This document is Addendum No. 03 for the federal contract opportunity to construct a Corrosion Control Facility at Joint Base San Antonio - Lackland in San Antonio, TX. The addendum revises the original bid documents dated August 2, 2024 by updating specifications, drawings, and details related to work restrictions, horizontal rolling steel doors, finishes, sheet indexes, special inspections, floor plans, roofing, hangar bay paint striping, building elevations, structural details, and grounding/lightning protection.

The overall federal contract opportunity is a firm fixed-price construction contract with a base bid and four optional bid items. The project is set aside 100% for Small Businesses under NAICS code 236220, with an estimated magnitude between $10-25 million. A site visit and pre-bid conference will be held, and all questions/RFIs must be submitted 5 days prior to bid opening. The contract duration will be 540 calendar days after the notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Corrosion Control Facility, newest first.
File Type Posted
Corrosion Control Facility - Abstract of Bidders - REVISED - 20240924.pdf PDF
Corrosion Control Facility - Abstract of Bidders 20240918.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 05 - 20240913.pdf PDF
Addendum 3 - S-001-GENERAL NOTES.pdf PDF
Addendum 3 - SB507-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB506-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB508-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB102-SLAB PLAN.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 04 - 20240910.pdf PDF
Addendum 3 - G-203-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-500-DETAILS.pdf PDF
Addendum 3 - A-103-ROOF PLAN.pdf PDF
Addendum 3 - A-101-FLOOR PLAN.pdf PDF
Attachment 13 - Kelly Annex CORROSION CONTROL-TOPO.pdf PDF
Addendum 3 - G-002-SHEET INDEX.pdf PDF
Addendum 3 - EG502-GROUNDING AND LIGHTNING PROTECTION DETAILS.pdf PDF
Addendum 3 - A-104-HANGAR BAY FLOOR PAINT STRIPING PLAN.pdf PDF
Addendum 3 - 09 06 00 - SCHEDULES OF FINISHES.pdf PDF
Addendum 3 - 08 34 16.10 - HORIZONTAL ROLLING STEEL DOORS.pdf PDF
Addendum 3 - G-202-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-201-BUILDING ELEVATIONS.pdf PDF
Addendum 3 - 01 14 00 - WORK RESTRICTIONS.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 230 (20240910).pdf PDF
Attachment 12 - JBSA-Soil Management Plan - Signed Jan 22.pdf PDF
Addendum 3 - G-201-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-501-DETAILS.pdf PDF
ADDENDUM 2- SPECIFICATIONS -08 34 16.10 -- DRAWING - A-603.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 03 - 20240905.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 11 (20240829).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 02 - 20240829.pdf PDF
Attachment 11 - Geotechical report - TX ANG CC Facility.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 01 - 20240823.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 5 (20240823).pdf PDF
ADDENDUM 1 - SPECIFICATIONS VOL 1 - SECTION 08 71 00 DOOR HARDWARE.pdf PDF
Pre_Bid_Site Visit_Corrosion Control_Attendance_Sheet 20_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides_Corrosion Control 20 Aug 24.pptx PPTX presentation
Attachment 1 - TX-ANG_CORROSION CONTRAOL HANGAR_TYPE B3_DRAWINGS.pdf PDF
Attachment 1.a. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (1-74) 2024.08.02.pdf PDF
Attachment 10 - Monaco Redacted.pdf PDF
W50S7824B0002 Corrosion Control Facility -Solicitation - 20240809.pdf PDF
Attachment 3 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 2 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 4 - STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 9 - Falcon Redacted.pdf PDF
Attachment 5 - Industrial Security SOW.pdf PDF
Attachment 7 - DDC Redacted.pdf PDF
Attachment 8 - Trane Redacted.pdf PDF
Attachment 1.b. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (75-136) 2024.08.02.pdf PDF
Attachment 2 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 1 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 6 - Access and staging site plan.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FSB | fsb-ae.com

ADDENDUM NO. 03

Date: 9 September 2024

To: ALL BIDDERS OF RECORD

From: Frankfurt-Short-Bruza Associates, P.C.

5801 N. Broadway Ext., Suite 500 Oklahoma City, OK 73118

Subject: KELL169014: Construct Corrosion Control Facility, TX/ANG, JBSA Lackland, San Antonio, TX

FSB Project No.: 20190320

NOTE: This Addendum forms a part of the Contract Documents and modifies the Original Documents dated 2 August 2024.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

ATTACHMENTS

Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of (3) pages and the following attachments:

Specifications:

01 14 00 – WORK RESTRICTIONS

08 34 16.10 – HORIZONTAL ROLLING STEEL DOORS

09 06 00 – SCHEDULE OF FINISHES

Drawings:

G-002 – SHEET INDEX

G-201 – SPECIAL INSPECTIONS

G-202 – SPECIAL INSPECTIONS

G-203 – SPECIAL INSPECTIONS

A101 – FLOOR PLAN

A103 – ROOF PLAN

A104 – HANGAR BAY FLOOR PAINT STRIPING PLAN

A201 – BUILDING ELEVATIONS

A500 – DETAILS

A501 – DETAILS

S-001 – GENERAL NOTES

SB102 – SLAB PLAN

SB506 – FOUNDATION DETAILS

SB507 – FOUNDATION DETAILS

FSB | DefineDesignDeliver

SB508 – FOUNDATION DETAILS

EG502 – GROUNDING AND LIGHTNING PROTECTION DETAILS

MODIFICATIONS TO THE SPECIFICATIONS

ITEM 01.1-1 Refer to attached Specification Section 01 14 00 – WORK RESTRICTIONS, dated 9 September 2024:

A. Specification Section 01 14 00 is hereby revised and re-issued in its entirety to revise the working hours section 1.3.2.

• Replace Section 01 14 00 dated 2 August 2024 with attached revised Specification Section 01 14 00 dated 9 September 2024.

ITEM 01.1-2 Refer to attached Specification Section 08 34 16.10 – HORIZONTAL ROLLING STEEL DOORS, dated 9 September 2024:

A. Specification Section 08 34 16.10 is hereby revised and re-issued in its entirety to revise section 2.1.8.1.

• Replace Section 08 34 16.10 dated 2 August 2024 with attached revised Specification Section 08 34 16.10 dated 9 September 2024.

ITEM 01.1-3 Refer to attached Specification Section 09 06 00 – SCHEDULE OF FINISHES, dated 9 September 2024:

A. Specification Section 09 06 00 is hereby revised and re-issued in its entirety to revise change the number of color boards.

• Replace Section 09 06 00 dated 2 August 2024 with attached revised Specification Section 09 06 00 dated 9 September 2024.

MODIFICATIONS TO THE DRAWINGS

ITEM 01.2-1 Refer to attached Sheet G-002 – SHEET INDEX, dated 9 September 2024:

A. Sheet G-002 is hereby revised and re-issued in its entirety to add additional sheets.

• Replace Sheet G-002 dated 2 August 2024 with attached revised Sheet G-002 dated 9 September 2024.

ITEM 01.2-2 Refer to attached Sheet G-201 – SPECIAL INSPECTIONS, dated 9 September 2024:

A. Sheet G-201 is hereby issued in its entirety to provide direction.

ITEM 01.2-3 Refer to attached Sheet G-202 – SPECIAL INSPECTIONS, dated 9 September 2024:

A. Sheet G-202 is hereby issued in its entirety to provide direction.

ITEM 01.2-4 Refer to attached Sheet G-203 – SPECIAL INSPECTIONS, dated 9 September 2024:

A. Sheet G-203 is hereby issued in its entirety to provide direction.

ITEM 01.2-5 Refer to attached Sheet A101 – FLOOR PLAN, dated 9 September 2024:

A. Sheet A101 is hereby revised and re-issued in its entirety to revise keynotes.

• Replace Sheet A101 dated 2 August 2024 with attached revised Sheet A101 dated 9 September 2024.

ITEM 01.2-6 Refer to attached Sheet A103 – ROOF PLAN, dated 9 September 2024:

A. Sheet A-103 is hereby revised and re-issued in its entirety to revise exhaust penetrations.

• Replace Sheet A-103 dated 2 August 2024 with attached revised Sheet A-103 dated 9 September 2024.

ITEM 01.2-7 Refer to attached Sheet A104 – HANGAR BAY FLOOR PAINT STRIPING PLAN, dated 9 September 2024:

A. Sheet A-104 is hereby issued in its entirety.

ITEM 01.2-8 Refer to attached Sheet A201 – BUILDING ELEVATIONS, dated 9 September 2024:

A. Sheet A-201 is hereby revised and re-issued in its entirety to add section cuts.

FSB | DefineDesignDeliver

• Replace Sheet A-201 dated 2 August 2024 with attached revised Sheet A-201 dated 9 September 2024.

ITEM 01.2-9 Refer to attached Sheet A500 – DETAILS, dated 9 September 2024:

A. Sheet A-500 is hereby revised and re-issued in its entirety to revise detail section.

• Replace Sheet A-500 dated 2 August 2024 with attached revised Sheet A-500 dated 9 September 2024.

ITEM 01.2-10 Refer to attached Sheet A501 – DETAILS, dated 9 September 2024:

A. Sheet A-501 is hereby revised and re-issued in its entirety to add new detail sections.

• Replace Sheet A-501 dated 2 August 2024 with attached revised Sheet A-501 dated 9 September 2024.

ITEM 01.2-11 Refer to attached Sheet S-001 – GENERAL NOTES, dated 9 September 2024:

A. Sheet S-001 is hereby revised and re-issued in its entirety to revise SOILS/FOUNDATION NOTE 3.

• Replace Sheet S-001 dated 2 August 2024 with attached revised Sheet S-001 dated 9 September 2024.

ITEM 01.2-12 Refer to attached Sheet SB102 – SLAB PLAN, dated 9 September 2024:

A. Sheet SB102 is hereby revised and re-issued in its entirety to revise Slab Plan Note.

• Replace Sheet SB102 dated 2 August 2024 with attached revised Sheet SB102 dated 9 September 2024.

ITEM 01.2-13 Refer to attached Sheet SB506 – FOUNDATION DETAILS, dated 9 September 2024:

A. Sheet SB506 is hereby revised and re-issued in its entirety to revise section details.

• Replace Sheet SB506 dated 2 August 2024 with attached revised Sheet SB506 dated 9 September 2024.

ITEM 01.2-14 Refer to attached Sheet SB507 – FOUNDATION DETAILS, dated 9 September 2024:

A. Sheet SB507 is hereby revised and re-issued in its entirety to add new section details.

• Replace Sheet SB507 dated 2 August 2024 with attached revised Sheet SB507 dated 9 September 2024.

ITEM 01.2-15 Refer to attached Sheet SB508 – FOUNDATION DETAILS, dated 9 September 2024:

A. Sheet SB508 is hereby issued in its entirety.

ITEM 01.2-16 Refer to attached Sheet EG502 – GROUNDING AND LIGHTNING PROTECTION DETAILS, dated 9 September 2024:

A. Sheet EG502 is hereby revised and re-issued in its entirety to remove static grounding receptacle plan view.

• Replace Sheet EG502 dated 2 August 2024 with attached revised Sheet EG502 dated 9 September 2024.