This document is an Addendum 3 containing engineering drawings and details for the foundation and hangar door rails of a Corrosion Control Facility for the Texas Air National Guard at Joint Base San Antonio - Kelly Field Annex.
The related federal contract opportunity is for the construction of a new 12,200 square foot Corrosion Control Facility at the same location. The project includes an environmentally controlled aircraft wash area, hangar space for corrosion treatment and paint work, corrosion control shops, and 1,500 square yards of airfield pavement. The contract has a base bid with four options, and specifies brand name equipment for compatibility with existing systems. The project is set aside 100% for small businesses under NAICS code 236220, with an estimated value between $10-25 million and a 540-calendar day period of performance.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3" 3"
2 5/8" 2 5/8"
HANGAR DOOR RAIL BY HANGAR DOOR MANUFACTURER
REFER DETAIL
FOR RAIL SPLICE DETAIL
NOTE:
COORDINATE ALL DIMENSIONS WITH HANGAR DOOR
MANUFACTURER AND EQUIPMENT SUPPLIER
F6 / SB508
MEDIUM BROOM
FINISH
CONCRETE
M
IN1"
9" 1'-6" 9"
3" 3'-0" 3" 1' -0
1' -0 /8
7/8" DIA ANCHOR ROD W/ LEVELING
NUTS (ALIGN AT L5X5) DRILL AND
EPOXY 8" INTO CONCRETE TYP
8"
3'-0"
L5X5X3/8 RAIL SUPPORT
AT 5'-0" OC (MAX SPACING)
COORD W/ RAIL SUPPLIER
FIRST CONCRETE POUR
SECOND CONCRETE POUR
AIR ENTRAINED CONCRETE
FOR THE TOP SLAB
SNOW MELT SYSTEM REFER ELECTRICAL
LOCATION TO COORDINATE
SB508
F6
TO
B E C O N
FI
R M
ED
W / M
AN
U
FA
C
TU
R
ER
1/ 2"
2 1/2" 2 1/2"
HANGAR DOOR
RAIL SPLICE
(MAX)
1/16" GAP
HANGAR DOOR RAIL
BY HANGAR DOOR MANUFACTURER
PROVIDE L5x5x3/8 AT ALL
HANGAR DOOR RAIL SPLICES AND
AT 5'-0" OC MAX SPACING
(ANCHOR BOLTS NOT SHOWN
FOR CLARITY)
NOTE:
SPLICE BAR NOT SHOWN
FOR CLARITY
1/4" 2 1/4" 2
SB508
C4
8" 1'-6" 8"
TYP
3"
TYP
3"
1.
2.
NOTE:
CONTRACTOR COORDINATE SPACING OF RAILS WITH HANGAR DOOR
MANUFACTURER.
REFER PLUMBING AND ELECTRICAL FOR ADDITIONAL INFORMATION.
PROVIDE ADDITIONAL #4 X 2'-6"
EACH SIDE OF TRENCH
GROUND FLOOR
100'-00"
DRAIN PIPE TO TRENCH DRAIN -
REFER PLUMBING
1' -0 /8
5/ 8"
6" 7" 2'-6" 10"
TOP OF FTG
98'-8"
CONTRACTOR TO COORDINATE
LOCATION OF MELT SNOW SYSTEM
REFER ELECTRICAL
TOP OF SLAB
99'-8 3/8"
1' -4
8" 8"
1.
2.
NOTE:
CONTRACTOR COORDINATE SPACING OF RAILS WITH HANGAR DOOR
MANUFACTURER.
REFER PLUMBING AND ELECTRICAL FOR ADDITIONAL INFORMATION.
PROVIDE ADDL #4
EACH SIDE OF TRENCH
DRAIN PIPE TO TRENCH DRAIN -
REFER PLUMBING
1' -0 /8
5/ 8"
TOP OF FTG
98'-8"
CONTRACTOR TO COORDINATE
LOCATION OF MELT SNOW SYSTEM
REFER ELECTRICAL
TYP
3"
TYP
3"
GROUND FLOOR
100'-00"
1' -4
TOP OF SLAB
99'-8 3/8"
1'-4"
7"
1' -6
1' -2 /4
6" 6"
6"
RAIL
RAIL
TRENCH
3" 3"
RAIL TRENCH
TY
P
8" 1' -6
TY
P
8"
TY
P 3"
TY
P
3"SB508
A4
SB508
D6
6"
1' -2 /4
6" 6"
6"
RAIL
TRENCH
RAIL TRENCH
TY
P
8"
TY
P
8"
TY
P 3"
TY
P 3"
3" 3"
SB508
A4
SB508
A6
6"
1' -6
1' -6
1' -2 /4
6" 6"
6"
RAIL
RAIL
TRENCH
3" 3"
RAIL TRENCH
TY
P
2' -2
1' -6
TY
P
8"
TY
P 3"
TY
P
3"SB508
A4
SB508
D6
6" TY
P 3"
TY
P 3"
RAIL
TY
P 3"
TY
P 3"
SIM
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
20190320
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
TX
AN
G Pr oj ec t N um be r:
KE
LL
JB
SA
Ke lly A nn ex , T X
Te xa s Ai r N at io na l G ua rd 9t h
FW
Co rro sio n Co nt ro l F ac ilit y
NDM
A
B C D
A B C D
E F G H
E F G
H I
I
C :\U sers\nolm stead\D ocum ents\90320_Stru_nolm steadFK74B.rvt
09/09/24 16:47:35
2 AUGUST 2024
SB508
FOUNDATION DETAILS
BJW
CGH
CGH
1 ADDENDUM 03 09/09/2024
SCALE: NTS
SECTION AT DOOR GUIDE RAILA4 SCALE: NTS
ELEVATION AT DOOR GUIDE RAIL SPLICEC4
SCALE: NTS
SECTION AT DOOR GUIDE RAIL SPLICEF6SCALE: NTS
SECTION AT RAIL TRENCH - 2D6SCALE: NTS
SECTION AT RAIL TRENCH - 1A6
SCALE: NTS
PLAN DETAIL 2 AT RAIL - DOORE3
SCALE: NTS
PLAN DETAIL 1 AT RAIL - DOORB2
SCALE: NTS
PLAN DETAIL 3 AT RAIL - DOORG3
File details come from the government source that posted it. Updated .