This document contains an addendum related to the foundation details for a federal contract opportunity to construct a new Corrosion Control Facility for the Texas Air National Guard at Joint Base San Antonio - Kelly Field Annex.

The solicitation is for a single firm fixed-price construction contract to build a 12,200 square foot facility that includes an environmentally controlled aircraft wash area, hangar space for corrosion treatment and repair, paint preparation and application areas, and administrative spaces. The contract duration is 540 calendar days. This project is set aside 100% for Small Businesses under NAICS code 236220. The solicitation includes a base bid and four optional items related to the building systems and finishes. Brand name items are specified for compatibility with existing installation systems. A site visit and pre-bid conference are scheduled, and all questions must be submitted prior to bid opening. The government will not provide paper copies of the solicitation documents.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Corrosion Control Facility, newest first.
File Type Posted
Corrosion Control Facility - Abstract of Bidders - REVISED - 20240924.pdf PDF
Corrosion Control Facility - Abstract of Bidders 20240918.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 05 - 20240913.pdf PDF
Addendum 3 - S-001-GENERAL NOTES.pdf PDF
Addendum 3 - SB506-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB508-FOUNDATION DETAILS.pdf PDF
Addendum 3 - SB102-SLAB PLAN.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 04 - 20240910.pdf PDF
Addendum 3 - G-203-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-500-DETAILS.pdf PDF
Addendum 3 - A-103-ROOF PLAN.pdf PDF
Addendum 3 - A-101-FLOOR PLAN.pdf PDF
Addendum 03 Cover Page.pdf PDF
Attachment 13 - Kelly Annex CORROSION CONTROL-TOPO.pdf PDF
Addendum 3 - G-002-SHEET INDEX.pdf PDF
Addendum 3 - EG502-GROUNDING AND LIGHTNING PROTECTION DETAILS.pdf PDF
Addendum 3 - A-104-HANGAR BAY FLOOR PAINT STRIPING PLAN.pdf PDF
Addendum 3 - 09 06 00 - SCHEDULES OF FINISHES.pdf PDF
Addendum 3 - 08 34 16.10 - HORIZONTAL ROLLING STEEL DOORS.pdf PDF
Addendum 3 - G-202-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-201-BUILDING ELEVATIONS.pdf PDF
Addendum 3 - 01 14 00 - WORK RESTRICTIONS.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 230 (20240910).pdf PDF
Attachment 12 - JBSA-Soil Management Plan - Signed Jan 22.pdf PDF
Addendum 3 - G-201-SPECIAL INSPECTIONS.pdf PDF
Addendum 3 - A-501-DETAILS.pdf PDF
ADDENDUM 2- SPECIFICATIONS -08 34 16.10 -- DRAWING - A-603.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 03 - 20240905.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 11 (20240829).pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 02 - 20240829.pdf PDF
Attachment 11 - Geotechical report - TX ANG CC Facility.pdf PDF
W50S7824B0002 - Corrosion Control - Amendment 01 - 20240823.pdf PDF
W50S7824B0002 - Corrosion Control - RFI Responses 1 - 5 (20240823).pdf PDF
ADDENDUM 1 - SPECIFICATIONS VOL 1 - SECTION 08 71 00 DOOR HARDWARE.pdf PDF
Pre_Bid_Site Visit_Corrosion Control_Attendance_Sheet 20_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides_Corrosion Control 20 Aug 24.pptx PPTX presentation
Attachment 1 - TX-ANG_CORROSION CONTRAOL HANGAR_TYPE B3_DRAWINGS.pdf PDF
Attachment 1.a. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (1-74) 2024.08.02.pdf PDF
Attachment 10 - Monaco Redacted.pdf PDF
W50S7824B0002 Corrosion Control Facility -Solicitation - 20240809.pdf PDF
Attachment 3 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 2 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 4 - STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 9 - Falcon Redacted.pdf PDF
Attachment 5 - Industrial Security SOW.pdf PDF
Attachment 7 - DDC Redacted.pdf PDF
Attachment 8 - Trane Redacted.pdf PDF
Attachment 1.b. - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_DRAWINGS (75-136) 2024.08.02.pdf PDF
Attachment 2 - TX-ANG_CORROSION CONTROL HANGAR_TYPE B3_VOL 1 SPECIFICATIONS 2024.08.02.pdf PDF
Attachment 6 - Access and staging site plan.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOP OF SLAB

100'-0"

B

1'-0" 1'-0" 12" VOID FORM, TYP

UNDER ALL GRADE

BEAMS AND INTERIOR

SLABS

15 MIL VAPOR

RETARDER UNDER ALL

SLABS

CONCRETE SLAB

(REFER PLAN)

GRADE BEAM

(REFER PLAN)

W/ (6) #8 TOP AND BOT

#4 DOWELS TO

MATCH SLAB

REINF SPACING

SOIL RETAINER

1' -4

1'

-4

#4 TIES TYP

(REFER TYPICAL DETAIL

FOR SPACING)

VA

R

IE

S

VA

R

IE

S

TOP OF SLAB

100'-0"

PIER BEYOND,

TYP

12" VOID FORM, TYP

UNDER ALL GRADE

BEAMS AND INTERIOR

SLABS

15 MIL VAPOR

RETARDER UNDER ALL

SLABS

CONCRETE SLAB

(REFER PLAN)

GRADE BEAM

(REFER PLAN)

W/ (6) #8 TOP

AND BOT

#4 DOWELS TO

MATCH SLAB

REINF SPACING

SOIL RETAINER

1' -4

1'

-4

VA

R

IE

S

3" 1'-6" 3"

VA

R

IE

S

TOP OF SLAB

100'-0"

RIBBED MAT CONC SLAB

(REFER PLAN)

4" 8"

1' -0

1'-4" #4 EXTENDED U BAR TO MATCH

SPACING OF SLAB REINF

18"

10"

TOP OF SLAB

100'-0"

RIBBED MAT CONC SLAB

(REFER PLAN)

4" 8"

1' -0

1'-4"

#4 EXTENDED U BARS TO MATCH

SPACING OF SLAB REINF

18" 18"

10"

2"

5/8" HOLES

FOR CONT #3 REBAR

ANGLE FRAME FOR TRENCH GRATE

1'-11 7/8"

PLAN VIEW

FRONT SECTION VIEW

EN

D

S

EC

TI

O

N V

IE

W

EXTRA HEAVY DUTY AIRPORT TRENCH

GRATE HAVING PROOF LOAD OF 200,000

POUNDS.

" A

T W

ID

EN

ED

T

R

EN

C H

A T

D R

AI

N

8" 8"

2"

2"

TOP OF SLAB

99'-8 3/8"

PROVIDE ADDL #4 BARS

EACH SIDE OF TRENCH

TOP OF FTG

98'-8"

F6

SB507

CONTRACTOR TO COORDINATE

LOCATION OF MELT SNOW

SYSTEM, REF ELECTRICAL

#4 BENT BAR AT 12" OC TYP

EA SIDE OF TRENCH

5"

C

LR3"

2'-0"

1' -0

/8

CONT PL 1/2"x2"

(GALV)

DRILL AND COUNTERSINK FOR

1/2" DIA BOLT (GALV) LOCATION AS SHOWN

IN DETAIL

1/2" CHECKERED PLATE

(GALV)

L3 1/2"x2 1/2"x1/4 (LLH) GALV W/ 1/2" DIA x

4" HEADED STUDS AT 10" OC

1/2" DIA NUT

(GALV)

NOTE: WELD TOGETHER

PRIOR TO GALVANIZING.

2" 1/8"

3/4" 1 3/4"

3/16 2-12

TACK

1/ 2"

4 5/8"

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

20190320

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

TX

AN

G Pr oj ec t N um be r:

KE

LL

JB

SA

Ke lly A nn ex , T X

Te xa s Ai r N at io na l G ua rd 9t h

FW

Co rro sio n Co nt ro l F ac ilit y

NDM

A

B C D

A B C D

E F G H

E F G

H I

I

C :\U sers\nolm stead\D ocum ents\90320_Stru_nolm steadFK74B.rvt 09/09/24 16:50:30

2 AUGUST 2024

SB507

FOUNDATION DETAILS

BJW

CGH

CGH

SCALE: 1" = 1'-0"

SECTIONA2 SCALE: 1" = 1'-0"

SECTIOND2 SCALE: 1" = 1'-0"

SECTIONF2

SCALE: 1" = 1'-0"

SECTIONA4

0 6" 1' 2'

1" = 1'-0"

1 ADDENDUM 03 09/09/2024

SCALE: NTS

TYP TRENCH ANGLE FRAME DETAILG4

SCALE: NTS

TRENCH GRATED5

SCALE: NTS

SECTION AT RAIL TRENCH - TYPA6 SCALE: NTS

RAIL TRENCH DETAILF6

File details come from the government source that posted it. Updated .