This is a form template for environmental compliance at Dugway Proving Ground (DPG). Specifically, it is the Fugitive Dust Control Plan Form 05, designed to document fugitive dust emission control measures for staging areas where equipment, vehicles, or materials are parked, stored, or assembled during projects involving storage, hauling, and handling of aggregate material.
The form requires project-specific information including location(s), start and end dates, point of contact details, and a site description. Contractors must select at least one best management practice (BMP) from three critical mitigation areas: limiting visible dust opacity from vehicular operations (BMP 05-01 through 05-02), stabilizing staging area soils during use (BMP 05-03 through 05-04), and stabilizing soils at project completion (BMP 05-05 through 05-10). Available practices include vehicle speed/mileage restrictions, water application, chemical stabilizers, screened or washed aggregate, wind breaks, paving, and landscaping. When dust suppression is used, contractors must maintain a logbook documenting date, time, suppression type, amount in gallons, purpose, and application location. The form also establishes trackout prevention requirements per Utah Administrative Code R307-205-6(2), mandating that contractors prevent material deposit on paved roads except at designated sites and promptly clean roads if contamination occurs. Completed forms and applicable logbook entries must be submitted to the Environmental Program's Air Program Manager at boyd.roberts.civ@mail.mil upon operation completion or annually by calendar year-end, whichever occurs first.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental Programs FDCP-05 Air Quality Program Revision 0
Dugway Proving Ground Fugitive Dust Control Plan Form 05 Storage, Hauling and Handling of Aggregate Material
Staging Areas Activity Description: Areas where equipment, vehicles or materials are parked, stored or assembled before use during a project.
General Information
Location(s): Start Date: End Date:
Point of Contact: Email: Phone Number:
Description of site:
Fugitive Dust Emission Control Techniques Select at least one best management practice (BMP) for each critical mitigation area:
Limit visible dust opacity from vehicular operations
BMP 05-01 Limit vehicle mileage and speed.
BMP 05-02 Apply water on all vehicle traffic areas in the staging areas and unpaved access routes.
Stabilize staging areas soils during use
BMP 05-03 Pre-water and maintain surface soils in a stabilized condition.
BMP 05-04 Apply and maintain a chemical stabilizer to surface soils. (Name of chemical: )
Stabilize staging area soils at project completion
BMP 05-05 Apply a chemical stabilizer. (Name of chemical: ) BMP 05-06 Apply screened or washed aggregate.
BMP 05-07 Use wind breaks.
BMP 05-08 Pave.
BMP 05-09 Completed project will cover staging area with buildings, paving and/or landscaping.
BMP 05-10 Apply water to form adequate crust and prevent access.
Logbook Requirement If suppression is used, a logbook is required, at minimum, it must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.
Trackout Prevention In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly.
*By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.
Signature Date This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP). Copies of form(s) and corresponding logbook entries (if applicable) shall be provided to EP, Air Program Manager, upon the completion of operation(s) and/or annually at the end of each calendar year whichever occurs first. Submit completed form and applicable logbook entries in hardcopy or electronically, via email to Environmental Program’s (EP) Air Program Manager: boyd.roberts.civ@mail.mil
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Date: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |