Addendum 3 - SB102-SLAB PLAN.pdf

PDF 238 KB Posted

Attached to
Construct Corrosion Control Facility
Solicitation number
W50S78-24-B-0002
Issued by

About this file

This document appears to be an addendum related to a federal contract opportunity. The key details are:

The solicitation is for the construction of a new 12,200 square foot Corrosion Control Facility for the Texas Air National Guard at Joint Base San Antonio - Kelly Field Annex. The project has a base bid and four options including translucent fiberglass panels, screen wall, alternate roof, and epoxy flooring. The contract will be a single firm fixed-price contract with a period of performance of 540 calendar days. The procurement is set aside 100% for Small Businesses under NAICS code 236220 with a size standard of $45 million. The solicitation will include brand name items for compatibility with existing systems. A pre-bid conference and site visit will be held, and questions must be submitted 5 days prior to bid opening. The federal agency involved is the Department of the Army National Guard.

View the file

Other files

File Type Posted
Corrosion Control Facility - Abstract of Bidders - REVISED - 20240924.pdf PDF
Corrosion Control Facility - Abstract of Bidders 20240918.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 05 - 20240913.pdf PDF
Addendum 3 - SB508-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB507-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB506-FOUNDATION DETAILS.pdf PDF
Addendum 3 - S-001-GENERAL NOTES.pdf PDF
Addendum 3 - 01 14 00 - WORK RESTRICTIONS.pdf PDF
Addendum 3 - A-201-BUILDING ELEVATIONS.pdf PDF
Addendum 3 - G-202-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - G-203-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - 08 34 16.10 - HORIZONTAL ROLLING STEEL DOORS.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 04 - 20240910.pdf PDF
Addendum 03 Cover Page.pdf PDF
Addendum 3 - G-002-SHEET INDEX.pdf PDF
Attachment 13 - Kelly Annex CORROSION CONTROL-TOPO.pdf PDF
Addendum 3 - 09 06 00 - SCHEDULES OF FINISHES.pdf PDF
Addendum 3 - A-104-HANGAR BAY FLOOR PAINT STRIPING PLAN.pdf PDF
Addendum 3 - A-101-FLOOR PLAN.pdf PDF
Addendum 3 - A-103-ROOF PLAN.pdf PDF
Addendum 3 - A-500-DETAILS.pdf PDF
Addendum 3 - EG502-GROUNDING AND LIGHTNING PROTECTION DETAILS.pdf PDF
Attachment 12 - JBSA-Soil Management Plan - Signed Jan 22.pdf PDF
Addendum 3 - A-501-DETAILS.pdf PDF
Addendum 3 - G-201-SPECIAL INSPECTIONS.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 230 (20240910).pdf PDF
ADDENDUM 2- SPECIFICATIONS -08 34 16.10 -- DRAWING - A-603.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 03 - 20240905.pdf PDF
Attachment 11 - Geotechical report - TX ANG CC Facility.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 02 - 20240829.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 11 (20240829).pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 5 (20240823).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 01 - 20240823.pdf PDF
ADDENDUM 1 - SPECIFICATIONS VOL 1 - SECTION 08 71 00 DOOR HARDWARE.pdf PDF
Pre_Bid_Site Visit_Corrosion Control_Attendance_Sheet 20_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides_Corrosion Control 20 Aug 24.pptx PPTX presentation
Attachment 1 - TX-ANG_CORROSION CONTRAOL HANGAR_TYPE B3_DRAWINGS.pdf PDF
Attachment 8 - Trane Redacted.pdf PDF
Attachment 10 - Monaco Redacted.pdf PDF
Attachment 6 - Access and staging site plan.pdf PDF
Attachment 5 - Industrial Security SOW.pdf PDF
Attachment 4 - STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 9 - Falcon Redacted.pdf PDF
Attachment 7 - DDC Redacted.pdf PDF
Attachment 1.a. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (1-74) 2024.08.02.pdf PDF
W50S7824B0002 Corrosion Control Facility -Solicitation - 20240809.pdf PDF
Attachment 3 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 2 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 1.b. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (75-136) 2024.08.02.pdf PDF
Attachment 2 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 1 SPECIFICATIONS 2024.08.02.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A A

B B

C C

D

1'-0" 27'-10" 27'-0" 1'-2" 22'-9 1/2" 2'-2 1/2" 24'-2" 25'-0" 22'-0"

54'-10" 96'-2"

152'-2"

'-0

'-1 0"

'-0

'-1 0"

'-4

'-6

99'-6"

100'-0"

4" 26'-8 3/8" 1'-1 5/8" 27'-0"

1'-0"

1' -3

STEP

ST

EP

SB501

G5

SB501

D3

SB502

F5

SB502

D5

SB501

F3

SB505

A3

SB507

A2

SB503

B6

TRENCH

SP

AN

SP

AN

1' -4

'-3

/2

1' -4

'-3

/2

1' -4

1"

J O

IN

T

4"4"

'-0

6' -4

2'

-2

'-1

5/

8" 6'

-1

/8

'-7

1'

-7

1" J

O

IN

T 4'

-0

4" 1'-3" 26'-7" 27'-0" 1'-2" 25'-0" 24'-2" 23'-9" 1'-3" 4"

17'-2" 24'-2" 20'-1 1/2"

3'-7 1/2"

1'-3" 20'-9" 1'-3" 4"

1' -7

8'

-6

9"4"

3/

8"

SB506

A4

7 TYP

SB506

A6

SB503

E4

C J

C J

HANGAR DOOR RAILS

99'-6"

100'-0"

SB506

E6

SB502

F3

SB507

D2

SB501

D5

SB503

B2

SB503

F2

SB505

D3

SB505

A6

SB505

D6

SB502

A5

SB503

F6

2'-10 1/2" 6'-4"

1'-0" 4" 18'-3" 1'-4" 7'-11" 10'-4" 1'-4" 18'-3" 1'-4" 18'-4 1/2" 1'-4"

E E

SB507

F2

SB507

A4

TYPTYP

SB507

F2

SB507

A4

TYPTYP

3'-4"3'-4" 4"

3'-4" 1'-10" 1'-2"

3'-0" 3'-4"

SB503

A4

5'-0" 6'-4" 6'-8" 6'-4"

3' -4

4'

-1 0"

SB501

A5

SB501

A3

SB502

D3

4' -0

1/ 8"

1/ 8"

"99'-6"

99'-4 3/4"

99'-6"

99'-4 3/4"

100'-0"

99'-8"

TYP (UNO)

SB502

A3

SB505

F3

SP

AN

SP

AN

SPAN

1" JOINT

SP

AN

SPAN

SPAN

5"

7'-9" 1"

RAIL TRENCH DRAIN,

TYP

59'-10"

NOTE 1

CJCJ

SB504

E3

SB504

A3

SB504

A6

END OF RAIL TO STOP 1'-0"

BEFORE END OF DOOR, TYP

RECESS SLAB AT

SHOWERS 4".

REFER ARCH

AND DETAILS

4'-0" 1" JOINT

4' -0

1"

J O

IN

T

1" JOINT 4'-0"

99'-10"

99'-8"

99'-8"

'-1

0"

'-0

SUMP BELOW AND

18X18 REMOVABLE

COVER PLATE

99'-8"

99'-8"

SL

O

PE

SL

O

PE

SL

O

PE

1" / 12"

1/2" / 12"

1"

1" / 12"

1"

4'-0"

S-005 D6

S-005 A5

SLAB PLAN NOTES

8" STRUCTURAL CONCRETE SLAB OVER 12" VOID

FORMS

PARALLEL TO SPAN: #6 AT 9" OC T&B

PERPENDICULAR TO SPAN: #4 AT 18" OC T&B

10" STRUCTURAL CONCRETE SLAB OVER 12" VOID

FORMS.

PARALLEL TO SPAN: #6 AT 6" OC T&B

PERPENDICULAR TO SPAN: #4 AT 16" OC T&B

8" RIBBED MAT CONCRETE SLAB

SLAB REINFORCEMENT: #6 AT 6" OC EW

RIB REINFORCEMENT: (3) #6 BOT

(1) ADD'L #6 TOP

(NOTE: EXTERIOR RIBBED MAT BEARS DIRECTLY

ON SUBGRADE (NO CARTON FORMS THIS AREA

10" STRUCTURAL CONCRETE SLAB OVER 12" VOID

FORMS. (APPROACH/BRIDGE)

PARALLEL TO SPAN: #6 AT 6" OC T&B

PERPENDICULAR TO SPAN: #4 AT 12" OC T&B

6" CONCRETE STOOP (PROVIDE VOID FORMS AND

SOIL RETAINERS FROM BUILDING FOUNDATION

EDGE OUT 2'-0")

PARALLEL TO SPAN: #4 AT 10" OC MID-DEPTH

PERPEND'R TO SPAN: #4 AT 18" OC MID-DEPTH

8" CONCRETE STOOP (PROVIDE VOID FORMS AND

SOIL RETAINERS FROM BUILDING FOUNDATION

EDGE OUT 5'-0")

PARALLEL TO SPAN: #6 AT 6" OC BOTTOM

PERPEND'R TO SPAN: #4 AT 12" OC BOTTOM

FEATHER HANGAR SLAB UP TO DOOR THRESHOLD

(SLOPE NOT TO EXCEED 1.5%)

GC TO COORDINATE COLUMN BLOCKOUTS

NEEDED FOR ENGINEERED METAL BUILDING

COLUMN INSTALLATION. REFER A6/S-003

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

20190320

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

TX

AN

G Pr oj ec t N um be r:

KE

LL

JB

SA

Ke lly A nn ex , T X

Te xa s Ai r N at io na l G ua rd 9t h

FW

Co rro sio n Co nt ro l F ac ilit y

NDM

A

B C D

A B C D

E F G H

E F G

H I

I

C :\U sers\nolm stead\D ocum ents\90320_Stru_nolm steadFK74B.rvt 09/09/24 16:51:32

2 AUGUST 2024

SB102

SLAB PLAN

BJW

CGH

CGH

SCALE: 1/8" = 1'-0"

SLAB PLANA6

0 4' 8' 16'

1/8" = 1'-0"

N

1 ADDENDUM 03 09/09/2024

File details come from the government source that posted it. Updated .