Corrosion Control Facility - Abstract of Bidders 20240918.pdf
PDF 138 KB Posted
- Attached to
- Construct Corrosion Control Facility
- Solicitation number
- W50S78-24-B-0002
- Issued by
-
Department of the Army National Guard
About this file
This document is an Abstract of Offers for an Invitation for Bids (IFB) to construct a new 12,200 square foot Corrosion Control Facility at Joint Base San Antonio - Kelly Field Annex for the Texas Air National Guard. The solicitation number is W50S78-24-B-0002, and the project has a government estimate between $10-25 million. It is a 100% small business set-aside with a NAICS code of 236220. The contract duration is 540 calendar days. The solicitation includes a base bid to construct the facility along with four options for alternate features such as translucent fiberglass panels, a screen wall, a standing seam metal roof, and epoxy flooring. Several brand name items are specified for compatibility with existing systems. The document provides details on the five offerors, including their proposed amounts for the base bid and optional items, as well as their technical acceptability and past performance ratings.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page
ISSUING OFFICE
OFFEROR 1
AR6-WHITE TEMP CONSTRUCTION NEW BRAUNFELS TX
ITEM
NO. DESCRIPTION OF OFFERED ITEM QUANTITY UNIT
ESTIMATED
AMOUNT
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
PAST PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
PRIME
PAST PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTOR
PROPOSAL
AMOUNT
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
PRIME
PAST PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTOR
PAST PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
N/A N/A N/A N/A N/A N/A
0001 Construct Corrosion Control Facility 1 Job $10,380,060.62 $13,815,485.00
1001 Option 1 - Translucent Fiberglass 1 Job $12,245.69 $33,744.00
1002 Option 2 - Segmental Brick Screen Wall 1 Job $107,739.01 $112,992.00
1003 Option 3 - Standing Seam Metal Roof 1 Job $188,207.95 $35,681.00
1004 Option 4 - Hangar Bay 5 Part epoxy Flooring 1 Job $30,576.66 $63,034.00
Total $10,718,829.93 Total $14,060,936.00 Total
NO. OF AMENDMENTS ISSUED: Five 0001 - 08/23/2024 0002 - 08/29/2024 0003 - 09/05/2024 0004 - 09/10/2024 0005 - 09/13/2024
OFFEROR 2
SUMMIT BUILDING AND DESIGN
SAN ANTONIO, TX
BID BOND SUBMITTED - Yes BID BOND SUBMITTED -
AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes
ABSTRACT OF OFFERS - CONSTRUCTION
IFB Construct Corrosion Control Facility
SOLICITATION NO.
W50S78-24-B-0002
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Amanda M. Bogue, Contracting Officer
SIGNATURE DATE SIGNED
Date 9/17/2024
$12,919,542.00
$243,532.00
$47,933.00
$61,576.00
$83,994.00
AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes
USPFO TX 149 MISSION SUPPORT CONTRACTING
107 HENSLEY STREET, BLDG 962, SUITE 2
LACKLAND AFB TX 78236-0123
Project No: KELL169014
Project Title: Corrosion Control Facility
8. GOVERNMENT ESTIMATE
(Check A, B, or C and complete D, E, and F)
OFFERS
NO. 1 NO. 2
PROPOSAL
AMOUNT
$12,482,507.00
CONTRACT ITEMS
PROPOSAL
AMOUNT
PROPOSAL
AMOUNT
PROPOSAL
AMOUNT
N/A N/A N/A N/A N/A N/A N/A N/A N/A
0001 1 Job $13,631,225.00 $11,652,691.00 $11,930,927.00
1001 1 Job $104,196.00 $86,634.00 $107,451.00
1002 1 Job $111,492.00 $178,983.00 $119,288.00
1003 1 Job $27,862.00 $4,982.00 $11,691.00
1004 1 Job $33,819.00 $38,825.00 $32,038.00
Total $13,908,594.00 Total $11,962,115.00 Total $12,201,395.00
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
PRIME
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTOR
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTOR
BID BOND SUBMITTED - Yes
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
NO. 3 NO. 5
AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes
BID BOND SUBMITTED - Yes
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
PRIME
INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.
AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes
NO. 4
ABSTRACT OF OFFERS - CONSTRUCTION
IFB Project: Corrosion Control Facility
CONTINUATION SHEET
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLEQTY
OFFEROR # 4 HASEN
GLOBAL LLC NEW
BRAUNFELS TX
PROJECT TITLE:
Corrosion Control Facility
No: KELL169014
ITEM
NO.
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTORUNIT
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
SOLICITATION NUMBER: W50S78-24-B-0002
OFFEROR # 5 DOMINGUEZ &
PERSONS LLC ANNISTON,
ALABAMA
BID BOND SUBMITTED - Yes
OFFEROR # 3 BRISTOL
CONSTRUCTION SERVICES
ANCHORAGE AK
AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes
CONTRACT ITEMS
PROPOSAL
AMOUNT
PROPOSAL
AMOUNT
PROPOSAL
AMOUNT
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
0001 1 Job $14,970,014.00 $16,356,749.00
1001 1 Job $123,447.00 $74,500.00
1002 1 Job $132,269.00 $169,638.00
1003 1 Job $101,893.00 $60,000.00
1004 1 Job $32,295.00 50,000.00$
Total $15,359,918.00 Total $16,710,887.00 Total $0.00
ABSTRACT OF OFFERS - CONSTRUCTION
IFB Project: Corrosion Control Facility
CONTINUATION SHEET
SOLICITATION NUMBER: W50S78-24-B-0002 Page 3 of 4 INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.
PROJECT TITLE:
Corrosion Control Facility
No: KELL169014
NO. 6 NO. 7 NO. 8
OFFEROR # 6 HHI
CORPORATION OGDEN,
UTAH
OFFEROR # 7 SMR
CONSTRUCTION
RICHARDSON, TX
OFFEROR # 8
BID BOND SUBMITTED - Yes BID BOND SUBMITTED - Yes
AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes AMENDMENT 0001 - 0004 ACKNOWLEDGED - Yes
BID BOND SUBMITTED - Yes
ITEM
NO. QTY UNIT
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
PRIME
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTOR
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
PRIME
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTOR
TECHNICAL -
ACCEPTABLE/
UNACCEPTABLE
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
PAST
PERFORMANCE
ACCEPTABLE/
UNACCEPTABLE
SUBCONTRACTOR
| 2024-09-18T12:12:41-0400 | |
| BOGUE.AMANDA.MARIE.1294920966 |
Text49: 09/18/2024