Attachment_0014-3_DD_Form_1692_ECP(pg3).pdf
DoD Form PDF 108 KB Posted
- Attached to
- Expeditionary Shelter Protection System (ESPS)
- Solicitation number
- W911QY-16-R-0003
About this file
Attachment 0014-3_DD Form 1692_ECP(pg3)
View the file
Other versions and copies of DD Form 1692
Show all 19
Who attaches DD Form 1692
Other files
Show 40 more
Latest 50 of 100 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
50. DATE CONTRACTUAL AUTHORITY NEEDED FOR(DD-MMM-YYYY)
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3
(This page for use as necessary.)
EFFECTS ON PRODUCT CONFIGURATION DOCUMENTATION, LOGISTICS AND OPERATIONS
(X)
o. PROVISIONING DATA
FACTOR
a. PERFORMANCE
b. WEIGHT-BALANCE-STABILITY (Aircraft)
c. WEIGHT-MOMENT (Other equipment)
d. CDRL, TECHNICAL DATA
e. NOMENCLATURE
a. ILS PLANS
b. MAINTENANCE CONCEPTS, PLANS AND
PROCEDURES
c. LOGISTICS SUPPORT ANALYSES
d. INTERIM SUPPORT PROGRAMS
e. SPARES AND REPAIR PARTS
f. TECH MANUALS
g. FACILITIES
h. SUPPORT EQUIPMENT
i. OPERATOR MANPOWER/TRAINING
j. OPERATOR TRAINING EQUIPMENT
k. MAINTENANCE MANPOWER/TRAINING
l. MAINTENANCE TRAINING EQUIPMENT
m. CONTRACT MAINTENANCE
n. PACKAGING, HANDLING, STORAGE, TRANSPORTABILITY
PAR. (X)
e. REWORK OF OTHER EQUIPMENT
f. SYSTEM TEST PROCEDURES
g. WARRANTY/GUARANTEE
h. PARTS CONTROL
i. LIFE CYCLE COSTS
FACTOR
39. EFFECTS ON OPERATIONAL
EMPLOYMENT
a. SAFETY
b. SURVIVABILITY
c. RELIABILITY
d. MAINTAINABILITY
e. SERVICE LIFE
f. OPERATING PROCEDURES
i. CRITICAL SINGLE POINT FAILURE ITEMS
j. INTEROPERABILITY
d. COMPUTER PROGRAMS AND RESOURCES
ENCL. PAR.
41. ALTERNATE SOLUTIONS
42. DEVELOPMENTAL STATUS
43. RECOMMENDATIONS FOR RETROFIT
a. ORGANIZATION
44. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS
b. INTERMEDIATE c. DEPOT d. OTHER
45. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT
g. ELECTROMAGNETIC INTERFERENCE
h. ACTIVATION SCHEDULE
40. OTHER CONSIDERATIONS
a. INTERFACE
b. OTHER AFFECTED EQUIPMENT/GFE/GFP
c. PHYSICAL CONSTRAINTS
ENCL.
37. EFFECT ON PRODUCT CONFIGURATION
DOCUMENTATION OR CONTRACT
46. THIS CHANGE MUST BE ACCOMPLISHED 48. OUT OF SERVICE TIME
a. PRODUCTION
b. RETROFIT
47. IS CONTRACTOR FIELD
SERVICE ENGINEERING
REQUIRED?BEFORE WITH AFTER THE FOLLOWING CHANGES
YES NO
38. EFFECT ON INTEGRATED LOGISTICS
SUPPORT (ILS) ELEMENTS
49. EFFECT OF THIS ECP AND PREVIOUSLY APPROVED ECP'S ON
ITEM
ECP NUMBER:
OMB No.
0704-0188
PAN:
DD FORM 1692/3, MAR 2013
DISTRIBUTION STATEMENT:
DD Form 1692/3, Engineering Change Proposal, Page 3, March 2013
WHS/ESD/IMD
50. DATE CONTRACTUAL AUTHORITY NEEDED FOR
(DD-MMM-YYYY)
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3
(This page for use as necessary.)
EFFECTS ON PRODUCT CONFIGURATION DOCUMENTATION, LOGISTICS AND OPERATIONS
(X)
o. PROVISIONING DATA
FACTOR
a. PERFORMANCE
b. WEIGHT-BALANCE-STABILITY (Aircraft)
c. WEIGHT-MOMENT (Other equipment)
d. CDRL, TECHNICAL DATA
e. NOMENCLATURE
a. ILS PLANS
b. MAINTENANCE CONCEPTS, PLANS AND
PROCEDURES
c. LOGISTICS SUPPORT ANALYSES
d. INTERIM SUPPORT PROGRAMS
e. SPARES AND REPAIR PARTS
f. TECH MANUALS
g. FACILITIES
h. SUPPORT EQUIPMENT
i. OPERATOR MANPOWER/TRAINING
j. OPERATOR TRAINING EQUIPMENT
k. MAINTENANCE MANPOWER/TRAINING
l. MAINTENANCE TRAINING EQUIPMENT
m. CONTRACT MAINTENANCE
n. PACKAGING, HANDLING, STORAGE, TRANSPORTABILITY
PAR.
(X)
e. REWORK OF OTHER EQUIPMENT
f. SYSTEM TEST PROCEDURES
g. WARRANTY/GUARANTEE
h. PARTS CONTROL
i. LIFE CYCLE COSTS
FACTOR
39. EFFECTS ON OPERATIONAL
EMPLOYMENT
a. SAFETY
b. SURVIVABILITY
c. RELIABILITY
d. MAINTAINABILITY
e. SERVICE LIFE
f. OPERATING PROCEDURES
i. CRITICAL SINGLE POINT FAILURE ITEMS
j. INTEROPERABILITY
d. COMPUTER PROGRAMS AND RESOURCES
ENCL.
PAR.
41. ALTERNATE SOLUTIONS
42. DEVELOPMENTAL STATUS
43. RECOMMENDATIONS FOR RETROFIT
a. ORGANIZATION
44. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS
b. INTERMEDIATE
c. DEPOT
d. OTHER
45. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT
g. ELECTROMAGNETIC INTERFERENCE
h. ACTIVATION SCHEDULE
40. OTHER CONSIDERATIONS
a. INTERFACE
b. OTHER AFFECTED EQUIPMENT/GFE/GFP
c. PHYSICAL CONSTRAINTS
ENCL.
37. EFFECT ON PRODUCT CONFIGURATION
DOCUMENTATION OR CONTRACT
46. THIS CHANGE MUST BE ACCOMPLISHED
48. OUT OF SERVICE TIME
a. PRODUCTION
b. RETROFIT
47. IS CONTRACTOR FIELD
SERVICE ENGINEERING
REQUIRED?
BEFORE
WITH
AFTER THE FOLLOWING CHANGES
YES
NO
38. EFFECT ON INTEGRATED LOGISTICS
SUPPORT (ILS) ELEMENTS
49. EFFECT OF THIS ECP AND PREVIOUSLY APPROVED ECP'S ON
ITEM
ECP NUMBER:
OMB No.
0704-0188
PAN:
DD FORM 1692/3, MAR 2013
DISTRIBUTION STATEMENT:
| Procuring Activity Number (PAN).: |
| Engineering Change Proposal (ECP) number.: |
| 37. Effect on product configuration documentation or contract. X if a. Performance.: Off |
| Enclosure.: |
| Paragraph.: |
| X if b. Weight-balance-stability (aircraft).: Off |
| Enclosure.: |
| Paragraph.: |
| X if c. Weight-movement (other equipment).: Off |
| Enclosure.: |
| Paragraph.: |
| X if d. CDRL, technical data.: Off |
| Enclosure.: |
| Paragraph.: |
| X if e. Nomenclature.: Off |
| Enclosure.: |
| Paragraph.: |
| X if other.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| 38. Effect on Integrated Logistics Support (ILS) elements. X if a. ILS plans.: Off |
| Enclosure.: |
| Paragraph.: |
| X if b. Maintenance concepts, plans and procedures.: Off |
| Enclosure.: |
| Paragraph.: |
| X if c. Logistics support analyses.: Off |
| Enclosure.: |
| Paragraph.: |
| X if d. Interim support programs.: Off |
| Enclosure.: |
| Paragraph.: |
| X if e. Spares and repair parts.: Off |
| Enclosure.: |
| Paragraph.: |
| X if f. Tech manuals.: Off |
| Enclosure.: |
| Paragraph.: |
| X if g. Facilities.: Off |
| Enclosure.: |
| Paragraph.: |
| X if h. Support equipment.: Off |
| Enclosure.: |
| Paragraph.: |
| X if i. Operator manpower/training.: Off |
| Enclosure.: |
| Paragraph.: |
| X if j. Operator training equipment.: Off |
| Enclosure.: |
| Paragraph.: |
| X if k. Maintenance manpower/training.: Off |
| Enclosure.: |
| Paragraph.: |
| X if l. Maintenance training equipment.: Off |
| Enclosure.: |
| Paragraph.: |
| X if m. Contract maintenance.: Off |
| Enclosure.: |
| Paragraph.: |
| X if n. Packaging, handling, storage, transportability.: Off |
| Enclosure.: |
| Paragraph.: |
| X if o. Provisioning data.: Off |
| Enclosure.: |
| Paragraph.: |
| X if other, line 1.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| X if other, line 2.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| X if other, line 3.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| 39. Effects on operational employment. X if a. Safety.: Off |
| Enclosure.: |
| Paragraph.: |
| X if b. Survivability.: Off |
| Enclosure.: |
| Paragraph.: |
| X if c. Reliability.: Off |
| Enclosure.: |
| Paragraph.: |
| X if d. Maintainability.: Off |
| Enclosure.: |
| Paragraph.: |
| X if e. Service life.: Off |
| Enclosure.: |
| Paragraph.: |
| X if f. Operating procedures.: Off |
| Enclosure.: |
| Paragraph.: |
| X if g. Electromagnetic interference.: Off |
| Enclosure.: |
| Paragraph.: |
| X if h. Activation schedule.: Off |
| Enclosure.: |
| Paragraph.: |
| X if i. Critical single point failure items.: Off |
| Enclosure.: |
| Paragraph.: |
| X if j. Interoperability.: Off |
| Enclosure.: |
| Paragraph.: |
| X if other, line 1.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| X if other, line 2.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| X if other, line 3.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| 40. Other considerations. X if a. Interface.: Off |
| Enclosure.: |
| Paragraph.: |
| X if b. Other affected equipment/GFE/GFP.: Off |
| Enclosure.: |
| Paragraph.: |
| X if c. Physical constraints.: Off |
| Enclosure.: |
| Paragraph.: |
| X if d. Computer programs and resources.: Off |
| Enclosure.: |
| Paragraph.: |
| X if e. Rework of other equipment.: Off |
| Enclosure.: |
| Paragraph.: |
| X if f. System test procedures.: Off |
| Enclosure.: |
| Paragraph.: |
| X if g. Warranty/guarantee.: Off |
| Enclosure.: |
| Paragraph.: |
| X if h. Parts control.: Off |
| Enclosure.: |
| Paragraph.: |
| X if i. Life cycle costs.: Off |
| Enclosure.: |
| Paragraph.: |
| X if other, line 1.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| X if other, line 2.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| X if other, line 3.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| X if other, line 4.: Off |
| Other.: |
| Enclosure.: |
| Paragraph.: |
| 41. Alternate solutions.: |
| 42. Developmental status.: |
| 42. Recommendations for retrofit.: |
| 44. Work-hours per unit to install retrofit kits. a. Organization.: |
| b. Intermediate.: |
| c. Depot.: |
| d. Other.: |
| 44. Work-hours to conduct system tests after retrofit.: |
| 47. Is contractor field service engineering required? X first box if yes, second if no.: |
| List changes.: |
| 38. Out of service time.: |
| 49. Effect of this ECP and previously approved ECPs on item.: |
| 50. Date contractual authority needed for: a. Production (2 digit day-3 letter month-4 digit year).: |
| b. Retrofit.: |
| Distribution statement.: |
File details come from the government source that posted it. Updated .