This document is Addendum No. 03 for the federal contract opportunity to construct a Corrosion Control Facility at Joint Base San Antonio - Lackland in San Antonio, TX. The addendum revises the original bid documents dated August 2, 2024 by updating specifications, drawings, and details related to work restrictions, horizontal rolling steel doors, finishes, sheet indexes, special inspections, floor plans, roofing, hangar bay paint striping, building elevations, structural details, and grounding/lightning protection.
The overall federal contract opportunity is a firm fixed-price construction contract with a base bid and four optional bid items. The project is set aside 100% for Small Businesses under NAICS code 236220, with an estimated magnitude between $10-25 million. A site visit and pre-bid conference will be held, and all questions/RFIs must be submitted 5 days prior to bid opening. The contract duration will be 540 calendar days after the notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FSB | fsb-ae.com
ADDENDUM NO. 03
Date: 9 September 2024
To: ALL BIDDERS OF RECORD
From: Frankfurt-Short-Bruza Associates, P.C.
5801 N. Broadway Ext., Suite 500 Oklahoma City, OK 73118
Subject: KELL169014: Construct Corrosion Control Facility, TX/ANG, JBSA Lackland, San Antonio, TX
FSB Project No.: 20190320
NOTE: This Addendum forms a part of the Contract Documents and modifies the Original Documents dated 2 August 2024.
Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
ATTACHMENTS
Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of (3) pages and the following attachments:
Specifications:
01 14 00 – WORK RESTRICTIONS
08 34 16.10 – HORIZONTAL ROLLING STEEL DOORS
09 06 00 – SCHEDULE OF FINISHES
Drawings:
G-002 – SHEET INDEX
G-201 – SPECIAL INSPECTIONS
G-202 – SPECIAL INSPECTIONS
G-203 – SPECIAL INSPECTIONS
A101 – FLOOR PLAN
A103 – ROOF PLAN
A104 – HANGAR BAY FLOOR PAINT STRIPING PLAN
A201 – BUILDING ELEVATIONS
A500 – DETAILS
A501 – DETAILS
S-001 – GENERAL NOTES
SB102 – SLAB PLAN
SB506 – FOUNDATION DETAILS
SB507 – FOUNDATION DETAILS
FSB | DefineDesignDeliver
SB508 – FOUNDATION DETAILS
EG502 – GROUNDING AND LIGHTNING PROTECTION DETAILS
MODIFICATIONS TO THE SPECIFICATIONS
ITEM 01.1-1 Refer to attached Specification Section 01 14 00 – WORK RESTRICTIONS, dated 9 September 2024:
A. Specification Section 01 14 00 is hereby revised and re-issued in its entirety to revise the working hours section 1.3.2.
• Replace Section 01 14 00 dated 2 August 2024 with attached revised Specification Section 01 14 00 dated 9 September 2024.
ITEM 01.1-2 Refer to attached Specification Section 08 34 16.10 – HORIZONTAL ROLLING STEEL DOORS, dated 9 September 2024:
A. Specification Section 08 34 16.10 is hereby revised and re-issued in its entirety to revise section 2.1.8.1.
• Replace Section 08 34 16.10 dated 2 August 2024 with attached revised Specification Section 08 34 16.10 dated 9 September 2024.
ITEM 01.1-3 Refer to attached Specification Section 09 06 00 – SCHEDULE OF FINISHES, dated 9 September 2024:
A. Specification Section 09 06 00 is hereby revised and re-issued in its entirety to revise change the number of color boards.
• Replace Section 09 06 00 dated 2 August 2024 with attached revised Specification Section 09 06 00 dated 9 September 2024.
MODIFICATIONS TO THE DRAWINGS
ITEM 01.2-1 Refer to attached Sheet G-002 – SHEET INDEX, dated 9 September 2024:
A. Sheet G-002 is hereby revised and re-issued in its entirety to add additional sheets.
• Replace Sheet G-002 dated 2 August 2024 with attached revised Sheet G-002 dated 9 September 2024.
ITEM 01.2-2 Refer to attached Sheet G-201 – SPECIAL INSPECTIONS, dated 9 September 2024:
A. Sheet G-201 is hereby issued in its entirety to provide direction.
ITEM 01.2-3 Refer to attached Sheet G-202 – SPECIAL INSPECTIONS, dated 9 September 2024:
A. Sheet G-202 is hereby issued in its entirety to provide direction.
ITEM 01.2-4 Refer to attached Sheet G-203 – SPECIAL INSPECTIONS, dated 9 September 2024:
A. Sheet G-203 is hereby issued in its entirety to provide direction.
ITEM 01.2-5 Refer to attached Sheet A101 – FLOOR PLAN, dated 9 September 2024:
A. Sheet A101 is hereby revised and re-issued in its entirety to revise keynotes.
• Replace Sheet A101 dated 2 August 2024 with attached revised Sheet A101 dated 9 September 2024.
ITEM 01.2-6 Refer to attached Sheet A103 – ROOF PLAN, dated 9 September 2024:
A. Sheet A-103 is hereby revised and re-issued in its entirety to revise exhaust penetrations.
• Replace Sheet A-103 dated 2 August 2024 with attached revised Sheet A-103 dated 9 September 2024.
ITEM 01.2-7 Refer to attached Sheet A104 – HANGAR BAY FLOOR PAINT STRIPING PLAN, dated 9 September 2024:
A. Sheet A-104 is hereby issued in its entirety.
ITEM 01.2-8 Refer to attached Sheet A201 – BUILDING ELEVATIONS, dated 9 September 2024:
A. Sheet A-201 is hereby revised and re-issued in its entirety to add section cuts.
FSB | DefineDesignDeliver
• Replace Sheet A-201 dated 2 August 2024 with attached revised Sheet A-201 dated 9 September 2024.
ITEM 01.2-9 Refer to attached Sheet A500 – DETAILS, dated 9 September 2024:
A. Sheet A-500 is hereby revised and re-issued in its entirety to revise detail section.
• Replace Sheet A-500 dated 2 August 2024 with attached revised Sheet A-500 dated 9 September 2024.
ITEM 01.2-10 Refer to attached Sheet A501 – DETAILS, dated 9 September 2024:
A. Sheet A-501 is hereby revised and re-issued in its entirety to add new detail sections.
• Replace Sheet A-501 dated 2 August 2024 with attached revised Sheet A-501 dated 9 September 2024.
ITEM 01.2-11 Refer to attached Sheet S-001 – GENERAL NOTES, dated 9 September 2024:
A. Sheet S-001 is hereby revised and re-issued in its entirety to revise SOILS/FOUNDATION NOTE 3.
• Replace Sheet S-001 dated 2 August 2024 with attached revised Sheet S-001 dated 9 September 2024.
ITEM 01.2-12 Refer to attached Sheet SB102 – SLAB PLAN, dated 9 September 2024:
A. Sheet SB102 is hereby revised and re-issued in its entirety to revise Slab Plan Note.
• Replace Sheet SB102 dated 2 August 2024 with attached revised Sheet SB102 dated 9 September 2024.
ITEM 01.2-13 Refer to attached Sheet SB506 – FOUNDATION DETAILS, dated 9 September 2024:
A. Sheet SB506 is hereby revised and re-issued in its entirety to revise section details.
• Replace Sheet SB506 dated 2 August 2024 with attached revised Sheet SB506 dated 9 September 2024.
ITEM 01.2-14 Refer to attached Sheet SB507 – FOUNDATION DETAILS, dated 9 September 2024:
A. Sheet SB507 is hereby revised and re-issued in its entirety to add new section details.
• Replace Sheet SB507 dated 2 August 2024 with attached revised Sheet SB507 dated 9 September 2024.
ITEM 01.2-15 Refer to attached Sheet SB508 – FOUNDATION DETAILS, dated 9 September 2024:
A. Sheet SB508 is hereby issued in its entirety.
ITEM 01.2-16 Refer to attached Sheet EG502 – GROUNDING AND LIGHTNING PROTECTION DETAILS, dated 9 September 2024:
A. Sheet EG502 is hereby revised and re-issued in its entirety to remove static grounding receptacle plan view.
• Replace Sheet EG502 dated 2 August 2024 with attached revised Sheet EG502 dated 9 September 2024.