TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf

PDF 763 KB Posted

Attached to
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Solicitation number
W911S6-27-B-A001
Issued by

About this file

This is a Fugitive Dust Control Plan form template used by Dugway Proving Ground for managing air quality during aggregate material storage operations. The form (FDCP-03) applies specifically to stockpiles of soils, rocks, and debris materials stored on-site for future use or export.

The form requires completion of general information including location, dates, point of contact details, and site description. Operators must select at least one best management practice (BMP) from three critical mitigation areas: stabilizing surface soils where equipment operates, stabilizing stockpile materials during handling, and stabilizing stockpiles after handling. BMP options include pre-watering, chemical stabilizers, paving, material removal from downwind sides, height reduction, wind screens, watering to form crusts, covers, and wind barriers. For operations using chemical stabilizers, the specific chemical name must be identified. A logbook is mandatory for all stockpiling activities, documenting minimum information of dates and quantities of materials added or removed, and if suppression methods are used, additional entries must include date, time, suppression type, amount in gallons, purpose, and location applied. The form includes trackout prevention requirements per Utah Administrative Code R307-205-6(2), requiring operators to prevent material deposition on paved roads and promptly clean any contaminated surfaces. Completed forms and logbook entries must be submitted to the Environmental Program's Air Program Manager at boyd.roberts.civ@mail.mil upon operation completion or annually by calendar year-end, whichever occurs first.

View the file

Other files

File Type Posted
TE-02 Standard Specification Book Rev 9 June 2025.pdf PDF
TE-07 Quality Management Plans 5 June 2025.pdf PDF
TE-09a Fugitive Dust Control Form 01-Crushing.pdf PDF
TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf PDF
TE-10 Asphalt Slurry Seal.pdf PDF
TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf PDF
1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf PDF
TE-05 Materials Manual of Instruction.pdf PDF
TE-08 Work Zones.pdf PDF
TE-09 Dust Control Forms 5 June 2025.pdf PDF
TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf PDF
TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf PDF
TE-09n Fugitive Dust Control Form 14-Trenching.pdf PDF
TE-09o Fugitive Dust Control Form 15-Loading.pdf PDF
TE-09p Fugitive Dust Control Form 16-Paving.pdf PDF
TE-09q Fugitive Dust Control Form 17-Trackout.pdf PDF
Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx PPTX presentation
TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx XLSX spreadsheet
TE-04 Standard Drawings.pdf PDF
TE-09b Fugitive Dust Control Form 02-Screening.pdf PDF
TE-09d Fugitive Dust Control Form 04-Hauling.pdf PDF
TE-09f Fugitive Dust Control Form 06-Backfilling.pdf PDF
TE-09j Fugitive Dust Control Form 10-Demolition.pdf PDF
TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf PDF
TE-09r Fugitive Dust Control Form 18-Traffic.pdf PDF
Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf PDF
DPG_Paved_Roads_2026.pdf PDF
TE-03 Paving IDIQ Airfield Specifications.pdf PDF
TE-06 Min Sampling an Testing.pdf PDF
TE-09i Fugitive Dust Control Form 09-Site Grading.pdf PDF
TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental Programs FDCP-03 Air Quality Program Revision 0

Dugway Proving Ground Fugitive Dust Control Plan Form 03 Storage, Hauling and Handling of Aggregate Material

Stockpiles (Storage) of Aggregate Materials for Future Use or Export

Activity Description: A large accumulated pile of materials, soils, rocks, debris that are being stored on site intended for use or awaiting transport to another location.

General Information

Location(s): Start Date: End Date:

Point of Contact: Email: Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques Select at least one best management practice (BMP) for each critical mitigation area:

Stabilize surface soils where support equipment and vehicles will operate

BMP 03-01 Pre-water and maintain surface soils in a stabilized condition.

BMP 03-02 Apply and maintain a chemical stabilizer to surface soils. (Name of chemical: ) BMP 03-03 Pave area(s).

Stabilize stockpile materials during handling

BMP 03-04 Remove material from the downwind side of the stockpile, when safe to do so.

BMP 03-05 Reduce height.

BMP 03-06 Create wind screen.

Stabilize stockpiles after handing

BMP 03-07 Water stockpiles to form a crust immediately.

BMP 03-08 Apply and maintain a chemical stabilizer to all outer surfaces of the stockpiles. (Name of chemical: ) BMP 03-09 Provide and maintain wind barriers on 3 sides of the pile.

BMP 03-10 Apply a cover (natural or synthetic).

BMP 03-11 Wind screen.

BMP 03-12 Avoid steep sides to prevent material sloughing.

BMP 03-13 Reduce height.

Logbook Requirement If aggregate materials are being stockpiled, a logbook is required, at minimum, it must contain: the date and amount(s) of aggregate material added or removed to the pile. If suppression is used, additional logbook entries are required, at minimum, entries must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.

Trackout Prevention In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly.

*By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

Signature Date This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP). Copies of form(s) and corresponding logbook entries (if applicable) shall be provided to EP, Air Program Manager, upon the completion of operation(s) and/or annually at the end of each calendar year whichever occurs first. Submit completed form and applicable logbook entries in hardcopy or electronically, via email to Environmental Program’s (EP) Air Program Manager: boyd.roberts.civ@mail.mil

Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Date:
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off

File details come from the government source that posted it. Updated .