TE-09j Fugitive Dust Control Form 10-Demolition.pdf

PDF 767 KB Posted

Attached to
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Solicitation number
W911S6-27-B-A001
Issued by

About this file

This is a template form for documenting fugitive dust control measures during mechanical demolition activities at Dugway Proving Ground (DPG).

The form requires contractors to complete general information fields including location(s), start and end dates, point of contact information, and site description. For fugitive dust emission control, contractors must select at least one best management practice (BMP) from four critical mitigation areas: (1) stabilize surface soils where support equipment and vehicles will operate, with options including pre-watering, chemical stabilizers, or paving; (2) stabilize demolition debris during handling by applying water; (3) stabilize debris following demolition using water or chemical stabilizers; and (4) stabilize surrounding areas following demolition using water or chemical stabilizers. If any suppression method is used, contractors must maintain a logbook documenting the date, time, type of suppressant, amount in gallons, purpose, and location applied. The form also establishes trackout prevention requirements in accordance with Utah Administrative Code R307-205-6(2), requiring contractors to prevent material from being deposited onto paved roads outside designated deposit sites and to clean roads promptly if deposits occur. Completed forms and corresponding logbook entries must be submitted to the Environmental Program's Air Program Manager at boyd.roberts.civ@mail.mil upon completion of operations or annually at the end of each calendar year, whichever occurs first.

View the file

Other files

File Type Posted
TE-02 Standard Specification Book Rev 9 June 2025.pdf PDF
TE-07 Quality Management Plans 5 June 2025.pdf PDF
TE-09a Fugitive Dust Control Form 01-Crushing.pdf PDF
TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf PDF
TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf PDF
TE-10 Asphalt Slurry Seal.pdf PDF
TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf PDF
1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf PDF
TE-05 Materials Manual of Instruction.pdf PDF
TE-08 Work Zones.pdf PDF
TE-09 Dust Control Forms 5 June 2025.pdf PDF
TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf PDF
TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf PDF
TE-09n Fugitive Dust Control Form 14-Trenching.pdf PDF
TE-09o Fugitive Dust Control Form 15-Loading.pdf PDF
TE-09p Fugitive Dust Control Form 16-Paving.pdf PDF
TE-09q Fugitive Dust Control Form 17-Trackout.pdf PDF
Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx PPTX presentation
TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx XLSX spreadsheet
TE-04 Standard Drawings.pdf PDF
TE-09b Fugitive Dust Control Form 02-Screening.pdf PDF
TE-09d Fugitive Dust Control Form 04-Hauling.pdf PDF
TE-09f Fugitive Dust Control Form 06-Backfilling.pdf PDF
TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf PDF
TE-09r Fugitive Dust Control Form 18-Traffic.pdf PDF
Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf PDF
DPG_Paved_Roads_2026.pdf PDF
TE-03 Paving IDIQ Airfield Specifications.pdf PDF
TE-06 Min Sampling an Testing.pdf PDF
TE-09i Fugitive Dust Control Form 09-Site Grading.pdf PDF
TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental Programs FDCP-10 Air Quality Program Revision 0

Dugway Proving Ground Fugitive Dust Control Plan Form 10 Construction & Demolition Mechanical Demolition

Activity Description: Mechanical/manual destruction and removal of walls, stucco, concrete, freestanding structures, buildings and other structures.

General Information

Location(s): Start Date: End Date:

Point of Contact: Email: Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques Select at least one best management practice (BMP) for each critical mitigation area:

Stabilize surface soils where support equipment and vehicles will operate

BMP 10-01 Pre-water and maintain surface soils in a stabilized conditions.

BMP 10-02 Apply and maintain a chemical stabilizer to surface soils. (Name of chemical: ) BMP 10-03 Pave operational areas.

Stabilize demolition debris during handling

BMP 10-04 Apply water.

Stabilize debris following demolition

BMP 10-05 Apply water.

BMP 10-06 Apply a chemical stabilizer. (Name of chemical: )

Stabilize surrounding area following demolition

BMP 10-07 Apply water.

BMP 10-08 Apply and maintain a chemical stabilizer to stabilize. (Name of chemical: )

Logbook Requirement If suppression is used, a logbook is required, at minimum, it must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.

Trackout Prevention In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly.

*By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

Signature Date This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP). Copies of form(s) and corresponding logbook entries (if applicable) shall be provided to EP, Air Program Manager, upon the completion of operation(s) and/or annually at the end of each calendar year whichever occurs first. Submit completed form and applicable logbook entries in hardcopy or electronically, via email to Environmental Program’s (EP) Air Program Manager: boyd.roberts.civ@mail.mil

Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Text8:
Text9:
Text10:
Date: