Addendum 3 - SB102-SLAB PLAN.pdf

PDF 238 KB Posted

Attached to
Construct Corrosion Control Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0002
Issued by
Department of the Army National Guard

About this file

This document appears to be an addendum related to a federal contract opportunity. The key details are:

The solicitation is for the construction of a new 12,200 square foot Corrosion Control Facility for the Texas Air National Guard at Joint Base San Antonio - Kelly Field Annex. The project has a base bid and four options including translucent fiberglass panels, screen wall, alternate roof, and epoxy flooring. The contract will be a single firm fixed-price contract with a period of performance of 540 calendar days. The procurement is set aside 100% for Small Businesses under NAICS code 236220 with a size standard of $45 million. The solicitation will include brand name items for compatibility with existing systems. A pre-bid conference and site visit will be held, and questions must be submitted 5 days prior to bid opening. The federal agency involved is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Corrosion Control Facility, newest first.
File Type Posted
Corrosion Control Facility - Abstract of Bidders - REVISED - 20240924.pdf PDF
Corrosion Control Facility - Abstract of Bidders 20240918.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 05 - 20240913.pdf PDF
Addendum 3 - SB507-FOUNDATION DETAILS.pdf PDF
Addendum 3 - S-001-GENERAL NOTES.pdf PDF
Addendum 3 - SB506-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB508-FOUNDATION DETAILS.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 230 (20240910).pdf PDF
Attachment 12 - JBSA-Soil Management Plan - Signed Jan 22.pdf PDF
Addendum 3 - G-201-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-501-DETAILS.pdf PDF
Attachment 13 - Kelly Annex CORROSION CONTROL-TOPO.pdf PDF
Addendum 3 - G-002-SHEET INDEX.pdf PDF
Addendum 3 - EG502-GROUNDING AND LIGHTNING PROTECTION DETAILS.pdf PDF
Addendum 3 - A-104-HANGAR BAY FLOOR PAINT STRIPING PLAN.pdf PDF
Addendum 3 - 09 06 00 - SCHEDULES OF FINISHES.pdf PDF
Addendum 3 - 08 34 16.10 - HORIZONTAL ROLLING STEEL DOORS.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 04 - 20240910.pdf PDF
Addendum 3 - G-203-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-500-DETAILS.pdf PDF
Addendum 3 - A-103-ROOF PLAN.pdf PDF
Addendum 3 - A-101-FLOOR PLAN.pdf PDF
Addendum 03 Cover Page.pdf PDF
Addendum 3 - G-202-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-201-BUILDING ELEVATIONS.pdf PDF
Addendum 3 - 01 14 00 - WORK RESTRICTIONS.pdf PDF
ADDENDUM 2- SPECIFICATIONS -08 34 16.10 -- DRAWING - A-603.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 03 - 20240905.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 11 (20240829).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 02 - 20240829.pdf PDF
Attachment 11 - Geotechical report - TX ANG CC Facility.pdf PDF
ADDENDUM 1 - SPECIFICATIONS VOL 1 - SECTION 08 71 00 DOOR HARDWARE.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 01 - 20240823.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 5 (20240823).pdf PDF
Pre-Proposal Site Visit Slides_Corrosion Control 20 Aug 24.pptx PPTX presentation
Pre_Bid_Site Visit_Corrosion Control_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 1 - TX-ANG_CORROSION CONTRAOL HANGAR_TYPE B3_DRAWINGS.pdf PDF
Attachment 1.b. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (75-136) 2024.08.02.pdf PDF
Attachment 2 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 1 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 6 - Access and staging site plan.pdf PDF
W50S7824B0002 Corrosion Control Facility -Solicitation - 20240809.pdf PDF
Attachment 3 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 2 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 4 - STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 9 - Falcon Redacted.pdf PDF
Attachment 1.a. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (1-74) 2024.08.02.pdf PDF
Attachment 10 - Monaco Redacted.pdf PDF
Attachment 5 - Industrial Security SOW.pdf PDF
Attachment 7 - DDC Redacted.pdf PDF
Attachment 8 - Trane Redacted.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A A

B B

C C

D

1'-0" 27'-10" 27'-0" 1'-2" 22'-9 1/2" 2'-2 1/2" 24'-2" 25'-0" 22'-0"

54'-10" 96'-2"

152'-2"

'-0

'-1 0"

'-0

'-1 0"

'-4

'-6

99'-6"

100'-0"

4" 26'-8 3/8" 1'-1 5/8" 27'-0"

1'-0"

1' -3

STEP

ST

EP

SB501

G5

SB501

D3

SB502

F5

SB502

D5

SB501

F3

SB505

A3

SB507

A2

SB503

B6

TRENCH

SP

AN

SP

AN

1' -4

'-3

/2

1' -4

'-3

/2

1' -4

1"

J O

IN

T

4"4"

'-0

6' -4

2'

-2

'-1

5/

8" 6'

-1

/8

'-7

1'

-7

1" J

O

IN

T 4'

-0

4" 1'-3" 26'-7" 27'-0" 1'-2" 25'-0" 24'-2" 23'-9" 1'-3" 4"

17'-2" 24'-2" 20'-1 1/2"

3'-7 1/2"

1'-3" 20'-9" 1'-3" 4"

1' -7

8'

-6

9"4"

3/

8"

SB506

A4

7 TYP

SB506

A6

SB503

E4

C J

C J

HANGAR DOOR RAILS

99'-6"

100'-0"

SB506

E6

SB502

F3

SB507

D2

SB501

D5

SB503

B2

SB503

F2

SB505

D3

SB505

A6

SB505

D6

SB502

A5

SB503

F6

2'-10 1/2" 6'-4"

1'-0" 4" 18'-3" 1'-4" 7'-11" 10'-4" 1'-4" 18'-3" 1'-4" 18'-4 1/2" 1'-4"

E E

SB507

F2

SB507

A4

TYPTYP

SB507

F2

SB507

A4

TYPTYP

3'-4"3'-4" 4"

3'-4" 1'-10" 1'-2"

3'-0" 3'-4"

SB503

A4

5'-0" 6'-4" 6'-8" 6'-4"

3' -4

4'

-1 0"

SB501

A5

SB501

A3

SB502

D3

4' -0

1/ 8"

1/ 8"

"99'-6"

99'-4 3/4"

99'-6"

99'-4 3/4"

100'-0"

99'-8"

TYP (UNO)

SB502

A3

SB505

F3

SP

AN

SP

AN

SPAN

1" JOINT

SP

AN

SPAN

SPAN

5"

7'-9" 1"

RAIL TRENCH DRAIN,

TYP

59'-10"

NOTE 1

CJCJ

SB504

E3

SB504

A3

SB504

A6

END OF RAIL TO STOP 1'-0"

BEFORE END OF DOOR, TYP

RECESS SLAB AT

SHOWERS 4".

REFER ARCH

AND DETAILS

4'-0" 1" JOINT

4' -0

1"

J O

IN

T

1" JOINT 4'-0"

99'-10"

99'-8"

99'-8"

'-1

0"

'-0

SUMP BELOW AND

18X18 REMOVABLE

COVER PLATE

99'-8"

99'-8"

SL

O

PE

SL

O

PE

SL

O

PE

1" / 12"

1/2" / 12"

1"

1" / 12"

1"

4'-0"

S-005 D6

S-005 A5

SLAB PLAN NOTES

8" STRUCTURAL CONCRETE SLAB OVER 12" VOID

FORMS

PARALLEL TO SPAN: #6 AT 9" OC T&B

PERPENDICULAR TO SPAN: #4 AT 18" OC T&B

10" STRUCTURAL CONCRETE SLAB OVER 12" VOID

FORMS.

PARALLEL TO SPAN: #6 AT 6" OC T&B

PERPENDICULAR TO SPAN: #4 AT 16" OC T&B

8" RIBBED MAT CONCRETE SLAB

SLAB REINFORCEMENT: #6 AT 6" OC EW

RIB REINFORCEMENT: (3) #6 BOT

(1) ADD'L #6 TOP

(NOTE: EXTERIOR RIBBED MAT BEARS DIRECTLY

ON SUBGRADE (NO CARTON FORMS THIS AREA

10" STRUCTURAL CONCRETE SLAB OVER 12" VOID

FORMS. (APPROACH/BRIDGE)

PARALLEL TO SPAN: #6 AT 6" OC T&B

PERPENDICULAR TO SPAN: #4 AT 12" OC T&B

6" CONCRETE STOOP (PROVIDE VOID FORMS AND

SOIL RETAINERS FROM BUILDING FOUNDATION

EDGE OUT 2'-0")

PARALLEL TO SPAN: #4 AT 10" OC MID-DEPTH

PERPEND'R TO SPAN: #4 AT 18" OC MID-DEPTH

8" CONCRETE STOOP (PROVIDE VOID FORMS AND

SOIL RETAINERS FROM BUILDING FOUNDATION

EDGE OUT 5'-0")

PARALLEL TO SPAN: #6 AT 6" OC BOTTOM

PERPEND'R TO SPAN: #4 AT 12" OC BOTTOM

FEATHER HANGAR SLAB UP TO DOOR THRESHOLD

(SLOPE NOT TO EXCEED 1.5%)

GC TO COORDINATE COLUMN BLOCKOUTS

NEEDED FOR ENGINEERED METAL BUILDING

COLUMN INSTALLATION. REFER A6/S-003

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

20190320

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

TX

AN

G Pr oj ec t N um be r:

KE

LL

JB

SA

Ke lly A nn ex , T X

Te xa s Ai r N at io na l G ua rd 9t h

FW

Co rro sio n Co nt ro l F ac ilit y

NDM

A

B C D

A B C D

E F G H

E F G

H I

I

C :\U sers\nolm stead\D ocum ents\90320_Stru_nolm steadFK74B.rvt 09/09/24 16:51:32

2 AUGUST 2024

SB102

SLAB PLAN

BJW

CGH

CGH

SCALE: 1/8" = 1'-0"

SLAB PLANA6

0 4' 8' 16'

1/8" = 1'-0"

N

1 ADDENDUM 03 09/09/2024

File details come from the government source that posted it. Updated .