Attachment_0014-3_DD_Form_1692_ECP(pg3).pdf

DoD Form PDF 108 KB Posted

Attached to
Expeditionary Shelter Protection System (ESPS)
Solicitation number
W911QY-16-R-0003
Issued by

About this file

Attachment 0014-3_DD Form 1692_ECP(pg3)

View the file

Other versions and copies of DD Form 1692

File Revision Posted Attached to
Section J-13I DD Form 1692 Engineering Change Proposal.pdf Revision not stated Homeland Security Cutter - Light Icebreaker (HSC-L) Solicitation
ATT 0008 DD 1692 EngineeringChangeProposal (ECP).pdf Revision not stated Quick Disconnect Mechanism Assembly LH, RH
Attachment 0005 DD1692 ENGINEERING CHANGE PROPOSAL.docx Revision not stated 60mm (M204, M235, M236); 81mm (M218, M219, M220, M658); and 120mm (M234A1) Propelling Charges
Attachment 0002 DD Form 1692.pdf Revision not stated Type I Family of All Terrain Crane Solicitation Amendment 0009
Attachment 0003 _ DD Form 1692.pdf Revision not stated Type I Family of All Terrain Crane Draft Section C (Scope of Work); Draft Attachments, and Draft Contract Data Requirement Lists (CDRLs)
Attach_0004_-_DD1692_Engineering_Change_Proposal_(ECP).pdf Revision not stated MK3 MOD 0 and MK12 MOD 1 Pallet
Attach_0004_-_DD1692_Engineering_Change_Proposal_(ECP).pdf Revision not stated MK3 MOD 0 & MK12 MOD 1 PALLET
Attachment_0006__DD1692_-_ENGINEERING_CHANGE_PROPOSAL_(ECP).pdf Revision not stated 60mm, 81mm, 120mm Mortar Propelling Charges
dd1692-Instruction.pdf Revision not stated BOMB FUZE PROTECTION ASSEMBLY
dd1692_ECP.pdf Revision not stated BOMB FUZE PROTECTION ASSEMBLY
Attachment_0007_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION, OVER 30MM UP TO 75MM
Attachment_0014-6_DD_Form_1692_ECP(pg6).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-5_DD_Form_1692_ECP(pg5).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-7_DD_Form_1692_ECP(pg7).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-4_DD_Form_1692_ECP(pg4).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-2_DD_Form_1692_ECP(pg2).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0014-1_DD_Form_1692_ECP(pg1).pdf Revision not stated Expeditionary Shelter Protection System (ESPS)
Attachment_0003_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION AND NUCLEAR ORDNANCE BOXES, PACKAGES AND SPECIAL CONTAINERS
Attachment_0017_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf Revision not stated AMMUNITION, OVER 30MM UP TO 75MM
Show all 19

Who attaches DD Form 1692

Other files

File Type Posted
Attachment_0022_ESPS_Solicitation_Q&A_Revised_05Jan17.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_04Jan17.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0007.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0007.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_22Dec16.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised.pdf PDF
Attachment_0021_Past_Performance_Questionnaire.docx DOCX document
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0006.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0006.pdf PDF
Attachment_0023_5-10-2020_ESPS_REVD_Revised_13Dec16.pdf PDF
Attachment_0024_5-10-2021_SUPPORT_STRUT_ESPS_REVC_Revised_13Dec16.pdf PDF
Attachment_0025_5-10-2022_U-STRUT_HANDLE_ESPS_REVA_Revised_13Dec16.pdf PDF
Attachment_0026_5-10-2023_BLAST_PANEL_ESPS_REVD_Revised_13Dec16.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_13Dec16.pdf PDF
Attachment_0027_5-10-0208_Ground_Anchor_Bracket_REVA_Added_13Dec16.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0005.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_6Dec16.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0005.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A_Revised_15Nov16.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A_Revised_8Nov16.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0004.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0004.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0003.pdf PDF
Attachment_0024_5-10-2021_SUPPORT_STRUT_ESPS_Revised_4Nov2016.PDF PDF
Attachment_0025_5-10-2022_U-STRUT_HANDLE_ESPS_Revised_4Nov2016.PDF PDF
Attachment_0023_5-10-2020_ESPS_Revised_4Nov2016.PDF PDF
Attachment_0001_MIL-PRF-32521A_Revised_1Nov2016.pdf PDF
Attachment_0026_5-10-2023_BLAST_PANEL_ESPS_Revised_4Nov2016.PDF PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0003.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A_Revised_4Nov16.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0002.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0002.pdf PDF
Attachment_0001_MIL-PRF-32521A_18Oct2016.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0001.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A.pdf PDF
Attachment_0025_5-10-2022_U-STRUT_HANDLE_ESPS.PDF PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0001.pdf PDF
Attachment_0023_5-10-2020_ESPS.PDF PDF
Attachment_0026_5-10-2023_BLAST_PANEL_ESPS.PDF PDF
Attachment_0024_5-10-2021_SUPPORT_STRUT_ESPS.PDF PDF
W911QY-17-R-0003_ESPS_Solicitation.pdf PDF
A018_ESPS_PCA_Summary_Report_22_May_2015.pdf PDF
A003_ESPS_MAC_14_May_2015.pdf PDF
Attachment_0007_ESPS_NET_SOW_26_May_2015.pdf PDF
A010_ESPS_NMWR_12_May_2015.pdf PDF
A017_ESPS_FAT_Plan_and_Report_22_May_2015.pdf PDF
Attachment_0010_DI-NDTI-80566A_Test_Plan.pdf PDF
Attachment_0002_ESPS_Provisioning_SOW_14_May_2015.pdf PDF
A019_ESPS_LAT_Plan_and_Report_22_May_2015.pdf PDF
Show 40 more

Latest 50 of 100 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

50. DATE CONTRACTUAL AUTHORITY NEEDED FOR(DD-MMM-YYYY)

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3

(This page for use as necessary.)

EFFECTS ON PRODUCT CONFIGURATION DOCUMENTATION, LOGISTICS AND OPERATIONS

(X)

o. PROVISIONING DATA

FACTOR

a. PERFORMANCE

b. WEIGHT-BALANCE-STABILITY (Aircraft)

c. WEIGHT-MOMENT (Other equipment)

d. CDRL, TECHNICAL DATA

e. NOMENCLATURE

a. ILS PLANS

b. MAINTENANCE CONCEPTS, PLANS AND

PROCEDURES

c. LOGISTICS SUPPORT ANALYSES

d. INTERIM SUPPORT PROGRAMS

e. SPARES AND REPAIR PARTS

f. TECH MANUALS

g. FACILITIES

h. SUPPORT EQUIPMENT

i. OPERATOR MANPOWER/TRAINING

j. OPERATOR TRAINING EQUIPMENT

k. MAINTENANCE MANPOWER/TRAINING

l. MAINTENANCE TRAINING EQUIPMENT

m. CONTRACT MAINTENANCE

n. PACKAGING, HANDLING, STORAGE, TRANSPORTABILITY

PAR. (X)

e. REWORK OF OTHER EQUIPMENT

f. SYSTEM TEST PROCEDURES

g. WARRANTY/GUARANTEE

h. PARTS CONTROL

i. LIFE CYCLE COSTS

FACTOR

39. EFFECTS ON OPERATIONAL

EMPLOYMENT

a. SAFETY

b. SURVIVABILITY

c. RELIABILITY

d. MAINTAINABILITY

e. SERVICE LIFE

f. OPERATING PROCEDURES

i. CRITICAL SINGLE POINT FAILURE ITEMS

j. INTEROPERABILITY

d. COMPUTER PROGRAMS AND RESOURCES

ENCL. PAR.

41. ALTERNATE SOLUTIONS

42. DEVELOPMENTAL STATUS

43. RECOMMENDATIONS FOR RETROFIT

a. ORGANIZATION

44. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS

b. INTERMEDIATE c. DEPOT d. OTHER

45. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT

g. ELECTROMAGNETIC INTERFERENCE

h. ACTIVATION SCHEDULE

40. OTHER CONSIDERATIONS

a. INTERFACE

b. OTHER AFFECTED EQUIPMENT/GFE/GFP

c. PHYSICAL CONSTRAINTS

ENCL.

37. EFFECT ON PRODUCT CONFIGURATION

DOCUMENTATION OR CONTRACT

46. THIS CHANGE MUST BE ACCOMPLISHED 48. OUT OF SERVICE TIME

a. PRODUCTION

b. RETROFIT

47. IS CONTRACTOR FIELD

SERVICE ENGINEERING

REQUIRED?BEFORE WITH AFTER THE FOLLOWING CHANGES

YES NO

38. EFFECT ON INTEGRATED LOGISTICS

SUPPORT (ILS) ELEMENTS

49. EFFECT OF THIS ECP AND PREVIOUSLY APPROVED ECP'S ON

ITEM

ECP NUMBER:

OMB No.

0704-0188

PAN:

DD FORM 1692/3, MAR 2013

DISTRIBUTION STATEMENT:

DD Form 1692/3, Engineering Change Proposal, Page 3, March 2013

WHS/ESD/IMD

50. DATE CONTRACTUAL AUTHORITY NEEDED FOR

(DD-MMM-YYYY)

ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3

(This page for use as necessary.)

EFFECTS ON PRODUCT CONFIGURATION DOCUMENTATION, LOGISTICS AND OPERATIONS

(X)

o. PROVISIONING DATA

FACTOR

a. PERFORMANCE

b. WEIGHT-BALANCE-STABILITY (Aircraft)

c. WEIGHT-MOMENT (Other equipment)

d. CDRL, TECHNICAL DATA

e. NOMENCLATURE

a. ILS PLANS

b. MAINTENANCE CONCEPTS, PLANS AND

PROCEDURES

c. LOGISTICS SUPPORT ANALYSES

d. INTERIM SUPPORT PROGRAMS

e. SPARES AND REPAIR PARTS

f. TECH MANUALS

g. FACILITIES

h. SUPPORT EQUIPMENT

i. OPERATOR MANPOWER/TRAINING

j. OPERATOR TRAINING EQUIPMENT

k. MAINTENANCE MANPOWER/TRAINING

l. MAINTENANCE TRAINING EQUIPMENT

m. CONTRACT MAINTENANCE

n. PACKAGING, HANDLING, STORAGE, TRANSPORTABILITY

PAR.

(X)

e. REWORK OF OTHER EQUIPMENT

f. SYSTEM TEST PROCEDURES

g. WARRANTY/GUARANTEE

h. PARTS CONTROL

i. LIFE CYCLE COSTS

FACTOR

39. EFFECTS ON OPERATIONAL

EMPLOYMENT

a. SAFETY

b. SURVIVABILITY

c. RELIABILITY

d. MAINTAINABILITY

e. SERVICE LIFE

f. OPERATING PROCEDURES

i. CRITICAL SINGLE POINT FAILURE ITEMS

j. INTEROPERABILITY

d. COMPUTER PROGRAMS AND RESOURCES

ENCL.

PAR.

41. ALTERNATE SOLUTIONS

42. DEVELOPMENTAL STATUS

43. RECOMMENDATIONS FOR RETROFIT

a. ORGANIZATION

44. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS

b. INTERMEDIATE

c. DEPOT

d. OTHER

45. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT

g. ELECTROMAGNETIC INTERFERENCE

h. ACTIVATION SCHEDULE

40. OTHER CONSIDERATIONS

a. INTERFACE

b. OTHER AFFECTED EQUIPMENT/GFE/GFP

c. PHYSICAL CONSTRAINTS

ENCL.

37. EFFECT ON PRODUCT CONFIGURATION

DOCUMENTATION OR CONTRACT

46. THIS CHANGE MUST BE ACCOMPLISHED

48. OUT OF SERVICE TIME

a. PRODUCTION

b. RETROFIT

47. IS CONTRACTOR FIELD

SERVICE ENGINEERING

REQUIRED?

BEFORE

WITH

AFTER THE FOLLOWING CHANGES

YES

NO

38. EFFECT ON INTEGRATED LOGISTICS

SUPPORT (ILS) ELEMENTS

49. EFFECT OF THIS ECP AND PREVIOUSLY APPROVED ECP'S ON

ITEM

ECP NUMBER:

OMB No.

0704-0188

PAN:

DD FORM 1692/3, MAR 2013

DISTRIBUTION STATEMENT:

Procuring Activity Number (PAN).:
Engineering Change Proposal (ECP) number.:
37. Effect on product configuration documentation or contract. X if a. Performance.: Off
Enclosure.:
Paragraph.:
X if b. Weight-balance-stability (aircraft).: Off
Enclosure.:
Paragraph.:
X if c. Weight-movement (other equipment).: Off
Enclosure.:
Paragraph.:
X if d. CDRL, technical data.: Off
Enclosure.:
Paragraph.:
X if e. Nomenclature.: Off
Enclosure.:
Paragraph.:
X if other.: Off
Other.:
Enclosure.:
Paragraph.:
38. Effect on Integrated Logistics Support (ILS) elements. X if a. ILS plans.: Off
Enclosure.:
Paragraph.:
X if b. Maintenance concepts, plans and procedures.: Off
Enclosure.:
Paragraph.:
X if c. Logistics support analyses.: Off
Enclosure.:
Paragraph.:
X if d. Interim support programs.: Off
Enclosure.:
Paragraph.:
X if e. Spares and repair parts.: Off
Enclosure.:
Paragraph.:
X if f. Tech manuals.: Off
Enclosure.:
Paragraph.:
X if g. Facilities.: Off
Enclosure.:
Paragraph.:
X if h. Support equipment.: Off
Enclosure.:
Paragraph.:
X if i. Operator manpower/training.: Off
Enclosure.:
Paragraph.:
X if j. Operator training equipment.: Off
Enclosure.:
Paragraph.:
X if k. Maintenance manpower/training.: Off
Enclosure.:
Paragraph.:
X if l. Maintenance training equipment.: Off
Enclosure.:
Paragraph.:
X if m. Contract maintenance.: Off
Enclosure.:
Paragraph.:
X if n. Packaging, handling, storage, transportability.: Off
Enclosure.:
Paragraph.:
X if o. Provisioning data.: Off
Enclosure.:
Paragraph.:
X if other, line 1.: Off
Other.:
Enclosure.:
Paragraph.:
X if other, line 2.: Off
Other.:
Enclosure.:
Paragraph.:
X if other, line 3.: Off
Other.:
Enclosure.:
Paragraph.:
39. Effects on operational employment. X if a. Safety.: Off
Enclosure.:
Paragraph.:
X if b. Survivability.: Off
Enclosure.:
Paragraph.:
X if c. Reliability.: Off
Enclosure.:
Paragraph.:
X if d. Maintainability.: Off
Enclosure.:
Paragraph.:
X if e. Service life.: Off
Enclosure.:
Paragraph.:
X if f. Operating procedures.: Off
Enclosure.:
Paragraph.:
X if g. Electromagnetic interference.: Off
Enclosure.:
Paragraph.:
X if h. Activation schedule.: Off
Enclosure.:
Paragraph.:
X if i. Critical single point failure items.: Off
Enclosure.:
Paragraph.:
X if j. Interoperability.: Off
Enclosure.:
Paragraph.:
X if other, line 1.: Off
Other.:
Enclosure.:
Paragraph.:
X if other, line 2.: Off
Other.:
Enclosure.:
Paragraph.:
X if other, line 3.: Off
Other.:
Enclosure.:
Paragraph.:
40. Other considerations. X if a. Interface.: Off
Enclosure.:
Paragraph.:
X if b. Other affected equipment/GFE/GFP.: Off
Enclosure.:
Paragraph.:
X if c. Physical constraints.: Off
Enclosure.:
Paragraph.:
X if d. Computer programs and resources.: Off
Enclosure.:
Paragraph.:
X if e. Rework of other equipment.: Off
Enclosure.:
Paragraph.:
X if f. System test procedures.: Off
Enclosure.:
Paragraph.:
X if g. Warranty/guarantee.: Off
Enclosure.:
Paragraph.:
X if h. Parts control.: Off
Enclosure.:
Paragraph.:
X if i. Life cycle costs.: Off
Enclosure.:
Paragraph.:
X if other, line 1.: Off
Other.:
Enclosure.:
Paragraph.:
X if other, line 2.: Off
Other.:
Enclosure.:
Paragraph.:
X if other, line 3.: Off
Other.:
Enclosure.:
Paragraph.:
X if other, line 4.: Off
Other.:
Enclosure.:
Paragraph.:
41. Alternate solutions.:
42. Developmental status.:
42. Recommendations for retrofit.:
44. Work-hours per unit to install retrofit kits. a. Organization.:
b. Intermediate.:
c. Depot.:
d. Other.:
44. Work-hours to conduct system tests after retrofit.:
47. Is contractor field service engineering required? X first box if yes, second if no.:
List changes.:
38. Out of service time.:
49. Effect of this ECP and previously approved ECPs on item.:
50. Date contractual authority needed for: a. Production (2 digit day-3 letter month-4 digit year).:
b. Retrofit.:
Distribution statement.:

File details come from the government source that posted it. Updated .