Attachment 3 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 2 SPECIFICATIONS 2024.08.02.pdf

PDF 15 MB Posted

Attached to
Construct Corrosion Control Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0002
Issued by
Department of the Army National Guard

About this file

This document appears to be Attachment 3 - Specifications for the construction of a new 12,200 square foot Corrosion Control Facility for the Texas Air National Guard at Joint Base San Antonio - Kelly Field Annex. The related federal contract opportunity is for a single firm fixed-price construction contract to provide all labor, materials, and equipment necessary for the facility. Key details include:

The facility will include an environmentally controlled aircraft wash area, hangar space for corrosion treatment and repair, paint prep and drying areas, abrasive blasting rooms, and administrative space. In addition to the base bid, the solicitation includes four contract options and several brand name items required for compatibility with existing systems. The contract duration is 540 calendar days. This project is set aside 100% for Small Businesses under NAICS code 236220 with a size standard of $45 million. A site visit and pre-bid conference will be held, and all questions/RFIs must be submitted 5 days prior to bid opening. The solicitation and related information will only be available through the SAM.gov Contract Opportunities page.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Corrosion Control Facility, newest first.
File Type Posted
Corrosion Control Facility - Abstract of Bidders - REVISED - 20240924.pdf PDF
Corrosion Control Facility - Abstract of Bidders 20240918.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 05 - 20240913.pdf PDF
Addendum 3 - S-001-GENERAL NOTES.pdf PDF
Addendum 3 - SB507-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB506-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB508-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB102-SLAB PLAN.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 04 - 20240910.pdf PDF
Addendum 3 - G-203-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-500-DETAILS.pdf PDF
Addendum 3 - A-103-ROOF PLAN.pdf PDF
Addendum 3 - A-101-FLOOR PLAN.pdf PDF
Addendum 03 Cover Page.pdf PDF
Attachment 13 - Kelly Annex CORROSION CONTROL-TOPO.pdf PDF
Addendum 3 - G-002-SHEET INDEX.pdf PDF
Addendum 3 - EG502-GROUNDING AND LIGHTNING PROTECTION DETAILS.pdf PDF
Addendum 3 - A-104-HANGAR BAY FLOOR PAINT STRIPING PLAN.pdf PDF
Addendum 3 - 09 06 00 - SCHEDULES OF FINISHES.pdf PDF
Addendum 3 - 08 34 16.10 - HORIZONTAL ROLLING STEEL DOORS.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 230 (20240910).pdf PDF
Attachment 12 - JBSA-Soil Management Plan - Signed Jan 22.pdf PDF
Addendum 3 - G-201-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-501-DETAILS.pdf PDF
Addendum 3 - G-202-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-201-BUILDING ELEVATIONS.pdf PDF
Addendum 3 - 01 14 00 - WORK RESTRICTIONS.pdf PDF
ADDENDUM 2- SPECIFICATIONS -08 34 16.10 -- DRAWING - A-603.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 03 - 20240905.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 11 (20240829).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 02 - 20240829.pdf PDF
Attachment 11 - Geotechical report - TX ANG CC Facility.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 01 - 20240823.pdf PDF
ADDENDUM 1 - SPECIFICATIONS VOL 1 - SECTION 08 71 00 DOOR HARDWARE.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 5 (20240823).pdf PDF
Pre-Proposal Site Visit Slides_Corrosion Control 20 Aug 24.pptx PPTX presentation
Pre_Bid_Site Visit_Corrosion Control_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 1 - TX-ANG_CORROSION CONTRAOL HANGAR_TYPE B3_DRAWINGS.pdf PDF
Attachment 1.a. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (1-74) 2024.08.02.pdf PDF
Attachment 10 - Monaco Redacted.pdf PDF
W50S7824B0002 Corrosion Control Facility -Solicitation - 20240809.pdf PDF
Attachment 4 - STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 9 - Falcon Redacted.pdf PDF
Attachment 1.b. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (75-136) 2024.08.02.pdf PDF
Attachment 2 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 1 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 6 - Access and staging site plan.pdf PDF
Attachment 5 - Industrial Security SOW.pdf PDF
Attachment 7 - DDC Redacted.pdf PDF
Attachment 8 - Trane Redacted.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Type B-3 100% Submission

Specifications – Volume 2

NGB Contract: W9133L16D0005

Task Order: W912L1-19-F-0013

TX ANG PN: KELL169014

2 AUGUST 2024

PROJECT MANUAL

02 AUGUST 2024

Construct Corrosion Control Facility

PN: KELL169014

Joint Base San Antonio, Kelly Annex, TX

Civil Structural

Architectural Fire Protection

Mechanical Electrical document1 Page 1 of 1 5801 Broadway Extension, Suite 500, Oklahoma City, Oklahoma 73118-7436

Telephone (405) 840-2931 Facsimile (405) 842-7750 Website www.fsb-ae.com

J.T.

LITTLE JR.

20555

MICHAEL

JAMES

TURNER

a5815 document1 Page 1 of 1 5801 Broadway Extension, Suite 500, Oklahoma City, Oklahoma 73118-7436

Telephone (405) 840-2931 Facsimile (405) 842-7750 Website www.fsb-ae.com

JASON

MARK

ELLIOTT

30719

MERRITT

NEAL

OLMSTEAD

19139

NGBJV/ TX CORROSI ON CONTROL FACI LI TY PN KELL169014

KELLY FI ELD ANNEX B- 3 SUBMI SSI ON, 02 AUGUST, 2024

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 17. 00 20 COST- LOADED NETWORK ANALYSI S SCHEDULES ( NAS)

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REQUI REMENTS AND REPORTI NG

01 33 39. 10 ADVANCED MODELI NG ( BI M/ CI M/ GI S/ CAD) REQUI REMENTS

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00 QUALI TY CONTROL

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 ENVI RONMENTAL CONTROLS

01 58 00 PROJECT I DENTI FI CATI ON

01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 91 00. 15 BUI LDI NG COMMI SSI ONI NG

01 91 19 BUI LDI NG ENCLOSURE COMMI SSI ONI NG

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOI ST FRAMI NG

05 30 00 STEEL DECKS

05 40 00 COLD- FORMED METAL FRAMI NG

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS

06 61 16 SOLI D SURFACI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS

07 21 13 BOARD AND BLOCK I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 22 00 ROOF AND DECK I NSULATI ON

07 27 10 BUI LDI NG AI R BARRI ER SYSTEM

07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS

07 27 36 SPRAY FOAM AI R BARRI ERS

07 42 63 FABRI CATED WALL PANEL ASSEMBLI ES

07 60 00 FLASHI NG AND SHEET METAL

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

PROJECT TABLE OF CONTENTS Page 1

07 84 00 FI RESTOPPI NG

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMI NUM DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 33 23 OVERHEAD COI LI NG DOORS

08 34 16. 10 HORI ZONTAL ROLLI NG STEEL DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLI ES

08 60 45 TRANSLUCENT PANELS

08 71 00 DOOR HARDWARE

08 81 00 GLAZI NG

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 06 00 SCHEDULES FOR FI NI SHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMI C, QUARRY, AND GLASS TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 67 23. 15 FUEL RESI STI VE RESI NOUS FLOORI NG, 3- COAT SYSTEM

09 67 23. 16 FUEL RESI STI VE RESI NOUS FLOORI NG, 5- COAT SYSTEM

09 68 00 CARPETI NG

09 90 00 PAI NTS AND COATI NGS

09 96 00 HI GH- PERFORMANCE COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00. 20 I NTERI OR SI GNAGE

10 14 01 EXTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 26 00 WALL AND DOOR PROTECTI ON

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

10 51 13 METAL LOCKERS

10 53 01 MANUFACTURED CANOPY

DI VI SI ON 11 - EQUI PMENT

11 94 00 RI GI D RAI L FALL RESTRAI NT SYSTEM

11 94 10 ROOFTOP FALL PROTECTI ON ANCHORS

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WI NDOW SHADES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 METAL BUI LDI NG SYSTEMS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 WET PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON

21 30 00 FI RE PUMPS

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

22 15 19. 19 20 NONLUBRI CATED ROTARY SCREW AI R COMPRESSORS ( 100 HP AND

LARGER)

22 15 26. 00 20 HI GH AND MEDI UM PRESSURE COMPRESSED AI R PI PI NG

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 15 COMMON PI PI NG FOR HVAC

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 08 00. 00 20 COMMI SSI ONI NG OF MECHANI CAL AND PLUMBI NG SYSTEMS

23 08 01. 00 20 TESTI NG I NDUSTRI AL VENTI LATI ON SYSTEMS

23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC

23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC

23 09 13. 34 40 CONTROL VALVES, SELF- CONTAI NED

23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG

CONTROL SYSTEMS

23 09 53. 00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 09 93 SEQUENCES OF OPERATI ON FOR HVAC CONTROL

23 11 20 FACI LI TY GAS PI PI NG

23 23 00 REFRI GERANT PI PI NG

23 30 00 HVAC AI R DI STRI BUTI ON

23 31 13. 00 40 METAL DUCTS

23 34 23. 00 40 HVAC POWER VENTI LATORS

23 35 19. 00 20 I NDUSTRI AL VENTI LATI ON AND EXHAUST

23 37 13. 00 40 DI FFUSERS, REGI STERS, AND GRI LLES

23 80 20. 00 10 GAS- FI RED HEATI NG EQUI PMENT

23 81 00 DECENTRALI ZED UNI TARY HVAC EQUI PMENT

23 82 16. 00 40 AI R COI LS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11. 01 CYBERSECURI TY FOR LOW I MPACT HVAC CONTROL SYSTEMS

25 05 11. 02 CYBERSECURI TY FOR LOW I MPACT LI GHTI NG CONTROL SYSTEMS

25 05 11. 04 CYBERSECURI TY FOR MODERATE I MPACT FI RE PROTECTI ON CONTROL

SYSTEMS

25 08 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM TESTI NG

25 10 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM ( UMCS) FRONT END AND

I NTEGRATI ON

DI VI SI ON 26 - ELECTRI CAL

26 05 19. 00 10 I NSULATED WI RE AND CABLE

26 05 73 POWER SYSTEM STUDI ES

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 24 13 SWI TCHBOARDS

26 35 43 400- HERTZ ( HZ) SOLI D STATE FREQUENCY CONVERTER

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 42 13 GALVANI C ( SACRI FI CI AL) ANODE CATHODI C PROTECTI ON ( GACP)

SYSTEM

26 51 00 I NTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

PROJECT TABLE OF CONTENTS Page 3

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM,

ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 32 19. 13 GEOGRI D SOI L STABI LI ZATI ON

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19. 61 SEALI NG OF JOI NTS I N RI GI D PAVEMENT

32 11 20 BASE COURSE FOR RI GI D PAVI NG AND SI DEWALK

32 13 14. 13 CONCRETE PAVI NG FOR AI RFI ELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 16 19 CONCRETE CURBS, GUTTERS AND SI DEWALKS

32 17 23 PAVEMENT MARKI NGS

32 92 19 SEEDI NG

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORMWATER UTI LI TI ES

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT

46 25 14 COALESCI NG OI L- WATER SEPARATORS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

SECTI ON 21 13 13

WET PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON

08/ 20

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF MECHANI CAL ENGI NEERS ( ASME)

ASME B16. 1 ( 2022) Gr ay I r on Pi pe Fl anges and Fl anged Fi t t i ngs Cl asses 25, 125, and 250

ASME B16. 3 ( 2021) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300

ASME B16. 4 ( 2021) Gr ay I r on Thr eaded Fi t t i ngs;

Cl asses 125 and 250

ASME B16. 21 ( 2021) Nonmet al l i c Fl at Gasket s f or Pi pe Fl anges

AMERI CAN SOCI ETY OF SANI TARY ENGI NEERI NG ( ASSE)

ASSE 1013 ( 2021) Per f or mance Requi r ement s f or Reduced Pr essur e Pr i nci pl e Backf l ow Pr event i on Assembl i es

ASSE 1015 ( 2011) Per f or mance Requi r ement s f or Doubl e Check Backf l ow Pr event i on Assembl i es and Doubl e Check Fi r e Pr ot ect i on Backf l ow Pr event i on Assembl i es - ( ANSI appr oved 2010)

AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)

AWWA C104/ A21. 4 ( 2022) Cement - Mor t ar Li ni ng f or Duct i l e- I r on Pi pe and Fi t t i ngs f or Wat er

AWWA C110/ A21. 10 ( 2021) Duct i l e- I r on and Gr ay- I r on Fi t t i ngs

AWWA C111/ A21. 11 ( 2017) Rubber - Gasket Joi nt s f or Duct i l e- I r on Pr essur e Pi pe and Fi t t i ngs

AWWA C203 ( 2020) Coal - Tar Pr ot ect i ve Coat i ngs and Li ni ngs f or St eel Wat er Pi pel i nes - Enamel and Tape - Hot - Appl i ed

AWWA M14 ( 4t h Ed) Backf l ow Pr event i on and Cr oss- Connect i on Cont r ol ; Recommended Pr act i ces

SECTI ON 21 13 13 Page 1

ASTM I NTERNATI ONAL ( ASTM)

ASTM A47/ A47M ( 1999; R 2022; E 2022) St andar d Speci f i cat i on f or Fer r i t i c Mal l eabl e I r on Cast i ngs

ASTM A53/ A53M ( 2022) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess

ASTM A135/ A135M ( 2009; R2014) St andar d Speci f i cat i on f or El ect r i c- Resi st ance- Wel ded St eel Pi pe

ASTM A153/ A153M ( 2023) St andar d Speci f i cat i on f or Zi nc Coat i ng ( Hot - Di p) on I r on and St eel Har dwar e

ASTM A183 ( 2014; R 2020) St andar d Speci f i cat i on f or Car bon St eel Tr ack Bol t s and Nut s

ASTM A536 ( 1984; R 2019; E 2019) St andar d Speci f i cat i on f or Duct i l e I r on Cast i ngs

FM GLOBAL ( FM)

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de ht t p: / / www. appr oval gui de. com/

I NTELLI GENCE COMMUNI TY STANDARD ( I CS)

I CS 705- 1 ( 2010) Physi cal and Techni cal Secur i t y St andar d f or Sensi t i ve Compar t ment ed I nf or mat i on Faci l i t i es

MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS

I NDUSTRY ( MSS)

MSS SP- 71 ( 2018) Gr ay I r on Swi ng Check Val ves, Fl anged and Thr eaded Ends

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 13 ( 2022) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems

NFPA 20 ( 2022; TI A 21- 1; TI A 21- 2) St andar d f or t he I nst al l at i on of St at i onar y Pumps f or Fi r e Pr ot ect i on

NFPA 24 ( 2022) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser vi ce Mai ns and Thei r Appur t enances

NFPA 101 ( 2021; TI A 21- 1) Li f e Saf et y Code

NFPA 291 ( 2022) Recommended Pr act i ce f or Fi r e Fl ow Test i ng and Mar ki ng of Hydr ant s

SECTI ON 21 13 13 Page 2

NATI ONAL I NSTI TUTE FOR CERTI FI CATI ON I N ENGI NEERI NG TECHNOLOGI ES

( NI CET)

NI CET 1014- 7 ( 2012) Pr ogr am Det ai l Manual f or Cer t i f i cat i on i n t he Fi el d of Fi r e Pr ot ect i on Engi neer i ng Technol ogy ( Fi el d Code 003) Subf i el d of Aut omat i c Spr i nkl er Syst em Layout

UNDERWRI TERS LABORATORI ES ( UL)

UL 199 ( 2020) UL St andar d f or Saf et y Aut omat i c Spr i nkl er s f or Fi r e- Pr ot ect i on Ser vi ce

UL 262 ( 2004; Repr i nt Oct 2011) Gat e Val ves f or Fi r e- Pr ot ect i on Ser vi ce

UL 312 ( 2010; Repr i nt Mar 2018) UL St andar d f or Saf et y Check Val ves f or Fi r e- Pr ot ect i on Ser vi ce

UL 789 ( 2004; Repr i nt May 2017) UL St andar d f or Saf et y I ndi cat or Post s f or Fi r e- Pr ot ect i on Ser vi ce

UL Fi r e Pr ot Di r ( 2012) Fi r e Pr ot ect i on Equi pment Di r ect or y

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 600- 01 ( 2016; wi t h Change 6, 2021) Fi r e Pr ot ect i on Engi neer i ng f or Faci l i t i es

1. 2 SYSTEM DESCRI PTI ON

Pr ovi de wet pi pe spr i nkl er syst em( s) i n ar eas i ndi cat ed on t he dr awi ngs.

The syst em must meet t he r equi r ement s of NFPA 13 and UFC 3- 600- 01. Pi pe si zes must be det er mi ned by hydr aul i c cal cul at i ons.

1. 2. 1 Hydr aul i c Desi gn

1. 2. 1. 1 Basi s f or Cal cul at i ons

A wat er f l ow t est was per f or med on t he pot abl e wat er suppl y on 8/ 2/ 2017 and r esul t ed i n a st at i c pr essur e of 70 psi wi t h a r esi dual pr essur e of 22 psi whi l e f l owi ng 2555 gpm. Per f or m a new f i r e hydr ant f l ow t est pr i or t o shop dr awi ng submi t t al i n accor dance wi t h NFPA 291. Resul t s must i ncl ude hydr ant el evat i ons r el at i ve t o t he bui l di ng and hydr ant number / i dent i f i er s f or t he t est ed hydr ant s, i ncl udi ng whi ch wer e f l owed, whi ch had a gauge.

Thi s i nf or mat i on must be pr esent ed i n a t abul ar f or m i f mul t i pl e hydr ant s wer e f l owed. The r esul t s must be i ncl uded wi t h t he hydr aul i c cal cul at i ons. Hydr aul i c cal cul at i ons must be based on cont r act or per f or med f l ow t est not ed i n t hi s par agr aph wi t h 15 psi mar gi n of saf et y. Hydr aul i c cal cul at i ons must be based upon t he Hazen- Wi l l i ams f or mul a wi t h a " C" val ue not ed i n NFPA 13 f or pi pi ng, and C=100 f or exi st i ng under gr ound pi pi ng.

1. 2. 1. 2 Hydr aul i c Cal cul at i ons

a. Wat er suppl y cur ves and syst em r equi r ement s must be pl ot t ed on

SECTI ON 21 13 13 Page 3 semi - l ogar i t hmi c gr aph ( N̂ 1. 85) paper so as t o pr esent a summar y of t he compl et e hydr aul i c cal cul at i on.

b. Pr ovi de a summar y sheet l i s t i ng spr i nkl er s i n t he desi gn ar ea and t hei r r espect i ve hydr aul i c r ef er ence poi nt s, el evat i ons, mi ni mum di schar ge pr essur es and mi ni mum f l ows. El evat i ons of hydr aul i c r ef er ence poi nt s ( nodes) must be i ndi cat ed.

c. Document at i on must i dent i f y each pi pe i ndi v i dual l y and t he nodes connect ed t her et o. I ndi cat e t he di amet er , l engt h, f l ow, vel oci t y, f r i c t i on l oss, number and t ype f i t t i ngs, t ot al f r i c t i on l oss i n t he pi pe, equi val ent pi pe l engt h and Hazen- Wi l l i ams coef f i c i ent f or each pi pe.

d. Al l cal cul at i ons must i ncl ude t he backf l ow pr event er manuf act ur er ' s st at ed f r i ct i on l oss at t he desi gn f l ow or 8 psi f or doubl e check backf l ow pr event er , whi chever i s gr eat er .

e. Al l cal cul at i ons must be per f or med back t o t he act ual l ocat i on of t he f l ow t est , t aki ng i nt o account t he di r ect i on of f l ow i n t he ser vi ce mai n at t he t est l ocat i on.

f . For gr i dded syst ems, cal cul at i ons must show peaki ng of demand ar ea f r i ct i on l oss t o ver i f y t hat t he hydr aul i cal l y most demandi ng ar ea i s bei ng used. A f l ow di agr am i ndi cat i ng t he quant i t y and di r ect i on of f l ows must be i ncl uded.

1. 2. 1. 3 Desi gn Cr i t er i a

Hydr aul i cal l y desi gn t he syst em t o di schar ge a mi ni mum densi t y i n accor dance wi t h UFC 3- 600- 01, Tabl e 9- 3, f or t he Hazar d Cl assi f i cat i on i ndi cat ed on t he dr awi ngs. Hazar d c l assi f i cat i on shal l meet or exceed t hat r equi r ed by NFPA 13. Hydr aul i c cal cul at i ons must be i n accor dance wi t h t he Ar ea/ Densi t y Met hod of NFPA 13. Add an al l owance of 500 gpm at t he poi nt of connect i on f or ext er i or hose st r eams si nce t he hydr ant s ar e on t he pot abl e wat er suppl y. I ncl ude a 15 psi mar gi n of saf et y.

1. 2. 2 Spr i nkl er Cover age

Spr i nkl er s must be uni f or ml y spaced on br anch l i nes. Pr ovi de cover age t hr oughout 100 per cent of t he ar ea not ed on t he Cont r act dr awi ngs. Thi s i ncl udes, but i s not l i mi t ed t o, t el ephone r ooms, el ect r i cal equi pment r ooms ( r egar dl ess of t he f i r e r esi st ance r at i ng of t he encl osur e) , boi l er r ooms, swi t chgear r ooms, t r ansf or mer r ooms, at t ached el ect r i cal vaul t s and ot her el ect r i cal and mechani cal spaces. Cover age per spr i nkl er must be i n accor dance wi t h NFPA 13. Pr ovi de spr i nkl er s bel ow al l obst r uct i ons i n accor dance wi t h NFPA 13. Except i ons ar e as f ol l ows:

a. Spr i nkl er s may be omi t t ed f r om smal l r ooms whi ch ar e exempt ed f or speci f i c occupanci es i n accor dance wi t h NFPA 101.

1. 2. 3 Qual i f i ed Fi r e Pr ot ect i on Engi neer ( QFPE)

An i ndi v i dual who i s a l i censed pr of essi onal engi neer ( P. E. ) who has passed t he f i r e pr ot ect i on engi neer i ng wr i t t en exami nat i on admi ni st er ed by t he Nat i onal Counci l of Exami ner s f or Engi neer i ng and Sur veyi ng ( NCEES) and has r el evant f i r e pr ot ect i on engi neer i ng exper i ence, i ncl udi ng t hr ee pr oj ect s s i mi l ar t o t hi s one whi ch have been i n sat i sf act or y use f or at l east s i x mont hs. Ser vi ces of t he QFPE must i ncl ude:

SECTI ON 21 13 13 Page 4

a. Revi ewi ng SD- 02, SD- 03, and SD- 05 submi t t al packages and pr el i mi nar y t est pr ocedur es and r epor t s f or compl et eness and compl i ance wi t h t he pr ovi s i ons of t hi s speci f i cat i on. Wor ki ng ( shop) dr awi ngs and cal cul at i ons must be pr epar ed by, or pr epar ed under t he i mmedi at e super vi s i on of , t he QFPE. The QFPE must af f i x t hei r pr of essi onal engi neer i ng seal or submi t t al r evi ew st amp wi t h s i gnat ur e t o t he shop dr awi ngs, cal cul at i ons, and mat er i al dat a sheet s, i ndi cat i ng appr oval pr i or t o submi t t i ng t he shop dr awi ngs t o t he DFPE.

b. Pr ovi de a l et t er document i ng t hat t he SD- 02, SD- 03, and SD- 05 submi t t al package has been r evi ewed and not i ng al l out st andi ng comment s.

c. Per f or mi ng i n- pr ogr ess const r uct i on sur vei l l ance pr i or t o i nst al l at i on of cei l i ngs ( r ough- i n i nspect i on) .

d. Revi ewi ng SD- 06 t est pl ans and pr ocedur es and t est r epor t s f or compl et eness and compl i ance wi t h t he pr ovi s i ons of t hi s speci f i cat i on. The QFPE must af f i x t hei r r evi ew st amp wi t h s i gnat ur e t o t he t est pl ans and r epor t s i ndi cat i ng appr oval bef or e submi t t i ng t o t he DFPE.

e. Wi t nessi ng pr e- Gover nment and f i nal Gover nment f unct i onal per f or mance t est i ng and per f or mi ng a f i nal i nst al l at i on r evi ew.

f . Si gni ng appl i cabl e cer t i f i cat es under SD- 07.

1. 3 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Par t i al submi t t al s and submi t t al s not f ul l y compl yi ng wi t h NFPA 13 and t hi s speci f i cat i on sect i on must be r et ur ned di sappr oved wi t hout r evi ew. SD- 02, SD- 03 and SD- 05 must be submi t t ed s i mul t aneousl y.

Shop dr awi ngs ( SD- 02) , pr oduct dat a ( SD- 03) and cal cul at i ons ( SD- 05) must be pr epar ed by t he desi gner and combi ned and submi t t ed as one compl et e package, wi t h t he SD- 03 pr oduct dat a submi t t ed under separ at e t r ansmi t t al .

The QFPE must r evi ew t he SD- 02/ SD- 03/ SD- 05 submi t t al package f or compl et eness and compl i ance wi t h t he Cont r act pr ovi s i ons pr i or t o submi ssi on t o t he Gover nment . The QFPE must pr ovi de a Let t er of Conf i r mat i on t hat t hey have r evi ewed t he submi t t al package f or compl i ance wi t h t he cont r act pr ovi s i ons. Thi s l et t er must i ncl ude t hei r pr of essi onal engi neer st amp and si gnat ur e. Par t i al submi t t al s and submi t t al s not r evi ewed by t he QFPE wi l l be r et ur ned di sappr oved wi t hout r evi ew.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Qual i f i ed Fi r e Pr ot ect i on Engi neer ( QFPE) ; G

Spr i nkl er Syst em Desi gner ; G

Spr i nkl er Syst em I nst al l er ; G

SECTI ON 21 13 13 Page 5

SD- 02 Shop Dr awi ngs

Shop Dr awi ng; G

SD- 03 Pr oduct Dat a

Pi pe; G

Fi t t i ngs; G

Val ves, i ncl udi ng gat e, check, but t er f l y, and gl obe; G

Ri ser Check Val ves; G

Rel i ef Val ves; G

Spr i nkl er s ; G

Pi pe Hanger s and Suppor t s ; G

Spr i nkl er Al ar m Swi t ch; G

Val ve Super vi sor y ( Tamper ) Swi t ch; G

Fi r e Depar t ment Connect i on; G

Backf l ow Pr event i on Assembl y; G

Ai r Vent ; G

Hose Val ve; G

Namepl at es; G

Test Pr ocedur es

SD- 05 Desi gn Dat a

Hydr aul i c Cal cul at i ons; G

SD- 06 Test Repor t s

Pr el i mi nar y Test Pr ocedur es; G

Fi nal Test Pr ocedur es; G

Pr el i mi nar y Test Repor t ; G

Fi nal Test Repor t ; G

SD- 07 Cer t i f i cat es

Ver i f i cat i on of Compl i ant I nst al l at i on; G

Request f or Gover nment Fi nal Test ; G

SD- 10 Oper at i on and Mai nt enance Dat a

SECTI ON 21 13 13 Page 6

Post ed Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons; G

Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons; G

Spar e Par t s Dat a; G

SD- 11 Cl oseout Submi t t al s

As- bui l t dr awi ngs

1. 4 QUALI TY ASSURANCE

1. 4. 1 Pr econst r uct i on Submi t t al s

Wi t hi n 36 days of cont r act awar d but no l ess t han 14 days pr i or t o commenci ng wor k on si t e, t he pr i me Cont r act or must submi t t he SD- 01 Pr econst r uct i on Submi t t al s wi t h document at i on of qual i f i cat i ons f or r evi ew and appr oval . SD- 02, SD- 03 and SD- 05 submi t t al s r ecei ved pr i or t o t he r evi ew and appr oval of t he qual i f i cat i ons wi l l be r et ur ned Di sappr oved Wi t hout Revi ew.

1. 4. 1. 1 Shop Dr awi ng

Thr ee paper copi es and one di gi t al copy i n a f or mat accept abl e t o t he Cont r act i ng Of f i cer of t he shop dr awi ngs, no l at er t han 28 days pr i or t o t he st ar t of syst em i nst al l at i on. Wor ki ng dr awi ngs conf or mi ng t o t he r equi r ement s pr escr i bed i n NFPA 13 and must be no smal l er t han t he Cont r act Dr awi ngs. Each set of dr awi ngs must i ncl ude t he f ol l owi ng:

1. A descr i pt i ve i ndex wi t h dr awi ngs l i s t ed i n sequence by number . A l egend sheet i dent i f y i ng devi ce symbol s, nomencl at ur e, and convent i ons used i n t he package.

2. Fl oor pl ans dr awn t o a scal e not l ess t han 1/ 8- i nch equal s 1- f oot c l ear l y showi ng l ocat i ons of devi ces, equi pment , r i ser s, and ot her det ai l s r equi r ed t o c l ear l y descr i be t he pr oposed ar r angement . Text hei ght shal l be mi ni mum 1/ 10" .

3. Act ual cent er - t o- cent er di mensi ons bet ween spr i nkl er s on br anch l i nes and bet ween br anch l i nes; f r om end spr i nkl er s t o adj acent wal l s; f r om wal l s t o br anch l i nes; f r om spr i nkl er f eed mai ns, cr oss mai ns and br anch l i nes t o f i ni shed f l oor and r oof or cei l i ng. A det ai l must show t he di mensi on f r om t he spr i nkl er and spr i nkl er def l ect or t o t he cei l i ng i n f i ni shed ar eas.

4. Longi t udi nal and t r ansver se bui l di ng sect i ons showi ng t ypi cal br anch l i ne and cr oss mai n pi pe r out i ng, el evat i on of each t ypi cal spr i nkl er above f i ni shed f l oor and el evat i on of " c l oud" or f al se cei l i ngs i n r el at i on t o t he bui l di ng cei l i ngs.

5. Pl an and el evat i on v i ews whi ch est abl i sh t hat t he equi pment wi l l f i t t he al l ot t ed spaces wi t h c l ear ance f or i nst al l at i on and mai nt enance.

6. Enl ar ged r i ser l ayout pl ans and sect i on dr awi ngs dr awn t o a scal e of not l ess t han 1/ 2- i nch equal s 1- f oot t o show det ai l s of each syst em component , c l ear ances bet ween each ot her and f r om ot her equi pment and const r uct i on i n t he r oom.

7. Det ai l s of each t ype of r i ser assembl y, pi pe hanger , and r est r ai nt of

SECTI ON 21 13 13 Page 7 under gr ound wat er mai n at poi nt - of - ent r y i nt o t he bui l di ng, and el ect r i cal devi ces and i nt er connect i ng wi r i ng. The di mensi on f r om t he edge of ver t i cal pi pi ng t o t he near est adj acent wal l ( s) must be i ndi cat ed on t he dr awi ngs when ver t i cal pi pi ng i s l ocat ed i n st ai r s or ot her por t i ons of t he means of egr ess.

8. Det ai l s of each t ype of pi pe hanger , f or ce pr ot ect i on br aci ng/ r est r ai nt and r el at ed component s.

1. 4. 1. 2 Pr oduct Dat a

Thr ee paper and one di gi t al copy of annot at ed cat al og dat a t o show t he speci f i c model , t ype, and si ze of each i t em. Cat al og cut s must al so i ndi cat e t he NRTL l i s t i ng. The dat a must be hi ghl i ght ed t o show model , s i ze, opt i ons, and ot her per t i nent i nf or mat i on, t hat ar e i nt ended f or consi der at i on. Dat a must be adequat e t o demonst r at e compl i ance wi t h al l cont r act r equi r ement s. Pr oduct dat a f or al l equi pment must be combi ned i nt o a s i ngl e submi t t al and submi t t ed at t he same t i me as t he shop dr awi ngs and cal cul at i ons submi t t al .

1. 4. 1. 3 Hydr aul i c Cal cul at i ons

Cal cul at i ons must be as out l i ned i n NFPA 13 except t hat cal cul at i ons must be per f or med by comput er usi ng sof t war e i nt ended speci f i cal l y f or f i r e pr ot ect i on syst em desi gn usi ng t he desi gn dat a shown on t he dr awi ngs.

Cal cul at i ons must i ncl ude i somet r i c di agr am i ndi cat i ng hydr aul i c nodes and pi pe segment s.

1. 4. 1. 4 Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons

Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA as suppl ement ed and modi f i ed by t hi s speci f i cat i on sect i on.

Pr ovi de si x paper manual s wi t h t abs and bookmar ks cor r espondi ng t o t he t abl e of cont ent s and one pdf ver si on on el ect r oni c medi a. The manual s must i ncl ude t he manuf act ur er ' s name, model number , par t s l i s t , l i s t of par t s and t ool s t hat shoul d be kept i n st ock by t he owner f or r out i ne mai nt enance, t r oubl eshoot i ng gui de, and r ecommended ser vi ce or gani zat i on ( i ncl udi ng addr ess and t el ephone number ) f or each i t em of equi pment .

Submi t spar e par t s dat a f or each di f f er ent i t em of mat er i al and equi pment speci f i ed. The dat a must i ncl ude a compl et e l i s t of par t s and suppl i es, and a l i s t of par t s r ecommended by t he manuf act ur er t o be r epl aced af t er 1- year and 3 year s of ser vi ce. I ncl ude a l i s t of speci al t ool s and t est equi pment r equi r ed f or mai nt enance and t est i ng of t he pr oduct s suppl i ed.

1. 4. 1. 4. 1 Post ed Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons

Pr ovi de Post ed O&M I nst r uct i ons, i n col or wi t h pr of essi onal l y pr epar ed gr aphi cs, 15" x 21" or l ar ger , f r amed i n heavy gauge ext r uded met al f r ames, mount ed under gl ass, wat er / weat her pr oof . Per manent l y mount i n a r eser ved cl ear wal l ar ea as shown on t he shop dr awi ngs, near FACU and/ or spr i nkl er r i ser . I ncl ude compr ehensi ve schemat i cs f or spr i nkl er and f i r e al ar m syst ems, f aci l i t y f l oor pl ans showi ng l ocat i on of al l f i r e equi pment and devi ces wi t h coor di nat ed i dent i f i cat i on. I ncl ude f i r e r at ed wal l s, f i r e damper s, f i r e al ar m r i ser di agr am, I / O mat r i x, poi nt l i s t , and al l component s. I ncl ude val ve char t s, equi pment schedul e and wi r i ng di agr ams and schemat i cs.

SECTI ON 21 13 13 Page 8

1. 4. 2 Qual i f i cat i ons

1. 4. 2. 1 Spr i nkl er Syst em Desi gner

The spr i nkl er syst em desi gner must be cer t i f i ed as a Level I V Techni c i an by Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) i n t he Wat er - Based Syst ems Layout subf i el d of Fi r e Pr ot ect i on Engi neer i ng Technol ogy i n accor dance wi t h NI CET 1014- 7.

1. 4. 2. 2 Spr i nkl er Syst em I nst al l er

The spr i nkl er syst em i nst al l er must be r egul ar l y engaged i n t he i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he cont r act document s, and must have ser ved i n a s i mi l ar capaci t y f or at l east t hr ee syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs.

1. 4. 3 Regul at or y Requi r ement s

Equi pment and mat er i al must be l i s t ed or appr oved. Li st ed or appr oved, as used i n t hi s Sect i on, means l i s t ed, l abel ed or appr oved by a Nat i onal l y Recogni zed Test i ng Labor at or y ( NRTL) such as UL Fi r e Pr ot Di r or FM APP GUI DE. The omi ssi on of t hese t er ms under t he descr i pt i on of an i t em or equi pment descr i bed must not be const r ued as wai v i ng t hi s r equi r ement . Al l l i s t i ngs or appr oval s by t est i ng l abor at or i es must be f r om an exi st i ng ANSI or UL publ i shed st andar d. The r ecommended pr act i ces st at ed i n t he manuf act ur er ' s l i t er at ur e or document at i on ar e mandat or y r equi r ement s.

1. 5 DELI VERY, STORAGE, AND HANDLI NG

Pr ot ect al l equi pment del i ver ed and pl aced i n st or age f r om t he weat her , excessi ve humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s. Al l pi pes must be ei t her capped or pl ugged unt i l i nst al l ed.

1. 6 EXTRA MATERI ALS

Spar e spr i nkl er s and wr ench( es) must be pr ovi ded as spar e par t s i n accor dance wi t h NFPA 13.

PART 2 PRODUCTS

2. 1 MATERI ALS AND EQUI PMENT

2. 1. 1 St andar d Pr oduct s

Pr ovi de mat er i al s, equi pment , and devi ces l i s t ed f or f i r e pr ot ect i on ser vi ce when so r equi r ed by NFPA 13 or t hi s speci f i cat i on. Sel ect mat er i al f r om one manuf act ur er , wher e possi bl e, and not a combi nat i on of manuf act ur er s, f or a c l assi f i cat i on of mat er i al . Mat er i al and equi pment must be st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of t he pr oduct s f or at l east 2 year s pr i or t o bi d.

2. 1. 2 Namepl at es

Maj or component s of equi pment must have t he manuf act ur er ' s name, addr ess, t ype or st y l e, model or ser i al number , cat al og number , dat e of i nst al l at i on, i nst al l i ng Cont r act or ' s name and addr ess, and t he cont r act number pr ovi ded on a new name pl at e per manent l y af f i xed t o t he i t em or

SECTI ON 21 13 13 Page 9 equi pment . Namepl at es must be et ched met al or pl ast i c, per manent l y at t ached by scr ews t o cont r ol uni t s, panel s or adj acent wal l s.

2. 1. 3 I dent i f i cat i on and Mar ki ng

Pi pe and f i t t i ng mar ki ngs must i ncl ude name or i dent i f y i ng symbol of manuf act ur er and nomi nal s i ze. Pi pe must be mar ked wi t h ASTM desi gnat i on. Val ves and equi pment mar ki ngs must have name or i dent i f y i ng symbol of manuf act ur er , speci f i c model number , nomi nal s i ze, name of devi ce, ar r ow i ndi cat i ng di r ect i on of f l ow, and posi t i on of i nst al l at i on ( hor i zont al or ver t i cal ) , except i f val ve can be i nst al l ed i n ei t her posi t i on. Mar ki ngs must be i ncl uded on t he body cast i ng or on an et ched or st amped met al namepl at e per manent l y on t he val ve or cover pl at e.

2. 1. 4 Pr essur e Rat i ngs

Val ves, f i t t i ngs, coupl i ngs, al ar m swi t ches, and si mi l ar devi ces must be r at ed f or t he maxi mum wor ki ng pr essur es t hat can be exper i enced i n t he syst em, but i n no case l ess t han 175 psi .

2. 2 UNDERGROUND PI PI NG COMPONENTS

2. 2. 1 Pi pe

Pi pe must compl y wi t h NFPA 24. Pi pi ng mor e t han 5 f eet out si de t he bui l di ng wal l s must compl y wi t h NFPA 24, UFC 3- 600- 01, Speci f i cat i ons Di v i s i on 33 and t he Ci vi l dr awi ngs. A cont i nuous sect i on of wel ded st ai nl ess st eel f i r e wat er ser vi ce pi pi ng f r om a poi nt out s i de t he bui l di ng per i met er t o a f l anged f i t t i ng at 12 i nches above t he f i ni shed f l oor wi t hi n t he bui l di ng i s r equi r ed.

2. 2. 2 Fi t t i ngs and Gasket s

Fi t t i ngs must be duct i l e- i r on conf or mi ng t o AWWA C110/ A21. 10 wi t h cement mor t ar l i ni ng conf or mi ng t o AWWA C104/ A21. 4. Gasket s must be sui t abl e i n desi gn and si ze f or t he pi pe wi t h whi ch such gasket s ar e t o be used.

Gasket s f or duct i l e- i r on pi pe j oi nt s must conf or m t o AWWA C111/ A21. 11.

2. 2. 3 Gat e Val ve and I ndi cat or Post s

I nst al l at i on must compl y wi t h NFPA 24. Gat e val ves f or use wi t h i ndi cat or post must conf or m t o UL 262. I ndi cat or post s must conf or m t o UL 789 and shal l be pr ovi ded wi t h super vi sor y swi t ches moni t or ed by t he f i r e al ar m syst em. Pr ovi de each i ndi cat or post wi t h one coat of pr i mer and t wo coat s of r ed enamel pai nt .

2. 2. 4 Val ve Boxes

Except wher e i ndi cat or post s ar e pr ovi ded, f or each bur i ed val ve, pr ovi de a cast - i r on, duct i l e- i r on, or pl ast i c val ve box of a sui t abl e s i ze.

Pl ast i c boxes must be const r uct ed of acr yl oni t r i l e- but adi ene- st yr ene ( ABS) or i nor gani c f i ber - r ei nf or ced bl ack pol yol ef i n. Pr ovi de cast - i r on, duct i l e- i r on, or pl ast i c cover f or val ve box wi t h t he wor d " WATER" cast on t he cover . The mi ni mum box shaf t di amet er must be 5. 25 i nches. Coat cast - i r on and duct i l e- i r on boxes wi t h bi t umi nous pai nt appl i ed t o a mi ni mum dr y- f i l m t hi ckness of 10 mi l s.

SECTI ON 21 13 13 Page 10

2. 2. 5 Bur i ed Ut i l i t y War ni ng and I dent i f i cat i on Tape

Pr ovi de det ect abl e al umi num f oi l pl ast i c backed t ape or det ect abl e magnet i c pl ast i c t ape manuf act ur ed speci f i cal l y f or war ni ng and i dent i f i cat i on of bur i ed pi pi ng. Tape must be det ect abl e by an el ect r oni c det ect i on i nst r ument . Pr ovi de t ape, 3 i nches mi ni mum wi dt h, col or coded f or t he ut i l i t y i nvol ved wi t h war ni ng and i dent i f i cat i on i mpr i nt ed i n bol d bl ock l et t er s cont i nuousl y and r epeat edl y over t he ent i r e t ape l engt h.

War ni ng and i dent i f i cat i on must r ead " CAUTI ON BURI ED WATER PI PI NG BELOW" or s i mi l ar wor di ng. Use per manent code and l et t er col or i ng unaf f ect ed by moi st ur e and ot her subst ances cont ai ned i n t r ench backf i l l mat er i al .

2. 3 ABOVEGROUND PI PI NG COMPONENTS

2. 3. 1 St eel Pi pi ng Component s

2. 3. 1. 1 St eel Pi pe

Except as modi f i ed her ei n, pi pe must be bl ack st eel as per mi t t ed by NFPA 13 and conf or m t o t he appl i cabl e pr ovi s i ons of ASTM A53/ A53M, ASTM A135/ A135M or ASTM A153/ A153M.

St eel pi pe must be mi ni mum Schedul e 40.

2. 3. 1. 2 Fi t t i ngs

Fi t t i ngs must be shop wel ded, t hr eaded, or gr ooved- end t ype. Thr eaded f i t t i ngs must be cast - i r on conf or mi ng t o ASME B16. 4, mal l eabl e- i r on conf or mi ng t o ASME B16. 3 or duct i l e- i r on conf or mi ng t o ASTM A536.

Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs, f i t t i ngs t hat use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe, st eel pr ess f i t t i ngs and f i el d wel ded f i t t i ngs ar e not per mi t t ed. Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s must be suppl i ed by t he same manuf act ur er . Thr eaded f i t t i ngs must use Tef l on t ape or manuf act ur er ' s appr oved j oi nt compound.

Saddl e t ees usi ng r ubber gasket ed f i t t i ngs ar e pr ohi bi t ed. Reduci ng coupl i ngs ar e not per mi t t ed.

2. 3. 1. 3 Gr ooved Mechani cal Joi nt s and Fi t t i ngs

Joi nt s and f i t t i ngs must be desi gned f or not l ess t han 175 psi ser vi ce and t he pr oduct of t he same manuf act ur er . Fi el d wel ded f i t t i ngs must not be used. Fi t t i ng and coupl i ng housi ng must be mal l eabl e- i r on conf or mi ng t o ASTM A47/ A47M, Gr ade 32510; duct i l e- i r on conf or mi ng t o ASTM A536, Gr ade 65- 45- 12. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechani cal coupl i ngs ar e per mi t t ed i n pi pe si zes 2 i nches and l ar ger . Gasket must be t he f l ush t ype t hat f i l l s t he ent i r e cavi t y bet ween t he f i t t i ng and t he pi pe. Nut s and bol t s must be heat - t r eat ed st eel conf or mi ng t o ASTM A183 and must be cadmi um- pl at ed or z i nc- el ect r opl at ed.

2. 3. 1. 4 Fl anges

Fl anges must conf or m t o NFPA 13 and ASME B16. 1. Fl ange adapt er s ar e not per mi t t ed. Gasket s must be non- asbest os compr essed mat er i al i n accor dance wi t h ASME B16. 21, 1/ 16- i nch t hi ck, and f ul l f ace or sel f - cent er i ng f l at r i ng t ype.

2. 3. 2 Fl exi bl e Spr i nkl er Hose

Br ai ded f l exi bl e spr i nkl er hose i s not per mi t t ed.

SECTI ON 21 13 13 Page 11

2. 3. 3 Pi pe Hanger s and Suppor t s

Pr ovi de gal vani zed pi pe hanger s and suppor t s i n accor dance wi t h NFPA 13.

2. 3. 4 Val ves

Pr ovi de val ves of t ypes appr oved f or f i r e ser vi ce. Val ves must open by count er cl ockwi se r ot at i on.

2. 3. 4. 1 Cont r ol Val ve

Manual l y oper at ed spr i nkl er cont r ol / gat e val ve must be out si de st em and yoke ( OS&Y) t ype or but t er f l y t ype as i ndi cat ed on t he dr awi ngs and must be l i s t ed.

2. 3. 4. 2 Check Val ves

Check val ves must compl y wi t h UL 312. Check val ves 4 i nches and l ar ger must be of t he swi ng t ype, have a c l ear wat er way and meet t he r equi r ement s of MSS SP- 71, f or Type 3 or 4. I nspect i on pl at e must be pr ovi ded on val ves l ar ger t han 6 i nches.

2. 3. 5 Ri ser Check Val ves

Pr ovi de r i ser check val ve, pr essur e gauges and mai n dr ai n. Pr ovi de pr essur e r el i ef val ve, i nspect or ' s t est , and ot her component s as r equi r ed f or a f ul l y oper at i onal syst em.

2. 4 ALARM I NI TI ATI NG AND SUPERVI SORY DEVI CES

2. 4. 1 Spr i nkl er Al ar m Swi t ch

Vane f l ow swi t ch( es) . Connect i on of swi t ch must be by t he f i r e al ar m i nst al l er . Vane t ype al ar m act uat i ng devi ces must have mechani cal di aphr agm cont r ol l ed r et ar d devi ce adj ust abl e f r om 10 t o 60 seconds and must i nst ant l y r ecycl e. Fl ow swi t ches f or el evat or power shunt must not have a r et ar d f eat ur e.

2. 4. 2 Val ve Super vi sor y ( Tamper ) Swi t ch

Swi t ch must be i nt egr al t o t he cont r ol val ve or sui t abl e f or mount i ng t o t he t ype of cont r ol val ve t o be super vi sed open. The swi t ch must be t amper r esi st ant and cont ai n SPDT ( For m C) cont act s ar r anged t o t r ansf er upon r emoval of t he housi ng cover or c l osur e of t he val ve of mor e t han t wo r ot at i ons of t he val ve st em.

2. 5 BACKFLOW PREVENTI ON ASSEMBLY

Doubl e- check val ve assembl y backf l ow pr event er compl yi ng wi t h ASSE 1013, ASSE 1015 and AWWA M14. Each check val ve must have a dr ai n. Backf l ow pr event i on assembl i es must have cur r ent " Cer t i f i cat e of Appr oval f r om t he Foundat i on f or Cr oss- Connect i on Cont r ol and Hydr aul i c Resear ch, FCCCHR Li st " and be l i s t ed f or f i r e pr ot ect i on use. Li st i ng of t he speci f i c make, model , desi gn, and si ze i n t he FCCCHR Li st i s accept abl e as t he r equi r ed document at i on.

2. 5. 1 Backf l ow Pr event er Test Connect i on

Test connect i on must consi st of a ser i es of l i s t ed hose val ves wi t h 2

SECTI ON 21 13 13 Page 12

1/ 2- i nch Nat i onal St andar d mal e hose t hr eads wi t h cap and chai n.

2. 6 FI RE DEPARTMENT CONNECTI ON

Fi r e depar t ment connect i on must be 2. 5" t ype wi t h al umi num body, mat chi ng wal l escut cheon l et t er ed " Aut o Spkr " . The connect i on must be a 2. 5" wi t h cap and chai n, t ur ned down 30 degr ees.

2. 7 SPRI NKLERS

Spr i nkl er s must compl y wi t h UL 199 and NFPA 13. Spr i nkl er s wi t h i nt er nal O- r i ngs ar e not accept abl e. Spr i nkl er s i n hi gh heat ar eas i ncl udi ng at t i c spaces or i n c l ose pr oxi mi t y t o uni t heat er s must have t emper at ur e c l assi f i cat i on i n accor dance wi t h NFPA 13. Ext ended cover age spr i nkl er s ar e per mi t t ed f or l oadi ng docks, r esi dent i al occupanci es and hi gh- pi l ed st or age appl i cat i ons onl y.

2. 7. 1 Pendent Spr i nkl er

Pendent spr i nkl er must be r ecessed qui ck- r esponse t ype wi t h mi ni mum nomi nal K- f act or of 5. 6, 8. 0, or 11. 2, per UFC 3- 600- 01 Tabl e 9- 3.

Pendent spr i nkl er s must have a pol i shed chr ome f i ni sh. Assembl y must i ncl ude an i nt egr al escut cheon. Pr ovi de r ecessed pendent s wher e cei l i ngs ar e pr ovi ded unl ess conceal ed spr i nkl er s ar e i ndi cat ed.

2. 7. 2 Upr i ght Spr i nkl er

Upr i ght spr i nkl er must be br ass qui ck- r esponse t ype and have a mi ni mum nomi nal K- f act or of 5. 6, 8. 0 or 11. 2, per UFC 3- 600- 01. Sel ect K- f act or per Tabl e 9- 3.

2. 7. 3 Si dewal l Spr i nkl er

Si dewal l spr i nkl er must be t he qui ck- r esponse t ype. Si dewal l spr i nkl er must have a mi ni mum nomi nal K- f act or of 5. 6, 8. 0 or 11. 2, per UFC 3- 600- 01. Sel ect K- f act or per Tabl e 9- 3. Si dewal l spr i nkl er must have a br ass f i ni sh.

2. 7. 4 Conceal ed Spr i nkl er

Conceal ed spr i nkl er must be qui ck- r esponse t ype and have a mi ni mum nomi nal K- f act or of 5. 6 or 8. 0 per UFC 3- 600- 01. Sel ect K- f act or per Tabl e 9- 3.

Cover pl at e must be whi t e unl ess not ed ot her wi se on dr awi ngs.

2. 8 ACCESSORI ES

2. 8. 1 Spr i nkl er Cabi net

Pr ovi de spar e spr i nkl er s i n accor dance wi t h NFPA 13 and must be pl aced i n a sui t abl e met al or pl ast i c cabi net of suf f i c i ent s i ze t o accommodat e al l t he spar e spr i nkl er s and wr enches i n desi gnat ed l ocat i ons. Spar e spr i nkl er s must be r epr esent at i ve of , and i n pr opor t i on t o, t he number of each t ype and t emper at ur e r at i ng of t he spr i nkl er s i nst al l ed as r equi r ed by NFPA 13. At l east one wr ench of each t ype r equi r ed must be pr ovi ded.

2. 8. 2 Pendent Spr i nkl er Escut cheon

Escut cheon must be one- pi ece met al l i c t ype wi t h a dept h of l ess t han 3/ 4- i nch and sui t abl e f or i nst al l at i on on pendent spr i nkl er s. The

SECTI ON 21 13 13 Page 13 escut cheon must have a f act or y f i ni sh t hat mat ches t he pendent spr i nkl er .

2. 8. 3 Pi pe Escut cheon

Pr ovi de spl i t hi nge met al pl at es f or pi pi ng ent er i ng wal l s, f l oor s, and cei l i ngs i n exposed spaces. Pr ovi de pol i shed st ai nl ess st eel pl at es or chr omi um- pl at ed f i ni sh on copper al l oy pl at es i n f i ni shed spaces. Pr ovi de pai nt f i ni sh on met al pl at es i n unf i ni shed spaces.

2. 8. 4 Spr i nkl er Guar d

Li st ed guar d must be a st eel wi r e cage desi gned t o encase t he spr i nkl er and pr ot ect i t f r om mechani cal damage. Guar ds must be pr ovi ded on spr i nkl er s l ocat ed i n r ooms wi t h el ect r i cal or communi cat i on equi pment and on spr i nkl er s wi t hi n 7 f eet of t he f l oor and wher e i ndi cat ed on dr awi ngs or r equi r ed by NFPA 13.

2. 8. 5 Rel i ef Val ve

Rel i ef val ves must be l i s t ed and i nst al l ed at t he r i ser i n accor dance wi t h

NFPA 13.

2. 8. 6 Ai r Vent

Ai r vent s must be of t he aut omat i c t ype and pi ped t o dr ai n t o t he bui l di ng ext er i or .

2. 8. 7 I dent i f i cat i on Si gn

Val ve i dent i f i cat i on s i gn must be mi ni mum 6 i nches wi de by 2 i nches hi gh wi t h enamel baked f i ni sh on mi ni mum 18 gage st eel or 0. 024- i nch al umi num wi t h r ed l et t er s on a whi t e backgr ound or whi t e l et t er s on r ed backgr ound. Wor di ng of s i gn must i ncl ude, but not be l i mi t ed t o " mai n dr ai n" , " auxi l i ar y dr ai n" , " i nspect or ' s t est " , " al ar m t est " , " al ar m l i ne" , and si mi l ar wor di ng as r equi r ed t o i dent i f y oper at i onal component s. Wher e t her e i s mor e t han one spr i nkl er syst em, s i gnage must i ncl ude speci f i c det ai l s as t o t he r espect i ve syst em.

2. 8. 8 Post ed Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons

O&M Manual s shal l be compl et ed, submi t t ed and appr oved no l at er t han 30 days pr i or t o benef i c i al occupancy. Pr ovi de wat er pr oof heavy met al ext r uded f r amed per manent post ed O&M i nst r uct i ons under gl ass t hat ar e coor di nat ed wi t h and keyed t o t he O&M Manual s and t hat ut i l i ze t he syst em and devi ce i dent i f i cat i on and oper at i ons i dent i f i cat i ons. I nst r uct i ons shal l have pr of essi onal l y pr epar ed gr aphi cs, pr i nt ed on f ul l s i zed sheet s, i n col or . Post ed i nst r uct i ons shal l show, at a mi ni mum:

( a) Compr ehensi ve schemat i c pi pi ng di agr ams i ncl udi ng wat er suppl y, and spr i nkl er syst ems.

( b) Faci l i t y f l oor pl ans showi ng l ocat i on of al l f i r e equi pment and devi ces wi t h coor di nat ed i dent i f i cat i on. Show i t ems such as f i r e wal l s, f i r e bar r i er s, f i r e damper s, et c.

( c) Syst em di agr ams, i ncl udi ng i somet r i cs of speci al equi pment such as f i r e r i ser s and al l appur t enances.

( d) Val ve char t s.

( e) Equi pment schedul e.

( f ) Wi r i ng di agr ams and schemat i cs.

SECTI ON 21 13 13 Page 14

PART 3 EXECUTI ON

3. 1 VERI FYI NG ACTUAL FI ELD CONDI TI ONS

Bef or e commenci ng wor k, exami ne al l adj oi ni ng wor k on whi ch t he cont r act or ' s wor k t hat i s dependent f or per f ect wor kmanshi p accor di ng t o t he i nt ent of t hi s speci f i cat i on sect i on, and r epor t t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve a condi t i on t hat pr event s per f or mance of f i r st c l ass wor k. No " wai ver of r esponsi bi l i t y" f or i ncompl et e, i nadequat e or def ect i ve adj oi ni ng wor k wi l l be consi der ed unl ess not i ce has been f i l ed bef or e submi t t al of a pr oposal .

3. 2 I NSTALLATI ON

The i nst al l at i on must be i n accor dance wi t h t he appl i cabl e pr ovi s i ons of NFPA 13, NFPA 24, UFC 3- 600- 01, and publ i cat i ons r ef er enced t her ei n.

Locat e spr i nkl er s i n a consi st ent pat t er n wi t h cei l i ng gr i d, l i ght s, and ai r suppl y di f f user s. I nst al l spr i nkl er syst em over and under duct s, pi pi ng and pl at f or ms when such equi pment can negat i vel y af f ect or di sr upt t he spr i nkl er di schar ge pat t er n and cover age. Do not l ocat e spr i nkl er pi pi ng bel ow f i ni shed cei l i ngs.

a. Pi pi ng of f set s, f i t t i ngs, and ot her accessor i es r equi r ed must be f ur ni shed t o pr ovi de a compl et e i nst al l at i on and t o el i mi nat e i nt er f er ence wi t h ot her const r uct i on.

b. Wher ever t he cont r act or ' s wor k i nt er connect s wi t h wor k of ot her t r ades t he Cont r act or must coor di nat e wi t h ot her Cont r act or s t o ensur e al l Cont r act or s have t he i nf or mat i on necessar y so t hat t hey may pr oper l y i nst al l al l necessar y connect i ons and equi pment . I dent i f y al l wor k i t ems needi ng access ( damper s and si mi l ar equi pment ) t hat ar e conceal ed above hung cei l i ngs by per manent col or coded pi ns/ t abs i n t he cei l i ng di r ect l y bel ow t he i t em.

c. Pr ovi de r equi r ed suppor t s and hanger s f or pi pi ng, condui t , and equi pment so t hat l oadi ng wi l l not exceed al l owabl e l oadi ngs of st r uct ur e. Submi t t al of a bi d must be a deemed r epr esent at i on t hat t he cont r act or submi t t i ng such bi d has ascer t ai ned al l owabl e l oadi ngs and has i ncl uded i n hi s est i mat es t he cost s associ at ed i n f ur ni shi ng r equi r ed suppor t s.

3. 2. 1 Wast e Removal

At t he concl usi on of each day' s wor k, c l ean up and st ockpi l e on si t e al l wast e, debr i s, and t r ash whi ch may have accumul at ed dur i ng t he day as a r esul t of wor k by t he cont r act or and of hi s pr esence on t he j ob.

Si dewal ks and st r eet s adj oi ni ng t he pr oper t y must be kept br oom cl ean and f r ee of wast e, debr i s, t r ash and obst r uct i ons caused by wor k of t he cont r act or , whi ch wi l l af f ect t he condi t i on and saf et y of st r eet s, wal ks, ut i l i t i es, and pr oper t y.

3. 3 UNDERGROUND PI PI NG I NSTALLATI ON

The f i r e pr ot ect i on wat er mai n must be l ai d, and j oi nt s anchor ed, i n accor dance wi t h NFPA 24. Mi ni mum dept h of cover must be 6. 5 f eet or 12" bel ow t he f r ost l i ne, whi chever i s deeper . The suppl y l i ne must t er mi nat e i nsi de t he bui l di ng wi t h a f l anged pi ece, t he bot t om of whi ch must be set at 12" t o 13" above t he f i ni shed f l oor . A bl i nd f l ange must be i nst al l ed t empor ar i l y on t op of t he f l anged pi ece t o pr event t he ent r ance of f or ei gn

SECTI ON 21 13 13 Page 15 mat t er i nt o t he suppl y l i ne. A concr et e t hr ust bl ock must be pr ovi ded at t he el bow wher e t he pi pe t ur ns up t owar d t he f l oor . I n addi t i on, j oi nt s must be anchor ed i n accor dance wi t h NFPA 24. Bur i ed st eel component s must be pr ovi ded wi t h a cor r osi on pr ot ect i ve coat i ng i n accor dance wi t h AWWA C203. Pi pi ng mor e t han 5 f eet out si de t he bui l di ng wal l s see t he Ci vi l dr awi ngs.

3. 4 ABOVEGROUND PI PI NG I NSTALLATI ON

The met hods of f abr i cat i on and i nst al l at i on of t he abovegr ound pi pi ng must f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on.

3. 4. 1 Pr ot ect i on of Pi pi ng Agai nst Ear t hquake Damage

Sei smi c r est r ai nt i s not r equi r ed f or spr i nkl er pi pi ng.

3. 4. 2 Pi pi ng i n Exposed Ar eas

I nst al l exposed pi pi ng wi t hout di mi ni shi ng exi t access wi dt hs, cor r i dor s or equi pment access. Exposed hor i zont al pi pi ng, i ncl udi ng dr ai n pi pi ng, must be i nst al l ed t o pr ovi de maxi mum headr oom.

3. 4. 3 Pi pi ng i n Fi ni shed Ar eas

I n ar eas wi t h suspended or dr opped cei l i ngs and i n ar eas wi t h conceal ed spaces above t he cei l i ng, pi pi ng must be conceal ed above cei l i ngs.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .