Corrosion Control Facility - Abstract of Bidders 20240918.pdf

PDF 138 KB Posted

Attached to
Construct Corrosion Control Facility
Solicitation number
W50S78-24-B-0002
Issued by

About this file

This document is an Abstract of Offers for an Invitation for Bids (IFB) to construct a new 12,200 square foot Corrosion Control Facility at Joint Base San Antonio - Kelly Field Annex for the Texas Air National Guard. The solicitation number is W50S78-24-B-0002, and the project has a government estimate between $10-25 million. It is a 100% small business set-aside with a NAICS code of 236220. The contract duration is 540 calendar days. The solicitation includes a base bid to construct the facility along with four options for alternate features such as translucent fiberglass panels, a screen wall, a standing seam metal roof, and epoxy flooring. Several brand name items are specified for compatibility with existing systems. The document provides details on the five offerors, including their proposed amounts for the base bid and optional items, as well as their technical acceptability and past performance ratings.

View the file

Other files

File Type Posted
Corrosion Control Facility - Abstract of Bidders - REVISED - 20240924.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 05 - 20240913.pdf PDF
Addendum 3 - SB102-SLAB PLAN.pdf PDF
Addendum 3 - SB508-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB507-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB506-FOUNDATION DETAILS.pdf PDF
Addendum 3 - S-001-GENERAL NOTES.pdf PDF
Addendum 3 - 01 14 00 - WORK RESTRICTIONS.pdf PDF
Addendum 3 - A-201-BUILDING ELEVATIONS.pdf PDF
Addendum 3 - G-202-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - G-203-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - 08 34 16.10 - HORIZONTAL ROLLING STEEL DOORS.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 04 - 20240910.pdf PDF
Addendum 03 Cover Page.pdf PDF
Addendum 3 - G-002-SHEET INDEX.pdf PDF
Attachment 13 - Kelly Annex CORROSION CONTROL-TOPO.pdf PDF
Addendum 3 - 09 06 00 - SCHEDULES OF FINISHES.pdf PDF
Addendum 3 - A-104-HANGAR BAY FLOOR PAINT STRIPING PLAN.pdf PDF
Addendum 3 - A-101-FLOOR PLAN.pdf PDF
Addendum 3 - A-103-ROOF PLAN.pdf PDF
Addendum 3 - A-500-DETAILS.pdf PDF
Addendum 3 - EG502-GROUNDING AND LIGHTNING PROTECTION DETAILS.pdf PDF
Attachment 12 - JBSA-Soil Management Plan - Signed Jan 22.pdf PDF
Addendum 3 - A-501-DETAILS.pdf PDF
Addendum 3 - G-201-SPECIAL INSPECTIONS.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 230 (20240910).pdf PDF
ADDENDUM 2- SPECIFICATIONS -08 34 16.10 -- DRAWING - A-603.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 03 - 20240905.pdf PDF
Attachment 11 - Geotechical report - TX ANG CC Facility.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 02 - 20240829.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 11 (20240829).pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 5 (20240823).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 01 - 20240823.pdf PDF
ADDENDUM 1 - SPECIFICATIONS VOL 1 - SECTION 08 71 00 DOOR HARDWARE.pdf PDF
Pre_Bid_Site Visit_Corrosion Control_Attendance_Sheet 20_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides_Corrosion Control 20 Aug 24.pptx PPTX presentation
Attachment 1 - TX-ANG_CORROSION CONTRAOL HANGAR_TYPE B3_DRAWINGS.pdf PDF
Attachment 8 - Trane Redacted.pdf PDF
Attachment 10 - Monaco Redacted.pdf PDF
Attachment 6 - Access and staging site plan.pdf PDF
Attachment 5 - Industrial Security SOW.pdf PDF
Attachment 4 - STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 9 - Falcon Redacted.pdf PDF
Attachment 7 - DDC Redacted.pdf PDF
Attachment 1.a. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (1-74) 2024.08.02.pdf PDF
W50S7824B0002 Corrosion Control Facility -Solicitation - 20240809.pdf PDF
Attachment 3 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 2 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 1.b. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (75-136) 2024.08.02.pdf PDF
Attachment 2 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 1 SPECIFICATIONS 2024.08.02.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page

ISSUING OFFICE

OFFEROR 1

AR6-WHITE TEMP CONSTRUCTION NEW BRAUNFELS TX

ITEM

NO. DESCRIPTION OF OFFERED ITEM QUANTITY UNIT

ESTIMATED

AMOUNT

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PAST PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

PROPOSAL

AMOUNT

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

PAST PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

N/A N/A N/A N/A N/A N/A

0001 Construct Corrosion Control Facility 1 Job $10,380,060.62 $13,815,485.00

1001 Option 1 - Translucent Fiberglass 1 Job $12,245.69 $33,744.00

1002 Option 2 - Segmental Brick Screen Wall 1 Job $107,739.01 $112,992.00

1003 Option 3 - Standing Seam Metal Roof 1 Job $188,207.95 $35,681.00

1004 Option 4 - Hangar Bay 5 Part epoxy Flooring 1 Job $30,576.66 $63,034.00

Total $10,718,829.93 Total $14,060,936.00 Total

NO. OF AMENDMENTS ISSUED: Five 0001 - 08/23/2024 0002 - 08/29/2024 0003 - 09/05/2024 0004 - 09/10/2024 0005 - 09/13/2024

OFFEROR 2

SUMMIT BUILDING AND DESIGN

SAN ANTONIO, TX

BID BOND SUBMITTED - Yes BID BOND SUBMITTED -

AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes

ABSTRACT OF OFFERS - CONSTRUCTION

IFB Construct Corrosion Control Facility

SOLICITATION NO.

W50S78-24-B-0002

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

Amanda M. Bogue, Contracting Officer

SIGNATURE DATE SIGNED

Date 9/17/2024

$12,919,542.00

$243,532.00

$47,933.00

$61,576.00

$83,994.00

AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes

USPFO TX 149 MISSION SUPPORT CONTRACTING

107 HENSLEY STREET, BLDG 962, SUITE 2

LACKLAND AFB TX 78236-0123

Project No: KELL169014

Project Title: Corrosion Control Facility

8. GOVERNMENT ESTIMATE

(Check A, B, or C and complete D, E, and F)

OFFERS

NO. 1 NO. 2

PROPOSAL

AMOUNT

$12,482,507.00

CONTRACT ITEMS

PROPOSAL

AMOUNT

PROPOSAL

AMOUNT

PROPOSAL

AMOUNT

N/A N/A N/A N/A N/A N/A N/A N/A N/A

0001 1 Job $13,631,225.00 $11,652,691.00 $11,930,927.00

1001 1 Job $104,196.00 $86,634.00 $107,451.00

1002 1 Job $111,492.00 $178,983.00 $119,288.00

1003 1 Job $27,862.00 $4,982.00 $11,691.00

1004 1 Job $33,819.00 $38,825.00 $32,038.00

Total $13,908,594.00 Total $11,962,115.00 Total $12,201,395.00

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

BID BOND SUBMITTED - Yes

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

NO. 3 NO. 5

AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes

BID BOND SUBMITTED - Yes

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.

AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes

NO. 4

ABSTRACT OF OFFERS - CONSTRUCTION

IFB Project: Corrosion Control Facility

CONTINUATION SHEET

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLEQTY

OFFEROR # 4 HASEN

GLOBAL LLC NEW

BRAUNFELS TX

PROJECT TITLE:

Corrosion Control Facility

No: KELL169014

ITEM

NO.

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTORUNIT

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

SOLICITATION NUMBER: W50S78-24-B-0002

OFFEROR # 5 DOMINGUEZ &

PERSONS LLC ANNISTON,

ALABAMA

BID BOND SUBMITTED - Yes

OFFEROR # 3 BRISTOL

CONSTRUCTION SERVICES

ANCHORAGE AK

AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes

CONTRACT ITEMS

PROPOSAL

AMOUNT

PROPOSAL

AMOUNT

PROPOSAL

AMOUNT

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

0001 1 Job $14,970,014.00 $16,356,749.00

1001 1 Job $123,447.00 $74,500.00

1002 1 Job $132,269.00 $169,638.00

1003 1 Job $101,893.00 $60,000.00

1004 1 Job $32,295.00 50,000.00$

Total $15,359,918.00 Total $16,710,887.00 Total $0.00

ABSTRACT OF OFFERS - CONSTRUCTION

IFB Project: Corrosion Control Facility

CONTINUATION SHEET

SOLICITATION NUMBER: W50S78-24-B-0002 Page 3 of 4 INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.

PROJECT TITLE:

Corrosion Control Facility

No: KELL169014

NO. 6 NO. 7 NO. 8

OFFEROR # 6 HHI

CORPORATION OGDEN,

UTAH

OFFEROR # 7 SMR

CONSTRUCTION

RICHARDSON, TX

OFFEROR # 8

BID BOND SUBMITTED - Yes BID BOND SUBMITTED - Yes

AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes AMENDMENT 0001 - 0005 ACKNOWLEDGED - Yes AMENDMENT 0001 - 0004 ACKNOWLEDGED - Yes

BID BOND SUBMITTED - Yes

ITEM

NO. QTY UNIT

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

2024-09-18T12:12:41-0400
BOGUE.AMANDA.MARIE.1294920966

Text49: 09/18/2024

File details come from the government source that posted it. Updated .