirements.

View the file

Other versions and copies of DD Form 1692

File Revision Posted Attached to
Section J-13I DD Form 1692 Engineering Change Proposal.pdf Revision not stated Homeland Security Cutter - Light Icebreaker (HSC-L) Solicitation
Attachment 0005 DD1692 ENGINEERING CHANGE PROPOSAL.docx Revision not stated 60mm (M204, M235, M236); 81mm (M218, M219, M220, M658); and 120mm (M234A1) Propelling Charges
Attachment 0002 DD Form 1692.pdf Revision not stated Type I Family of All Terrain Crane Solicitation Amendment 0009
Attachment 0003 _ DD Form 1692.pdf Revision not stated Type I Family of All Terrain Crane Draft Section C (Scope of Work); Draft Attachments, and Draft Contract Data Requirement Lists (CDRLs)
Attach_0004_-_DD1692_Engineering_Change_Proposal_(ECP).pdf Revision not stated MK3 MOD 0 and MK12 MOD 1 Pallet
Attach_0004_-_DD1692_Engineering_Change_Proposal_(ECP).pdf Revision not stated MK3 MOD 0 & MK12 MOD 1 PALLET
Attachment_0006__DD1692_-_ENGINEERING_CHANGE_PROPOSAL_(ECP).pdf Revision not stated 60mm, 81mm, 120mm Mortar Propelling Charges
dd1692-Instruction.pdf Revision not stated BOMB FUZE PROTECTION ASSEMBLY
dd1692_ECP.pdf Revision not stated BOMB FUZE PROTECTION ASSEMBLY
Attachment_0007_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION, OVER 30MM UP TO 75MM
Attachment_0014-3_DD_Form_1692_ECP(pg3).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-6_DD_Form_1692_ECP(pg6).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-5_DD_Form_1692_ECP(pg5).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-7_DD_Form_1692_ECP(pg7).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-4_DD_Form_1692_ECP(pg4).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-2_DD_Form_1692_ECP(pg2).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-1_DD_Form_1692_ECP(pg1).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0003_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION AND NUCLEAR ORDNANCE BOXES, PACKAGES AND SPECIAL CONTAINERS
Attachment_0017_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION, OVER 30MM UP TO 75MM
Show all 19

Who attaches DD Form 1692

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

OMB 0704-0188 Exp: 20221130

Page of

PREVIOUS EDITIONS ARE OBSOLETE

DD FORM 1692 (REV 01/2018)

OMB 0704-0188 Exp: 20221130

Page of

PREVIOUS EDITIONS ARE OBSOLETE

DD FORM 1692 (REV 01/2018)

ENGINEERING CHANGE PROPOSAL (ECP) Page 1

The public reporting burden for this collection of information, 0704-0188, is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE ACQUIRER ISSUING CONTRACTING OFFICER FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED IN ITEM 23 OF THIS FORM.

5. CLASS OF ECP:

6. PRIORITY:

7. ECP TYPE:

Check F-Formal

8. JUSTIFICATION CODE:

13. PRIMARY ITEM

14. AFFECTED

ITEM(S)

d. ALTER, ADD, OR

f. REVISED

DOCUMENT

ATTACHED (Y/N)?

16. DOCUMENTS AFFECTED

a. CAGE

b. DOCUMENT NO.

c. TITLE/NOMENCLATURE/NAME d.

CURRENT

REVISION

e.

NOR

NO.

17. BASELINE AFFECTED:

18. IN PRODUCTION:

21a. COST IMPACT FROM ECP?

21b. RETROFIT EXISTING ASSETS?

22. CONTRACT

23. CONTRACTING OFFICER

24. ORIGINATOR

25. BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY

a. RECOMMENDATIONS:

26a. DISPOSITION: (Configuration Approval Authority)

27. ACTIVITY ACCOMPLISHING REVISION AND DATE OF REVISION

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 2

(For use if Block 17 is functional or allocated.)

EFFECTS ON FUNCTIONAL/ALLOCATED CONFIGURATION DOCUMENTATION

28. OTHER EXTERNAL SYSTEMS OR EXTERNAL

CONFIGURATION ITEMS AFFECTED:

29. OTHER SUPPLIERS / ACTIVITIES AFFECTED:

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3

(This page for use as necessary)

(X)

EFFECTS ON ENGINEERING, SUPPORT, AND OTHER PRODUCT ATTRIBUTES

FACTOR

ENCL.

PAR.

(X)

FACTOR

ENCL.

PAR.

37. EFFECT ON SYSTEMS ENGINEERING DESIGN CONSIDERATIONS

38. EFFECT ON INTEGRATED PRODUCT SUPPORT ELEMENTS

g. Demilitarization & Disposal

f. Critical Safety Item (CSI)

e. Corrosion Prevention and Control

d. Commercial-Off-the-Shelf (COTS)

c. Anti-Counterfeiting

b. Affordability

a. Accessibility

m. Interoperability & Dependency

l. Intelligence

k. Insensitive Munitions

j. Human Systems Integration (HSI)

i. Environment, Safety, and

Occupational Health (ESOH)

h. Diminishing Manufacturing Sources

& Material Shortages (DMSMS)

v. System Security Engineering

w. Electromagnetic Interference

u. Survivability

t. Standardization

s. Spectrum Management

r. Reliability & Maintainability (R&M)

q. PHS&T

p. Operational Energy

o. Open Systems Architecture (OSA)

n. Item Unique Identification (IUID)

39. EFFECT ON OTHER PRODUCT ATTRIBUTES

f. Packaging, Handling, Storage, and

Transportation (PHS&T)

e. Maintenance Planning & Mgmt

d. Supply Support

c. Sustaining Engineering

b. Design Interface

a. Product Support Management

l. Computer Resources

k. Facilities & Infrastructure

j. Manpower & Personnel

i. Training & Training Support

h. Support Equipment

g. Technical Data

g. Warranty/Guarantee

f. Other Equipment

e. Activation/Deployment Schedule

d. Operating Procedures

c. Service Life

b. Certifications

a. Performance

43. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS

45a. THIS CHANGE IS TO BE ACCOMPLISHED:

46. IS SUPPLIER FIELD SERVICE ENGINEERING REQUIRED?

49. DATE ACQUIRER APPROVAL NEEDED FOR: (DD Mmm YYYY)

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 4

ESTIMATED NET TOTAL COST IMPACT

50. ESTIMATED NET TOTAL COST IMPACT (Use parentheses for savings)

FACTOR

COSTS/SAVINGS UNDER CONTRACT

Non-Recurring

(a)

RECURRING

Unit

(b)

Quantity

(c)

Total (Recurring)

(d)

Total

(e)

Other Costs/

Savings to the

Acquirer

(f)

a. PRODUCTION COSTS / SAVINGS

(1) CONFIGURATION ITEM / CSCI

(2) FACTORY TEST EQUIPMENT

(3) SPECIAL FACTORY TOOLING

(4) SCRAP

(5) ENGINEERING, ENGINEERING DATA REVISION

(6) REVISION OF TEST PROCEDURES

(7) QUALIFICATION OF NEW ITEMS

(8) SUBTOTAL OF PROD COSTS/SAVINGS

b. RETROFIT COSTS

(1) ENGINEERING DATA REVISION

(2) PROTOTYPE TESTING

(3) KIT PROOF TESTING

(4) RETROFIT KITS FOR OPERATIONS SYSTEMS

(5) PREP OF MWO / TCTO / SC / ALT / TD

(6) SPECIAL TOOLING FOR RETROFIT

(7) INSTALLATION - SUPPLIER PERSONNEL

(8) INSTALLATION - ACQUIRER PERSONNEL

(9) TESTING AFTER RETROFIT

(10) MODIFICATION OF GFE/GFP

(11) QUALIFICATION OF GFE/GFP

(12) SUBTOTAL OF RETROFIT COSTS/SAVINGS

c. INTEGRATED PRODUCT SUPPORT COSTS

(1) PRODUCT SUPPORT MANAGEMENT

(2) DESIGN INTERFACE

(3) SUSTAINING ENGINEERING

(4) SUPPLY SUPPORT

(5) MAINTENANCE PLANNING & MANAGEMENT

(6) PACKAGING, HANDLING, STORAGE &

TRANSPORTATION (PHS&T)

(7) TECHNICAL DATA

(8) SUPPORT EQUIPMENT

(9) TRAINING & TRAINING SUPPORT

(10) MANPOWER & PERSONNEL

(11) FACILITIES & INFRASTRUCTURE

(12) COMPUTER RESOURCES

(13) OTHER

(14) SUBTOTAL OF IPS COSTS/SAVINGS

d. OTHER COSTS / SAVINGS

e. SUBTOTAL COSTS / SAVINGS

(1) SUBTOTAL UNDER CONTRACT

f. COORDINATION OF CHANGES WITH OTHER SUPPLIERS

g. COORDINATION CHANGES BY ACQUIRER

h. ESTIMATED NET TOTAL COSTS/SAVINGS

ENGINEERING CHANGE PROPOSAL(ECP), PAGE 5

ESTIMATED COSTS/SAVINGS SUMMARY, RELATED ECPs

51. ESTIMATED COSTS / SAVINGS SUMMARY, RELATED ECPs (Use parentheses for savings)

CAGE CODE

(a)

ECP NUMBER

(b)

COSTS/SAVINGS

UNDER CONTRACTS

(c)

OTHER

COSTS/SAVINGS

TO ACQUIRER

(d)

a. PRODUCTION COSTS / SAVINGS (Subtotal of Costs

/Savings Elements from Page 4, 50a. applicable to aircraft, ship, tank, vehicle, missile or its subsystem)

(1) SUBTOTAL PRODUCTION COSTS / SAVINGS

b. RETROFIT COSTS (Applicable to aircraft, ship tank, vehicle, missile or its subsystem)

(1) SUBTOTAL RETROFIT COSTS

c. INTEGRATED PRODUCT SUPPORT

COSTS/SAVINGS REVISED REQUIREMENTS

(1) ITEM RETROFIT (If not covered under "b") (Applicable to aircraft, ship, tank, missile or its subsystem)

(2) IPS SUBTOTAL (Applicable to aircraft, ship tank, mission or its subsystem)

(3) OPERATOR TRAINER (Net total cost/savings from each ECP covering Operator trainer)

(4) MAINTENANCE TRAINER (Net total cost/savings from each ECP covering maintenance trainer)

(5) OTHER TRAINING EQUIPMENT

(6) SUPPORT EQUIPMENT (Net total cost/savings from each ECP on support equipment)

(7) IPS PLANS

(8) MAINTENANCE CONCEPT, PLANS, SYSTEM

DOCUMENTS

(9) INTERIM SUPPORT PLAN

NEW REQUIREMENTS

CAGE

CODE

NON-

RECURRING

COSTS

RECURRING COSTS

UNIT

QTY

TOTAL

(10) PROVISIONING DOCUMENTATION

(11) OPER TRNR/TRNG DEVICES/EQUIP

(12) MANUALS/SPARES, REPAIR PARTS

(For (11))

(13) MAINTENANCE TRNR/TRNG DEVICES/

EQUIPMENT

(14) MANUALS/SPARES, REPAIR PARTS

(for (13))

(15) SUPPORT EQUIPMENT

(16) MANUALS (for (15))

(17) PROVISIONING DOCUMENTATION (For (15))

(18) REPAIR PARTS (for (15))

(19) SUBTOTAL FOR IPS COSTS / SAVINGS

(Sum of 51C (1) through (18))

d. OTHER COSTS / SAVINGS

(Total from Page 4, 50d., or related ECPs)

CAGE CODE

ECP NUMBER

(1) TOTAL OTHER COSTS / SAVINGS

(2) SUBTOTALS OF COLUMNS (A + B + C + D)

(3) SUBTOTAL UNDER CONTRACT

e. ESTIMATED NET TOTAL COSTS / SAVINGS

ENGINEERING CHANGE PROPOSAL (ECP) (HARDWARE), PAGE 6

55. DATE AUTHORIZATION TO PROCEED

RECEIVED BY SUPPLIER (DD Mmm YYYY)

INDICATE START DELIVERY WITH AN "S", COMPLETION DELIVERY WITH A "C", PROGRESS POINT WITH A "P".

NO. OF MONTHS

a. CONFIGURATION ITEM

(1) Production

(2) Tech Manuals

(3) Retrofit

(4) MWO/TCTO/SC/ALT/TD

(5) Spares/Repair Parts

b. SUPPORT EQUIPMENT

(1) Production

(2) Tech Manuals/Prog. Tapes

(3) Retrofit

(4) MWO/TCTO/SC/ALT/TD

(5) Repair Parts

c. TRAINER

(1) Operator

(2) Maintenance

NO. OF MONTHS

ENGINEERING CHANGE PROPOSAL (ECP) (SOFTWARE), PAGE 7

59. DATE AUTHORIZATION TO PROCEED

RECEIVED BY SUPPLIER (DD Mmm YYYY)

INDICATE START DELIVERY WITH AN "S", COMPLETION DELIVERY WITH A "C", PROGRESS POINT WITH A "P".

NO. OF MONTHS

a. CONFIGURATION ITEM

(1) Software Engineering

(2) Software Documentation

(3) Software Replication

(4) Software Distribution

(5)

b. SUPPORT EQUIPMENT

(1) Software Engineering Environment

Upgrade

(2) Software Test Environment Upgrade

(3)

c. TRAINER

(1) Operator

(2) Maintenance

(3)

NO. OF MONTHS

11.0.1.20130826.2.901444.899636

DD Form 1692, "Engineering Change Proposal (ECP)"

List Of Attachments

CurrentPage:

PageCount:

Enter the date prepared using the format DD MMM YYYY.:

Enter ECP number.:

Enter ECP revision.:

Enter procuring activity number.:

Enter distribution statement.:

Enter Title of Change:

Check Major (Class I):

Enter Minor (Class II):

Check E-Emergency:

Check U-Urgent:

Check R-Routine:

Check P-Preliminary:

formal:

Check B-Interface:

Check C-Compatibility:

Check D-Correction of Deficiency:

Check O-Operational or Logic Support:

Check P-Production Stoppage:

Check R-Cost Reduction:

Check S-Safety:

Check V-Value Engineering:

Check A-Administrative:

Enter Description of Change:

Enter Need for change:

Enter top-level item name and designation:

Enter high-level item name and designation:

Enter Name and Designation :

Enter Part Number:

Enter NSN:

Enter Item Name and Designation:

Enter Part Number:

Enter NSN:

Enter Alter, Add, or Remove:

Enter List of External Systems or External Configuration Items Affected:

Enter CAGE:

Enter Document number:

Enter Title/Nomenclature/Name:

Enter Current Revision:

Enter NOR Number:

Enter Y or N (yes or no) for Revised Document Attached:

Select to remove a row.:

Add:

Check Functional: 0

Check Allocated: 0

Check Product: 0

Check Yes In Production:

Check No, not In Production:

Check Yes for Cost Impact From ECP:

Check No for Cost Impact From ECP :

Enter Production Effectivity (quantity, Lot Number, Serial Number, Date):

Enter Effect on Delivery Schedule:

If Block 21A is Yes, enter Include References:

Check yes for retrofit existing assets:

Check no for retrofit existing assets:

(If 21b is Yes, Enter Retrofit Effectivity Information, If 21B is No Enter N/A) :

If 21b is Yes, Enter Retrofit Delivery Schedule Information, If 21B is No Enter N/A) :

Enter Supplier:

Enter Contract Number/Line Item:

Enter Contracting Officer Name:

Enter Contracting Officer Telephone number:

Enter Contracting Officer E-mail:

Enter Originator Name:

Enter CAGE code.:

Enter Originator Telephone:

Enter Originator E-mail:

Enter Originator Address (street, city, state, zip code):

Enter Originator Submitting Activity:

Enter Originator Authorized Signature:

Enter authorizing official's Name and Title:

Check for approval:

Check for disapproval:

Check for approval with modification:

Enter Name and Title:

Enter the date signed using the format DD MMM YYYY.:

Enter Signature:

Enter Comments:

Enter Name and Title:

Enter the date signed using the format DD MMM YYYY.:

Enter Signature:

Enter Comments:

Enter Name and Title:

Enter the date signed using the format DD MMM YYYY.:

Enter Signature:

Select to add new attachment:

Select to view selected attachment:

Select to remove selected attachment:

Enter List of Attachment by clicking Add Attachment:

Enter other external systems or external configuratio items affected:

Enter other suppliers/activities affected:

Enter configuration items affected:

Enter effects on performance allocations and interfaces in system specification:

Enter effects on staffing, integrated logistics support, training, operational effectiveness, or software:

Enter effects on configuration item specifications:

Enter developmental requirements and status:

Enter trade-offs and alternative solutions:

Enter date by which contractual authority is needed in format DD MMM YYYY:

Check for Demilitarization & Disposal: 0

Check for Critical Safety Item (CSI): 0

Enter ENCL.:

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Corrosion Prevention and Control: 0

Check for Commercial-Off-the-Shelf (COTS): 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for anti-counterfeiting: 0

Check for affordability: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Accessibility: 0

Check for Interoperability & Dependency: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Intelligence: 0

Check for Insensitive Munitions: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Human Systems Integration (HSI): 0

Check for : 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Diminishing Manufacturing Sources & Material Shortages (DMSMS): 0

Check for Other: 0

Check for Other: 0

Enter ENCL.:

Enter PAR.:

Enter other:

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for System Security Engineering: 0

Check for Survivability: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Standardization: 0

Check for Spectrum Management: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Reliability & Maintainability (R&M): 0

Check for PHS&T: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Operational Energy: 0

Check for Open Systems Architecture (OSA): 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Item Unique Identification (IUID): 0

Check for Packaging, Handling, Storage, and Transportation (PHS&T): 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Maintenance Planning & Mgmt: 0

Check for Supply Support: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Sustaining Engineering: 0

Check for Design Interface: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Product Support Management: 0

Enter other:

Check for Other: 0

Check for Computer Resources: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Facilities & Infrastructure: 0

Check for Training & Training Support: 0

Check for Manpower & Personnel : 0

Enter ENCL.:

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Enter ENCL.:

Check for Support Equipment: 0

Check for Technical Data: 0

Check for Other: 0

Enter other:

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Warranty/Guarantee: 0

Check for Other Equipment: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Activation/Deployment Schedule: 0

Check for Operating Procedures: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Service Life: 0

Check for Certifications: 0

Enter ENCL.:

Enter PAR.:

Enter PAR.:

Enter ENCL.:

Check for Performance: 0

Enter PAR.:

Enter ENCL.:

Enter alternate solutions:

Enter developmental status:

Enter recommendations for retrofit:

Enter organization:

Enter iintermediate:

Enter depot:

Enter other:

Enter work-hours to conduct system tests after retrofit:

Check if this change is to be accomplished before the following changes: 0

Check if this change is to be accomplished with the following changes: 0

Check if this change is to be accomplished after the following changes: 0

Check yes, supplier field service engineering required:

Check no, supplier field service engineering not required:

Enter out of service time :

Enter external changes:

Enter effect of this ECP and previously approved ECPs on item:

Enter the date acquirer approval needed for retrofit using the format DD MMM YYYY.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Enter recurring costs/savings under contract quantity for respective factor.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter non-recurring costs/savings under contract for respective factor.:

Enter recurring costs/savings under contract unit for respective factor.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Automatically calculated.:

Enter non-recurring costs/savings under contract for respective factor.:

d0d:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Enter other costs/savings to the acquirer for respective factor.:

Enter other costs/savings to the acquirer for respective factor.:

Enter other costs/savings to the acquirer for respective factor.:

Automatically calculated.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Enter CAGE code.:

Enter ECP number.:

Enter costs/savings under contracts.:

Enter other costs/savings to acquirer.:

Enter other costs/savings to acquirer.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Automatically calculated.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Enter CAGE code.:

Enter non-recurring costs.:

Enter recurring costs unit.:

Enter recurring costs quantity.:

Recurring costs total is automatically calculated.:

Automatically calculated.:

Enter other costs/savings to acquirer.:

Automatically calculated.:

Automatically calculated.:

Enter CAGE code.:

Enter ECP number.:

d0c:

Enter other costs/savings.:

Enter CAGE code.:

Enter ECP number.:

dRow1c:

dRow1d:

Enter other costs/savings.:

Enter CAGE code.:

Enter ECP number.:

dRow2c:

dRow2d:

Enter other costs/savings.:

Enter CAGE code.:

Enter ECP number.:

dRow3c:

dRow3d:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Automatically calculated.:

Enter subtotal costs/savings under contract.:

Enter subtotal under contract for other costs/savings to acquirer.:

Automatically calculated.:

Enter CSCI nomenclature.:

Enter title of change.:

Enter the date authorization to proceed received by supplier using the format DD MMM YYYY.:

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

rowNo1: ( 6 ) rowNo1: ( 6 )

Enter row title.:

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Select to add a row.:

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or progress point with "P.":

Indicate start delivery with an "S," completion delivery with a "C," or…