TE-09 Dust Control Forms 5 June 2025.pdf

PDF 623 KB Posted

Attached to
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Solicitation number
W911S6-27-B-A001
Issued by

About this file

This is a technical exhibit document that serves as an index and reference guide for fugitive dust control forms required under the Paving IDIQ Contract for United States Army Garrison Dugway Proving Ground.

The document, prepared by the Directorate of Public Works and dated June 5, 2025, lists 18 Fugitive Dust Control Forms sourced from Part 8 of the Materials Manual (July 2003), Quality Assurance Appendix C. The forms cover dust control requirements across various construction and operational activities: Crushing (Form 01), Screening (Form 02), Stockpiles (Form 03), Hauling (Form 04), Staging Areas (Form 05), Backfilling (Form 06), Site Preparation (Form 07), Clearing (Form 08), Site Grading (Form 09), Demolition (Form 10), Disturbed Soil (Form 11), Disturbed Land (Form 12), Sawing/Cutting (Form 13), Trenching (Form 14), Loading (Form 15), Paving (Form 16), Trackout (Form 17), and Traffic (Form 18). This is a template/reference document that does not address specific contract requirements, pricing, or deliverables but rather provides organizational structure and accessibility to the required dust control forms that contractors must utilize and complete during contract performance.

View the file

Other files

File Type Posted
1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf PDF
TE-05 Materials Manual of Instruction.pdf PDF
TE-08 Work Zones.pdf PDF
TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf PDF
TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf PDF
TE-09n Fugitive Dust Control Form 14-Trenching.pdf PDF
TE-09o Fugitive Dust Control Form 15-Loading.pdf PDF
TE-09p Fugitive Dust Control Form 16-Paving.pdf PDF
TE-09q Fugitive Dust Control Form 17-Trackout.pdf PDF
TE-02 Standard Specification Book Rev 9 June 2025.pdf PDF
TE-07 Quality Management Plans 5 June 2025.pdf PDF
TE-09a Fugitive Dust Control Form 01-Crushing.pdf PDF
TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf PDF
TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf PDF
TE-10 Asphalt Slurry Seal.pdf PDF
TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf PDF
Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx PPTX presentation
TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx XLSX spreadsheet
TE-04 Standard Drawings.pdf PDF
TE-09b Fugitive Dust Control Form 02-Screening.pdf PDF
TE-09d Fugitive Dust Control Form 04-Hauling.pdf PDF
TE-09f Fugitive Dust Control Form 06-Backfilling.pdf PDF
TE-09j Fugitive Dust Control Form 10-Demolition.pdf PDF
TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf PDF
TE-09r Fugitive Dust Control Form 18-Traffic.pdf PDF
Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf PDF
DPG_Paved_Roads_2026.pdf PDF
TE-03 Paving IDIQ Airfield Specifications.pdf PDF
TE-06 Min Sampling an Testing.pdf PDF
TE-09i Fugitive Dust Control Form 09-Site Grading.pdf PDF
TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Army Garrison Dugway Proving Ground

Technical Exhibit 09 Paving IDIQ Contract – Dust Control Forms

Directorate of Public Works 6-5-2025

Part 8 – Materials Manual July 2003

Quality Assurance – Appendix C 1

Fugitive Dust Control Form 01 (Crushing).pdf

Fugitive Dust Control Form 02 (Screening).pdf

Fugitive Dust Control Form 03 (Stockpiles).pdf

Fugitive Dust Control Form 04 (Hauling).pdf

Fugitive Dust Control Form 05 (Staging Areas).pdf

Fugitive Dust Control Form 06 (Backfilling).pdf

Fugitive Dust Control Form 07 (Site Preparation).pdf

Fugitive Dust Control Form 08 (Clearing Forms).pdf

Fugitive Dust Control Form 09 (Site Grading).pdf

Fugitive Dust Control Form 10 (Demolition).pdf

Fugitive Dust Control Form 11 (Disturbed Soil).pdf

Control Form 12 (Disturbed land).pdf

Part 8 – Materials Manual July 2003

Quality Assurance – Appendix C 2

Fugitive Dust Control Form 13 (Sawing-Cutting).pdf

Fugitive Dust Control Form 14 (Trenching).pdf

Fugitive Dust Control Form 15 (Loading).pdf

Fugitive Dust Control Form 16 (Paving).pdf

Fugitive Dust Control Form 17 (Trackout).pdf

Control Form 18 (Traffic).pdf

File details come from the government source that posted it. Updated .