RFP_W52P1J-16-R-0134_Amendment_0002.pdf

PDF 17 KB Posted

Attached to
60mm, 81mm, 120mm Mortar Propelling Charges
Solicitation number
W52P1J-16-R-0134
Issued by

About this file

RFP W52P1J-16-R-0134 Amendment 0002

View the file

Other files

File Type Posted
Attachment_0031__MINIMUM_GUARANTEED_AMOUNT_FOR_60_81_120MM_MORTAR_PROPELLING_CHARGES.pdf PDF
Attachment_0032__SCHEDULE.pdf PDF
Solicitation_W52P1J-16-R-0134_Amendment_0005.pdf PDF
RFP_W52P1J-16-R-0134_Amendment_0004.pdf PDF
RFP_W52P1J-16-R-0134_Amendment_0003.pdf PDF
RFP_W52P1J-16-R-0134_Amendment_0001.pdf PDF
Attachment_0020__52.246-4520_DRAWING_NUMBER_LISTING.PDF PDF
Attachment_0019__52.246-4520_END_ITEM_COMPONENT_LISTING.PDF PDF
Attachment_0020__52.246-4520_DRAWING_NUMBER_LISTING.PDF PDF
Attachment_0019__52.246-4520_END_ITEM_COMPONENT_LISTING.PDF PDF
Request_for_Proposal_(RFP)_W52P1J-16-R-0134_Amendment_0001.pdf PDF
Attachment_0001__PRICE_MATRIX.xlsx XLSX spreadsheet
Attachment_0011__ASC_FORM_715-7_-_HAZARDOUS_MATERIAL_FORM.pdf PDF
Attachment_0021__RECOMMENDATION_FOR_CHARGE_ESTABLISHMENT_&_UNIFORMITY_CALCULATIONS.pdf PDF
Attachment_0008__DD1695_-_NOTICE_OF_REVISION_(NOR).pdf PDF
Attachment_0017__SECURITY_STATEMENT_OF_WORK_-_PHYSICAL_SECURITY_STANDARDS_FOR_DOD_SECURITY_RISK_CATEGORY_III_IV_AMMUNITION_AND_EXPLOSIVES_(A&E)_AT_COCO_FACILITIES.pdf PDF
Attachment_0013__GUIDANCE_ON_DOCUMENTATION_OF_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL).pdf PDF
Attachment_0012__INSTRUCTIONS_FOR_COMPLETING_FORM_1423.pdf PDF
Attachment_0005__ADDRESS_LIST.pdf PDF
Attachment_0020__52.246-4520_DRAWING_NUMBER_LISTING.pdf PDF
Exhibit_F__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_81MM_M220_PROPELLING_CHARGE.pdf PDF
Attachment_0009__U.S._GOVERNMENT_POINT_OF_CONTACT_LISTING.pdf PDF
Attachment_0003__OPSEC_AQUISITION_PLAN.pdf PDF
Exhibit_G__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_120MM_M234A1_PROPELLING_CHARGE.pdf PDF
Exhibit_E__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_81MM_M219_PROPELLING_CHARGE.pdf PDF
Attachment_0019__52.246-4520_END_ITEM_COMPONENT_LISTING.pdf PDF
RFP_W52P1J-16-R-0134.pdf PDF
Exhibit_B__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_60MM_M235_PROPELLING_CHARGE.pdf PDF
Exhibit_D__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_81MM_M218_PROPELLING_CHARGE.pdf PDF
Attachment_0007__DD1694_-_REQUEST_FOR_VARIANCE_(RFV).pdf PDF
Attachment_0018__STATEMENT_OF_WORK_FOR_INERT_PROPELLING_CHARGES.pdf PDF
Attachment_0002__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Attachment_0010__STATISTICAL_PROCESS_CONTROL_(SPC)_TABLES.pdf PDF
Attachment_0006__DD1692_-_ENGINEERING_CHANGE_PROPOSAL_(ECP).pdf PDF
Exhibit_C__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_60MM_M236_PROPELLING_CHARGE.pdf PDF
Exhibit_A__CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_-_60MM_M204_PROPELLING_CHARGE.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2017JUN29

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

GEORGE R. LINGRIS

EMAIL: GEORGE.R.LINGRIS.CIV@MAIL.MIL

W52P1J-16-R-0134

2017MAY17

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 5

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: GEORGE R. LINGRIS

Buyer Office Symbol/Telephone Number: CCRC-AC/(309)782-3855

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0002 to Solicitation W52P1J-16-R-0134 is to complete the following:

1. Provide answers to the following questions that have been received by the U.S. Government:

Question 1 - H.1.7. (Page 62 of the Request for Proposal) states "...no protest under Federal Acquisition Regulation (FAR) Subpart

33.1 is authorized in connection with the issuance or proposed issuance of a delivery order except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract or exceeds $25 million." In the previous prop charge contract that number was not to exceed $10 million. What was the driving factor in increasing the dollar amount referenced above from $10 million to $25 million?

Answer 1 - The change is a result of the 2017 National Defense Authorization Act which was signed into law on December 23, 2016 and increased the threshold of protests against task/delivery orders from $10 million to $25 million. FAR 16.505(a)(10)(i)(B) has not yet been updated to reflect this change. The following links contain information about the change:

https://www.congress.gov/114/bills/s2943/BILLS-114s2943enr.pdf#page=286 http://www.procurementplaybook.com/2017/01/major-changes-to-gaos-bid-protest-jurisdiction-over-task-order-awards/

Question 2 - Reducing the Integrated Master Schedule (IMS) to fit on 8-1/2" x 11" or 8-1/2" x 14" paper requires scaling the font size to under 8 point (pt.). Will a font size smaller than 8 pt. for the IMS still fall within the requirement of the solicitation?

Answer 2 - It is acceptable for the offeror to use a larger sized paper to maintain the 8 pt. font size.

Question 3 - Is there a moisture content test to be performed on the trays referenced in Drawing 9298927 (60mm), Drawing 9298796

(81mm) and Drawing 12952055 (120mm)?

Answer 3 - Please refer to MIL-P-60312 from the Technical Data Package List (TDPL) for further guidance.

Question 4 - What is the cost to the contractor for the services of the Government Proving Ground and their involvement in the

Velocity Test, the Charge Establishment Test and the Uniformity Test? If the cost is unknown, can a contact name and number be provided so the cost can be requested?

Answer 4 - The offeror will need to work with Yuma Proving Ground to develop the cost for this effort (Point of Contact: Mr. Arturo

Anaya, Phone Number: 928-328-6134).

Question 5 - Notice of Revision (NOR) R17K2002 #3 refers to Drawing 12577583 Revision (Rev.) G. It is not listed on the TDPL and there is not a copy of the drawing available. Can a copy be provided?

Answer 5 - Drawing 12577583 Rev. G will be provided as Attachment 0022 and 0023 and can be accessed via the solicitation's Federal

Business Opportunities (FBO) website link.

Question 6 - L.3.3.1 on Page 100 of the solicitation states "Font smaller than 12 point is ONLY acceptable in graphics, sketches, charts, and the price matrix." Can tables be included in the group of exclusions to the 12 point font requirement?

Answer 6 - Yes, tables may be excluded. The font for tables should be no less than 8 point.

Question 7 - L.4.1.2. Option 2 on page 101 of the solicitation states VOL. 1 - Technical "shall not exceed 100 pages combined for the three sub-factors under the Technical proposal." Is this 100 pages for each Contract Line Item Number (CLIN) Group or 100 pages total for CLIN Groups A, B, & C?

Answer 7 - The 100 page limit applies to all CLIN groups (Groups A, B, & C) combined.

Question 8 - Due to the details necessary to meet the IMS requirement of this solicitation, can the IMS be excluded from the page count limit of 20 pages for Sub-factor 3: Management Plan?

2 5

W52P1J-16-R-0134 0002

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Answer 8 - The U.S. Government non-concurs with this request. The IMS will count toward the 20 page limit.

Question 9 - L.3.4.1 Volume 3 Past Performance states Volume 3 "shall be submitted in accordance with the following format: Cover

Page, Solicitation Number, Offeror Name, CAGE and DUNS - one page limit," however, there is no reference to a table of contents or acronyms page. Is it acceptable to include Table of Contents and Acronyms pages in this volume?

Answer 9 - Yes, please include a Table of Contents and Acronyms page in this volume.

Question 10 - NOR R16J2020 #1 refers to Drawing 1300861 Rev. E. The TDPL refers to Rev. D, which was also provided. Please confirm the correct revision and if Rev. E, can the drawing be provided?

Answer 10 - Drawing 13008610 Rev. E will be provided as Attachment 0024 and can be accessed via the solicitation's FBO link. There are two ECPs on this contract that changed this drawing. NOR R16J2006 changes the drawing to Rev. E and NOR R16J2020 changes it further.

Question 11 - NOR R16J2020 #3 refers to Drawing 12982841 Rev. M. The TDPL refers to Rev. L, which was also provided. Please confirm the correct revision and if Rev. M, can the drawing be provided?

Answer 11 - Drawing 12982841 Rev. M will be provided as Attachment 0025 and can be accessed via the solicitation's FBO website link.

There are two Engineering Change Proposals (ECPs) on this contract that changed this drawing. NOR R16J2006 changes the drawing to

Rev. M and NOR R16J2020 changes it further.

Question 12 - NOR R16J2020 #4 refers to Drawing 9378134 Rev. Y. The TDPL refers to Rev. W, which was also provided. Please confirm the correct revision and if Rev. Y, can the drawing be provided?

Answer 12 - Drawing 9378134 Rev. Y will be provided as Attachment 0026 and can be accessed via the solicitation's FBO website link.

There are two ECPs on this contract that changed this drawing. NOR R16J2006 changes the drawing to Rev. Y and NOR R16J2020 changes it further.

Question 13 - NOR R16J2020 #5 refers to Drawing 9381510 Rev. Y. The TDPL refers to Rev. W, which was also provided. Please confirm the correct revision and if Rev. Y, can the drawing be provided?

Answer 13 - Drawing 9381510 Rev. Y will be provided as Attachment 0027 and can be accessed via the solicitation's FBO website link.

There are two ECPs on this contract that changed this drawing. NOR R16J2006 changes the drawing to Rev. Y and NOR R16J2020 changes it further.

Question 14 - NOR R16J2020 #6 refers to Drawing 9300234 Rev. W. The TDPL refers to Rev. V, which was also provided. Please confirm the correct revision and if Rev. W, can the drawing be provided?

Answer 14 - Drawing 9300234 Rev. W will be provided as Attachment 0028 and can be accessed via the solicitation's FBO website link.

There are two ECPs on this contract that changed this drawing. NOR R16J2006 changes the drawing to Rev. W and NOR R16J2020 changes it further.

Question 15 - NOR R16J2020 #7 refers to Drawing 13038372 Rev. B. The TDPL refers to Rev. A, which was also provided. Please provide the correct revision and if Rev. B, can the drawing be provided?

Answer 15 - Drawing 13038372 Rev. B will be provided as Attachment 0029 and can be accessed via the solicitation's FBO website link.

There are two ECPs on this contract that changed this drawing. NOR R16J2006 changes the drawing to Rev. B and NOR R16J2020 changes it further.

Question 16 - NOR R17K2002 #2 refers to Drawing 9313721 Rev. Y. The TDPL refers to Rev. W, which was also provided. Please confirm the correct revision and if Rev. Y, can the drawing be provided?

Answer 16 - Drawing 9313721 Rev. Y will be provided as Attachment 0030 and can be accessed via the solicitation's FBO website link.

There are two ECPs on this contract that changed this drawing. NOR R16K2021 changes the drawing to Rev. Y and NOR R17K2002 changes it further.

Question 17 - As the U.S. Government wanted all Contract Action Reports (CARs) and all CAR responses to be copied directly into the offeror responses, what should be done when the font provided in the CAR and/or response does not fall into the qualifications of the solicitation? Should changes be made to the CARs and/or CAR responses in order to meet the font specifications or should the

CARs and CAR responses be copied directly as they are?

Answer 17 - CARs can be submitted in their initial/current format and do not need to be reformatted.

3 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

2. All other terms and conditions remain unchanged.

*** END OF NARRATIVE A0003 ***

4 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0022 DRAWING 12577583 REVISION G SHEET 1 02-JUL-2014 001

Attachment 0023 DRAWING 12577583 REVISION G SHEET 2 02-JUL-2014 001

Attachment 0024 DRAWING 13008610 REVISION E 28-JUL-2016 001

Attachment 0025 DRAWING 12982841 REVISION M 28-JUL-2016 001

Attachment 0026 DRAWING 9378134 REVISION Y 28-JUL-2016 001

Attachment 0027 DRAWING 9381510 REVISION Y 28-JUL-2016 001

Attachment 0028 DRAWING 9300234 REVISION W 28-JUL-2016 001

Attachment 0029 DRAWING 13038372 REVISION B 28-JUL-2016 001

Attachment 0030 DRAWING 9313721 REVISION Y 11-MAY-2016 001

5 5

SECTION A
SECTION J

File details come from the government source that posted it. Updated .