TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf

PDF 749 KB Posted

Attached to
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Solicitation number
W911S6-27-B-A001
Issued by

About this file

This is a template form for the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP) for construction and demolition activities involving disturbed soil. The form applies to any activity where soil is broken up, moved, or its physical characteristics are altered.

The form requires contractors to complete general information fields including location(s), start and end dates, point of contact information, and site description. Contractors must select at least one best management practice (BMP) from two critical mitigation areas: (1) limiting disturbance of soils through fencing, barriers, vehicle speed reduction, or similar techniques, and (2) stabilizing disturbed soil through water application, chemical stabilizers, wind breaks, or covers. If suppression methods are used, contractors must maintain a logbook documenting the date, time, suppression type, amount in gallons, purpose, and location applied. In accordance with Utah Administrative Code R307-205-6(2), contractors must prevent material trackout onto paved roads and promptly clean any roads where fugitive dust materials are deposited. The completed form and applicable logbook entries must be submitted to the Environmental Program's Air Program Manager (boyd.roberts.civ@mail.mil) upon operation completion or annually by calendar year end, whichever occurs first.

View the file

Other files

File Type Posted
Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx PPTX presentation
TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx XLSX spreadsheet
TE-04 Standard Drawings.pdf PDF
TE-09b Fugitive Dust Control Form 02-Screening.pdf PDF
TE-09d Fugitive Dust Control Form 04-Hauling.pdf PDF
TE-09f Fugitive Dust Control Form 06-Backfilling.pdf PDF
TE-09j Fugitive Dust Control Form 10-Demolition.pdf PDF
TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf PDF
TE-09r Fugitive Dust Control Form 18-Traffic.pdf PDF
TE-02 Standard Specification Book Rev 9 June 2025.pdf PDF
TE-07 Quality Management Plans 5 June 2025.pdf PDF
TE-09a Fugitive Dust Control Form 01-Crushing.pdf PDF
TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf PDF
TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf PDF
TE-10 Asphalt Slurry Seal.pdf PDF
TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf PDF
1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf PDF
TE-05 Materials Manual of Instruction.pdf PDF
TE-08 Work Zones.pdf PDF
TE-09 Dust Control Forms 5 June 2025.pdf PDF
TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf PDF
TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf PDF
TE-09n Fugitive Dust Control Form 14-Trenching.pdf PDF
TE-09o Fugitive Dust Control Form 15-Loading.pdf PDF
TE-09p Fugitive Dust Control Form 16-Paving.pdf PDF
TE-09q Fugitive Dust Control Form 17-Trackout.pdf PDF
Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf PDF
DPG_Paved_Roads_2026.pdf PDF
TE-03 Paving IDIQ Airfield Specifications.pdf PDF
TE-06 Min Sampling an Testing.pdf PDF
TE-09i Fugitive Dust Control Form 09-Site Grading.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental Programs FDCP-11 Air Quality Program Revision 0

Dugway Proving Ground Fugitive Dust Control Plan Form 11 Construction & Demolition

Disturbed Soil Activity Description: Whenever soil is broken up, moved, or physical characteristics are altered.

General Information

Location(s): Start Date: End Date:

Point of Contact: Email: Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques Select at least one best management practice (BMP) for each critical mitigation area:

Limit disturbance of soils where possible

BMP 11-01 Limit disturbance of soils with the use of fencing, barriers, barricades, and/or wind barriers.

BMP 11-02 Limit vehicle mileage and reduce speed.

Stabilize and maintain stability of all disturbed soil throughout construction site generating fugitive dust.BMP 11-03 Apply water to stabilize disturbed soils. Soil moisture must be maintained such that soils can be worked without

BMP 11-04 Apply and maintain a chemical stabilizer. (Name of chemical: ) BMP 11-05 Use wind breaks.

BMP 11-06 Apply cover. (natural or synthetic)

Logbook Requirement If suppression is used, a logbook is required, at minimum, it must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.

Trackout Prevention In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly.

*By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

Signature Date This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP). Copies of form(s) and corresponding logbook entries (if applicable) shall be provided to EP, Air Program Manager, upon the completion of operation(s) and/or annually at the end of each calendar year whichever occurs first. Submit completed form and applicable logbook entries in hardcopy or electronically, via email to Environmental Program’s (EP) Air Program Manager: boyd.roberts.civ@mail.mil

Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Check Box1: Off
Check Box2: Off
Text8:
Date:
Check Box6: Off
Check Box5: Off
Check Box4: Off
Check Box3: Off

File details come from the government source that posted it. Updated .