Attachment 6 - Access and staging site plan.pdf

PDF 735 KB Posted

Attached to
Construct Corrosion Control Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0002
Issued by
Department of the Army National Guard

About this file

This document is an attachment titled "Access and staging site plan" related to a federal contract opportunity for the Construction of a Corrosion Control Facility for the Texas Air National Guard at Joint Base San Antonio - Kelly Field Annex.

The key details are: The project includes construction of a 12,200 square foot Corrosion Control Facility with an environmentally controlled aircraft wash area, hangar space for corrosion treatment and repair, and supporting shops and administrative spaces. The project also includes 1,500 square yards of airfield pavement. The solicitation includes a base bid and four options: translucent fiberglass panels, screen wall, alternate roof, and epoxy flooring. The contract will be firm-fixed price with a 540 calendar day period of performance. The project is set aside 100% for small businesses under NAICS code 236220. A pre-bid site visit and conference are scheduled, and all questions and RFIs must be submitted by a specified deadline. The solicitation will only be available through the SAM.gov Contract Opportunities webpage.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Corrosion Control Facility, newest first.
File Type Posted
Corrosion Control Facility - Abstract of Bidders - REVISED - 20240924.pdf PDF
Corrosion Control Facility - Abstract of Bidders 20240918.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 05 - 20240913.pdf PDF
Addendum 3 - S-001-GENERAL NOTES.pdf PDF
Addendum 3 - SB506-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB508-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB102-SLAB PLAN.pdf PDF
Addendum 3 - SB507-FOUNDATION DETAILS.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 04 - 20240910.pdf PDF
Addendum 3 - G-203-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-500-DETAILS.pdf PDF
Addendum 3 - A-103-ROOF PLAN.pdf PDF
Addendum 3 - A-101-FLOOR PLAN.pdf PDF
Addendum 03 Cover Page.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 230 (20240910).pdf PDF
Attachment 12 - JBSA-Soil Management Plan - Signed Jan 22.pdf PDF
Addendum 3 - G-201-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-501-DETAILS.pdf PDF
Addendum 3 - G-202-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-201-BUILDING ELEVATIONS.pdf PDF
Addendum 3 - 01 14 00 - WORK RESTRICTIONS.pdf PDF
Attachment 13 - Kelly Annex CORROSION CONTROL-TOPO.pdf PDF
Addendum 3 - G-002-SHEET INDEX.pdf PDF
Addendum 3 - EG502-GROUNDING AND LIGHTNING PROTECTION DETAILS.pdf PDF
Addendum 3 - A-104-HANGAR BAY FLOOR PAINT STRIPING PLAN.pdf PDF
Addendum 3 - 09 06 00 - SCHEDULES OF FINISHES.pdf PDF
Addendum 3 - 08 34 16.10 - HORIZONTAL ROLLING STEEL DOORS.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 03 - 20240905.pdf PDF
ADDENDUM 2- SPECIFICATIONS -08 34 16.10 -- DRAWING - A-603.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 11 (20240829).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 02 - 20240829.pdf PDF
Attachment 11 - Geotechical report - TX ANG CC Facility.pdf PDF
ADDENDUM 1 - SPECIFICATIONS VOL 1 - SECTION 08 71 00 DOOR HARDWARE.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 5 (20240823).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 01 - 20240823.pdf PDF
Pre-Proposal Site Visit Slides_Corrosion Control 20 Aug 24.pptx PPTX presentation
Pre_Bid_Site Visit_Corrosion Control_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 1 - TX-ANG_CORROSION CONTRAOL HANGAR_TYPE B3_DRAWINGS.pdf PDF
Attachment 1.a. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (1-74) 2024.08.02.pdf PDF
Attachment 10 - Monaco Redacted.pdf PDF
Attachment 1.b. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (75-136) 2024.08.02.pdf PDF
Attachment 2 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 1 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 5 - Industrial Security SOW.pdf PDF
Attachment 7 - DDC Redacted.pdf PDF
Attachment 8 - Trane Redacted.pdf PDF
W50S7824B0002 Corrosion Control Facility -Solicitation - 20240809.pdf PDF
Attachment 3 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 2 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 4 - STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 9 - Falcon Redacted.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL

EC

Wtr Svc

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL

ELEC ELEC

ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC

W tr

Sv c

W tr

Sv c

W tr

Sv c

W tr

Sv c

Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc Wtr Svc

Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS Ex-SS

TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL

TEL

TEL

TEL

TEL

TEL

TEL

TEL

TEL

S S S SS S S S S

F-16CF-16C

0 15' 30' 60' N

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

20190320

TX

AN

G Pr oj ec t N um be r:

KE

LL

JB

SA

Ke lly

A nn ex , T

X

Te xa s Ai r N at io na l G ua rd

9t h

FW

Co rro sio n

Co nt ro l F ac ilit y

NDM

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

1525 S. 6th Street Springfield, IL 62703 phone: 217-788-2450 fax: 217-788-2503

RMH

LDH

LDH

2 AUGUST 2024

ACCESS AND STAGING PLAN

C-101

AutoCAD SHX Text

24" CMP

AutoCAD SHX Text E

AutoCAD SHX Text

24" CMP

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

SD

AutoCAD SHX Text

KP

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text

GM

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

ICV

AutoCAD SHX Text

ICV

AutoCAD SHX Text

ICV

AutoCAD SHX Text S

AutoCAD SHX Text TEMPORARY FENCE FOR WORK WITHIN CONTROLLED AREA, 1,060 L.F. RESTORE AT PROJECT COMPLETION.

AutoCAD SHX Text

EXISTING WASH RACK

AutoCAD SHX Text

EXISTING COVERED AIRCRAFT PARKING

AutoCAD SHX Text

EXISTING TAXI AND APRON PAVEMENT

AutoCAD SHX Text

PROPOSED TAXI AND APRON PAVEMENT

AutoCAD SHX Text

FRANK ANDREWS ROAD

AutoCAD SHX Text PROVIDE TEMPORARY GATE ACCESS FOR PROJECT DURATION. RESTORE AT PROJECT COMPLETION.

AutoCAD SHX Text

BILLY MITCHELL ROAD

AutoCAD SHX Text

A TEMPORARY CONSTRUCTION WAIVER WILL BE REQUIRED FOR WORK WITHIN THIS AREA.

AutoCAD SHX Text

CONTRACTOR STAGING AREA, RESTORE AT PROJECT COMPLETION.

AutoCAD SHX Text

PROPOSED CORROSION CONTROL FACILITY

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text I

File details come from the government source that posted it. Updated .