DPG_Paved_Roads_2026.pdf

PDF 682 KB Posted

Attached to
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Solicitation number
W911S6-27-B-A001
Issued by

About this file

This is a geospatial map document depicting the paved road infrastructure at Dugway Proving Ground. The map illustrates the road network across the military installation using WGS 1984 UTM Zone 12N coordinate system and includes a scale in both kilometers and miles. Paved roads are depicted in black lines and total 545,524 feet in length, while unpaved roads are shown in gray and constitute 7,491,370 feet of the road infrastructure. The map was produced by AMIM-DUP-MP GIS using the DPG_Paved_Roads.aprx file and includes a locator map identifying Dugway Proving Ground's position within the broader region. The visualization provides a comprehensive overview of transportation infrastructure distribution across the installation's terrain, which includes mountainous areas and desert landscape typical of the Utah location.

View the file

Other files

File Type Posted
Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf PDF
TE-03 Paving IDIQ Airfield Specifications.pdf PDF
TE-06 Min Sampling an Testing.pdf PDF
TE-09i Fugitive Dust Control Form 09-Site Grading.pdf PDF
TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf PDF
1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf PDF
TE-05 Materials Manual of Instruction.pdf PDF
TE-08 Work Zones.pdf PDF
TE-09 Dust Control Forms 5 June 2025.pdf PDF
TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf PDF
TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf PDF
TE-09n Fugitive Dust Control Form 14-Trenching.pdf PDF
TE-09o Fugitive Dust Control Form 15-Loading.pdf PDF
TE-09p Fugitive Dust Control Form 16-Paving.pdf PDF
TE-09q Fugitive Dust Control Form 17-Trackout.pdf PDF
TE-02 Standard Specification Book Rev 9 June 2025.pdf PDF
TE-07 Quality Management Plans 5 June 2025.pdf PDF
TE-09a Fugitive Dust Control Form 01-Crushing.pdf PDF
TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf PDF
TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf PDF
TE-10 Asphalt Slurry Seal.pdf PDF
TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf PDF
Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx PPTX presentation
TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx XLSX spreadsheet
TE-04 Standard Drawings.pdf PDF
TE-09b Fugitive Dust Control Form 02-Screening.pdf PDF
TE-09d Fugitive Dust Control Form 04-Hauling.pdf PDF
TE-09f Fugitive Dust Control Form 06-Backfilling.pdf PDF
TE-09j Fugitive Dust Control Form 10-Demolition.pdf PDF
TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf PDF
TE-09r Fugitive Dust Control Form 18-Traffic.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 84 Kilometers

0 63 Miles

Coordinate System: WGS 1984 UTM Zone 12N

Dugway Proving Ground Paved Roads

Map produced by AMIM-DUP-MP GIS, DPG_Paved_Roads.aprx

Legend

Is Paved

Yes (545,524 feet)

No (7,491,370 feet)

File details come from the government source that posted it. Updated .