This is a template form for documenting fugitive dust control measures at Dugway Proving Ground (DPG), specifically addressing trackout prevention and cleanup of mud, silt, and soil deposited onto paved roads by vehicles and equipment. The form requires contractors to complete general information fields including location(s), start and end dates, point of contact information, and site description.

The form mandates selection of at least one best management practice (BMP) from designated mitigation categories. Dust prevention options include cleaning trackout at shift end (BMP 17-01 and 17-02), installing gravel pads with minimum specifications of 30 feet wide by 3 inches deep and at least 50 feet long (BMP 17-03), installing and maintaining wheel shakers (BMP 17-04) or wheel washers (BMP 17-05), restricting motorized vehicles to paved surfaces only (BMP 17-06), and installing cattle guards before paved road entrances (BMP 17-07). For routing exiting traffic, contractors must select either clearly establishing traffic patterns over trackout control devices (BMP 17-08) or limiting site accessibility through barriers on unprotected routes (BMP 17-09). The form references compliance with Utah Administrative Code R307-205-6(2) requiring contractors to prevent material deposition on paved roads and promptly clean any fugitive dust materials that are deposited. Completed forms must be submitted to the Environmental Program's Air Program Manager at boyd.roberts.civ@mail.mil upon operation completion or annually by December 31, whichever occurs first.

View the file

Other files

File Type Posted
1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf PDF
TE-05 Materials Manual of Instruction.pdf PDF
TE-08 Work Zones.pdf PDF
TE-09 Dust Control Forms 5 June 2025.pdf PDF
TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf PDF
TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf PDF
TE-09n Fugitive Dust Control Form 14-Trenching.pdf PDF
TE-09o Fugitive Dust Control Form 15-Loading.pdf PDF
TE-09p Fugitive Dust Control Form 16-Paving.pdf PDF
TE-02 Standard Specification Book Rev 9 June 2025.pdf PDF
TE-07 Quality Management Plans 5 June 2025.pdf PDF
TE-09a Fugitive Dust Control Form 01-Crushing.pdf PDF
TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf PDF
TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf PDF
TE-10 Asphalt Slurry Seal.pdf PDF
TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf PDF
Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx PPTX presentation
TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx XLSX spreadsheet
TE-04 Standard Drawings.pdf PDF
TE-09b Fugitive Dust Control Form 02-Screening.pdf PDF
TE-09d Fugitive Dust Control Form 04-Hauling.pdf PDF
TE-09f Fugitive Dust Control Form 06-Backfilling.pdf PDF
TE-09j Fugitive Dust Control Form 10-Demolition.pdf PDF
TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf PDF
TE-09r Fugitive Dust Control Form 18-Traffic.pdf PDF
Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf PDF
DPG_Paved_Roads_2026.pdf PDF
TE-03 Paving IDIQ Airfield Specifications.pdf PDF
TE-06 Min Sampling an Testing.pdf PDF
TE-09i Fugitive Dust Control Form 09-Site Grading.pdf PDF
TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental Programs FDCP-17 Air Quality Program Revision 0

Dugway Proving Ground Fugitive Dust Control Plan Form 17 Roads, Paved and Unpaved

Trackout Prevention and Cleanup of Mud, Silt and Soil Tracked onto Paved Roads Activity Description: The depositing of mud, silt and soil onto paved roads by vehicles or equipment.

General Information

Location(s): Start Date: End Date:

Point of Contact: Email: Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques Select at least one best management practice (BMP) for each critical mitigation area:

Prevent dust from trackout

BMP 17-01 Clean trackout at the end of the work shift from paved surfaces to maintain dust control.

BMP 17-02 Maintain dust control during working hours and clean trackout from paved surfaces at the end of the work shift/day.

BMP 17-03

Install gravel pad(s), clean, well-graded gravel or crushed rock. Minimum dimensions must be 30 feet wide by 3 inches deep, and, at minimum, 50' or the length of the longest haul truck, whichever is greater. Re-screen, wash or apply additional rock in gravel pad to maintain effectiveness.

BMP 17-04 Install wheel shakers. Clean wheel shakers on a regular basis to maintain effectiveness.

BMP 17-05 Install wheel washers. Maintain wheel washers on a regular basis to maintain effectiveness.

BMP 17-06 Motorized vehicles will only operate on paved surfaces.

BMP 17-07 Install cattle guard before paved road entrance.

All exiting traffic must be routed over selected trackout control device(s) BMP 17-08 Clearly establish and enforce traffic patterns to route traffic over select trackout control device(s).

BMP 17-09 Limit site accessibility to routes with trackout control devices in place by installing effective barriers on unprotected routes.

Trackout Prevention In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly.

*By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

Signature Date This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP). Copies of form(s) shall be provided to EP, Air Program Manager, upon the completion of operation(s) and/or annually at the end of each calendar year whichever occurs first. Submit completed form in hardcopy or electronically, via email to Environmental Program’s (EP) Air Program Manager:

boyd.roberts.civ@mail.mil

Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Check Box1: Off
Check Box2: Off
Date:
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off

File details come from the government source that posted it. Updated .