TE-20 - UFGS 09 01 90.50 - PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING - 2009.PDF

PDF 44 KB Posted

Attached to
Solicitation for Protective Coatings
Solicitation number
W911S825BA015
Issued by

About this file

This document is a Unified Facilities Guide Specification (UFGS) for the preparation of historic wood and metal surfaces for painting, specifically detailing technical requirements for surface preparation, cleaning, and restoration of historic structures. The specification provides comprehensive guidelines for workers and contractors, covering critical aspects such as worker safety, material handling, surface preparation techniques, and specific treatment methods for different materials including wood, ferrous metals, and nonferrous metallic surfaces.

Key technical requirements include using the gentlest possible preparation methods to avoid damaging historic substrates, proper ventilation during work, chemical paint removal procedures, surface cleaning protocols, and specialized repair techniques like epoxy consolidation for deteriorated wood. The document mandates strict quality assurance measures, including worker training, exposure limit compliance, and detailed documentation of surface preparation processes. Specific cleaning and treatment standards are outlined for various surface types, with emphasis on preserving the integrity of historic materials while preparing them for painting.

View the file

Other files

File Type Posted
TE-01 Price List (Revision 2 Revised 2025-07-11).xlsx XLSX spreadsheet
Solicitation Amendment 03 W911S825BA0150003 SF 30.pdf PDF
Solicitation Questions and Answers (Revised Amendment 3).pdf PDF
TE-18 - UFGS 04 03 00 - Conservation for Period Masonry - 2017.pdf PDF
TE-19 - UFGS 07 92 00 - Joint Sealants - 2023.pdf PDF
TE-23 - UFGS 09 90 00 - Paintings and Coatings - 2021.pdf PDF
Solicitation Amendment 02 W911S825BA0150002 SF 30.pdf PDF
TE-22 - UFGS 09 67 23.13 - Standard Resinous Flooring - 2019.pdf PDF
TE-17 - UFGS 02 83 00 - Lead Remediation - 2018.pdf PDF
TE-24 - UFGS 09 97 13.00 40 - Steel Coatings - 2014 (1).pdf PDF
TE-15 - UFC 3 190 06 - Protective Coatings and Paints - 2021.pdf PDF
TE-21 - UFGS 09 65 00 - Resilient Flooring - 2010.pdf PDF
TE-16 - UFGS 02 82 00 - Asbestos Remediation - 2019.pdf PDF
Solicitation Amendment W911S825BA0150001 SF 30.pdf PDF
Solicitation Questions and Answers.pdf PDF
Attachment A Task Order SOW Example.docx DOCX document
Attachment B Task Order Proposal Tech Review.xlsx XLSX spreadsheet
TE-10 General Decision Number WA20250108 (King) 06 JUNE 2025.docx DOCX document
TE-14 General Decision Number WA20250119 (Yakima) 06 June 2025.docx DOCX document
TE-07 Sustainable Acquisition Exception Form.pdf PDF
TE-09 HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
TE-04 Project Schedule Example.xlsx XLSX spreadsheet
TE-11 General Decision Number - WA20250111 (Pierce) 06 June 2025.docx DOCX document
TE-03 Contract Progress Report.pdf PDF
TE-1 Base Year Price List (Revised).xlsx XLSX spreadsheet
TE-05 Eng Form 4025-R.pdf PDF
Solicitation - W911S825BA015.pdf PDF
TE-2 Statement of Work (2025-06-06).pdf PDF
TE-06 Daily Contract Inspection Report.pdf PDF
TE-12 General Decision Number - WA20250116 (Thurston) 06 June 2025.docx DOCX document
TE-13 General Decision Number - WA20250029 (Jefferson) 06 June 2025.docx DOCX document
TE-08 Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC / NASA UFGS- 09 01 90. 50 ( May 2009) Change 1 - 08/ 17 Pr epar i ng Act i v i t y: USACE Nont echni cal Ti t l e Revi s i on ( August 2015)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2019

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 01 90.50

PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING

05/09

PART 1 GENERAL

1.1 REFERENCES

1.2 SUMMARY

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.4.1 Worker Exposures

1.4.2 Training

1.4.3 Coordination

1.4.4 Qualifications

1.5 DELIVERY, STORAGE, AND HANDLING

1.6 ENVIRONMENTAL REQUIREMENTS

PART 2 PRODUCTS

2.1 PAINT REMOVERS

2.2 EPOXY CONSOLIDANTS

2.2.1 Liquid Consolidant

2.2.2 Epoxy Paste

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.2 VENTILATION

3.3 PROTECTION OF AREAS NOT TO BE PAINTED

3.4 CLEANING OF SURFACES

3.5 EXISTING PAINT

3.6 PAINT REMOVAL

3.6.1 Chemical Paint Removers

3.6.2 Lead Paint

3.7 SURFACE PREPARATION

3.8 WOOD SURFACES

3.8.1 Interior Wood Surfaces

3.8.2 Wood Repair

3.8.2.1 Epoxy Wood Repair

SECTION 09 01 90.50 Page 1

3.8.2.2 Epoxy Consolidant and Epoxy Paste

3.8.3 Exposed Ferrous Metals

3.8.4 Finishing Nails

3.8.5 Wood Preservative

3.9 METAL SURFACES

3.9.1 Ferrous Surfaces

3.9.2 Nonferrous Metallic Surfaces

3.9.2.1 Aluminum

3.9.2.2 Zinc

3.10 TIMING

3.11 SURFACES TO BE PREPARED FOR PAINTING

3.12 CLEANING

-- End of Section Table of Contents --

SECTION 09 01 90.50 Page 2

USACE / NAVFAC / AFCEC / NASA UFGS- 09 01 90. 50 ( May 2009) Change 1 - 08/ 17 Pr epar i ng Act i v i t y: USACE Nont echni cal Ti t l e Revi s i on ( August 2015)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2019

SECTION 09 01 90.50

PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING

05/09

NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or pr epar at i on f or pai nt i ng wood and met al sur f aces i n hi st or i c st r uct ur es.

Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .

PART 1 GENERAL

1.1 REFERENCES

NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out si de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e

SECTION 09 01 90.50 Page 3 t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)

ACGIH 0100 (2015; Suppl 2002-2016) Documentation of the Threshold Limit Values and Biological Exposure Indices

ASTM INTERNATIONAL (ASTM)

ASTM D173/D173M (2003; R 2011; E 2012) Bitumen-Saturated Cotton Fabrics Used in Roofing and Waterproofing

ASTM D3274 (2009; R 2017) Standard Test Method for Evaluating Degree of Surface Disfigurement of Paint Films by Fungal or Algal Growth, or Soil and Dirt Accumulation

ASTM D3359 (2017) Standard Test Methods for Rating Adhesion by Tape Test

ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning

SSPC PA Guide 5 (2002; E 2004) Guide to Maintenance Coating of Steel Structures in Atmospheric Service

SSPC SP 1 (2015) Solvent Cleaning

SSPC SP 2 (1982; E 2000; E 2004) Hand Tool Cleaning

SSPC SP 3 (1982; E 2004) Power Tool Cleaning

SSPC SP 5/NACE No. 1 (2007) White Metal Blast Cleaning

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning

1.2 SUMMARY

SECTION 09 01 90.50 Page 4

NOTE: The Feder al Cl ean Ai r Act r equi r es each st at e t o meet t he Nat i onal Ambi ent Ai r Qual i t y St andar ds.

I n addi t i on, each st at e or l ocal gover nment may i mpose mor e r est r i ct i ve r equi r ement s. St at es wi t h ar eas i dent i f i ed as exceedi ng EPA st andar ds f or ozone must adopt l i mi t s on t he vol at i l e or gani c compound ( VOC) cont ent of pai nt r emover s, wood pr eser vat i ves, sol vent s and ot her chemi cal pr epar at i on mat er i al s. Ther ef or e, t he desi gner shoul d det er mi ne t he l ocal r est r i ct i ons and el i mi nat e pr ohi bi t ed mat er i al s. I t may be necessar y t o speci f y l ocal l y avai l abl e commer ci al pr oduct s whi ch have been devel oped t o meet l ocal r est r i ct i ons.

The r equi r ement s f or Cont r act or t est r epor t r esponsi bi l i t i es shoul d be modi f i ed r egar di ng exempt materials.

The procedures proposed for the accomplishment of the work shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, and coordination with other work in progress. Submit the names, quantity represented, and intended use for proprietary brands of materials proposed to be substituted for the specified materials when the required quantity of a particular batch is 200 liters 50 gallons or less.

Submit manufacturer's current printed product description, safety data sheets (SDS) and technical data sheets for each product. Detailed mixing, thinning and application instructions, minimum and maximum application temperature, and curing and drying times shall be provided for each product submitted. Include in the work plan a Safety and Health plan describing procedures for handling monitoring, and disposition of VOCs and other hazardous and toxic materials. Submit [one copy] [[_____] copies] of the Work Plan and a certificate stating that products proposed for use meet the VOC regulations of the local Air Pollution Control Districts having jurisdiction over the geographical area in which the project is located. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations. Test the materials designated by the Contracting Officer.

1.3 SUBMITTALS

NOTE: Revi ew submi t t al descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .

The Gui de Speci f i cat i on t echni cal edi t or s have desi gnat ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a “ G” t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For submi t t al s r equi r i ng Gover nment appr oval on Ar my pr oj ect s, a code of up t o t hr ee char act er s wi t hi n

SECTION 09 01 90.50 Page 5 t he submi t t al t ags may be used f ol l owi ng t he " G" desi gnat i on t o i ndi cat e t he appr ovi ng aut hor i t y.

Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

The " S" f ol l owi ng a submi t t al i t em i ndi cat es t hat t he submi t t al i s r equi r ed f or t he Sust ai nabi l i t y eNot ebook t o f ul f i l l f eder al l y mandat ed sust ai nabl e r equi r ement s i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Locat e t he " S" submi t t al under t he SD number t hat best descr i bes t he submi t t al i t em.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for [Contractor Quality Control approval.] [information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Work Plan ; G[, [_____]] Materials Qualifications

SD-07 Certificates

Work Plan

1.4 QUALITY ASSURANCE

Work shall comply with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in the CONTRACT CLAUSES. The Activity Hazard Analysis shall include analyses of the potential impact of surface preparation operations on personnel and on others involved in and adjacent to the work zone.

1.4.1 Worker Exposures

Exposure of workers to chemical substances shall not exceed limits as established by ACGIH 0100 .

1.4.2 Training

Inform workers, having access to an affected work area, of the contents of

SECTION 09 01 90.50 Page 6 the applicable SDS and of potential health and safety hazard and protective controls associated with materials used on the project. An affected work area is one which may receive dust, mists, and odors from the surface preparation operations. Workers involved in surface preparation and clean-up must be trained in the safe handling and application, and the exposure limit, for each material which the worker will use in the project. Instruct personnel having a need to use respirators and masks in the use and maintenance of such equipment.

1.4.3 Coordination

Coordinate work to minimize exposure of building occupants, other Contractor personnel, and visitors to mists and odors from surface preparation and cleaning operations.

1.4.4 Qualifications

Provide qualified workers trained and experienced in the preparation for painting of wood and metal surfaces in historic structures, submit documentation of 5 consecutive years of work of this type and a statement certified by the Contractor attesting that the experience and qualifications of the workers (journeymen) comply with the specifications.. Provide a list of similar jobs identifying when, where, and for whom the work was done and a current point-of-contact for identified references.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver paint removers, solvents, and other chemicals, used for surface preparation, in sealed containers that legibly show the designated name, formula or specification number, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name of manufacturer. Furnish such materials in containers not larger than 20 L 5 gallons ; store them in accordance with the manufacturer's written directions; and, as a minimum, store them off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors and at temperatures between 4 and 35 degrees C 40 and 95 degrees F .

1.6 ENVIRONMENTAL REQUIREMENTS

Unless otherwise recommended by the product manufacturer, the ambient temperature shall be between 7 and 35 degrees C 45 and 95 degrees F when applying paint removers, solvents, or other preparation materials.

PART 2 PRODUCTS

NOTE: When t he r equi r ed quant i t y of a par t i cul ar mat er i al i s 200 l i t er s 50 gal l ons or l ess, t he f act or s of t i me, val ue of mat er i al ver sus cost of t est i ng, and t he end use of mat er i al may j ust i f y accept ance on t he basi s of manuf act ur er ' s dat a.

2.1 PAINT REMOVERS

Chemical paint removers shall be a commercial item specifically manufactured for the type of paint to be removed.

SECTION 09 01 90.50 Page 7

2.2 EPOXY CONSOLIDANTS

2.2.1 Liquid Consolidant

Provide liquid wood consolidant consisting of a 2-part, low-viscosity liquid epoxy that meets the criteria of Table 1.

2.2.2 Epoxy Paste

Provide epoxy paste consisting of a 2-part, thixotropic paste that meets the criteria of Table 1.

TABLE 1

LIQUID CONSOLIDANT EPOXY PASTE

Properties Low-Viscosity Liquid No-Slump, Thixotropic Paste

Toxicity Low Very Low

Toxicity Cured Non-Toxic Non-Toxic

Ratios 1:1 by Volume 1:1 by Volume

Pot Life @ Room Temp. 30 minutes min. 50 minutes min

Hardening @ Room Temp. 1 hr. or longer 1 hr. or longer

Hardening @ 60 deg. C 140 deg. F

16 min. or less 18 min. or less

Viscosity Poises @ 22 deg. C 72 deg. F

4.7 max. Thixotropic paste

Solids 95 percent min. 98 percent min.

Tensile Strength 27.6 MPa 4000 psi 17.25 MPa 2500 psi

Elongation 50 percent 4 percent

Compressive Strength

Failure 131 MPA19,000 psi ---

Yield 24 MPa 3500 psi 38 MPa 5500 psi

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Use methods for preparation of historic wood and metal surfaces for painting which are the gentlest possible to achieve the desired results.

Historic substrate materials shall not be damaged or marred in the process of surface preparations. Collect and analyze samples of the existing paint finishes for the purpose of documentation or matching, if [so directed by the Contracting Officer] [required by the contract documents.] Material and application requirements for paints are covered

SECTION 09 01 90.50 Page 8 in Section 09 90 00 PAINTS AND COATINGS.

3.2 VENTILATION

Ventilate interior work zones, having a volume of 280 cubic meters 10,000 cubic feet or less, at a minimum of 2 air exchanges per hour. Maintain ventilation in larger work zones by means of mechanical exhaust. Solvent vapors shall be exhausted outdoors, away from air intakes and workers.

Temporarily seal return air inlets in the work zone before start of work until the prepared surfaces have dried. Operators and personnel in the vicinity of paint removal processes involving chemicals or mechanical action (sanding or blasting) shall wear respirators.

3.3 PROTECTION OF AREAS NOT TO BE PAINTED

Remove or protect items not to be painted, which are in contact with or adjacent to painted surfaces, prior to surface preparation and painting operations. Replace items removed prior to painting when painting is completed. Following completion of painting, workers skilled in the trades involved shall reinstall removed items. Surfaces contaminated by preparation materials shall be restored to original condition.

3.4 CLEANING OF SURFACES

Surfaces to be painted shall be clean and free of grease, dirt, dust and other foreign matter before application of paint or surface treatments.

After cleaning, surfaces shall exhibit a surface disfigurement rating of 7 or greater when evaluated in accordance with ASTM D3274. Dirt and surface contaminants shall be cleaned by brush with solutions of water and detergent or trisodium phosphate, then rinsed clean with water and let dry. Surfaces on which mildew or other microbiological growth is present shall be cleaned with a detergent solution containing household bleach.

Oil and grease shall be removed with clean cloths and cleaning solvents prior to mechanical cleaning. Cleaning solvents shall be of low toxicity with a flashpoint in excess of 38 degrees C 100 degrees F . Cleaning shall be programmed so that dust and other contaminants will not fall on newly prepared or newly painted surfaces.

3.5 EXISTING PAINT

Existing paint shall be tested for adhesion to substrate in accordance with ASTM D3359, Test Method A and shall obtain a rating of 4 or better in order to be considered sound. Existing paint meeting this requirement may be considered a satisfactory base for repainting.

3.6 PAINT REMOVAL

Remove flaking, cracking, blistering, peeling or otherwise deteriorated paint by scraping with hand scrapers. After scraping, removal of large areas of paint or paint on architectural details shall be accomplished using sanders, heat guns or heat plates, or chemical paint removers.

Paint shall be removed to bare substrate or first sound paint layer. Open flame heat devices shall not be used. Mechanical paint removal shall not damage or mar the substrate material.

3.6.1 Chemical Paint Removers

Use chemical paint removers in accordance with manufacturer's recommendations. If chemical strippers are used, substrate shall be

SECTION 09 01 90.50 Page 9 neutralized after stripping to a pH of 5 to 8.5.

3.6.2 Lead Paint

In preparation of lead-based painted surfaces for repainting, follow the procedures described in Section 02 83 00 LEAD REMEDIATION.

3.7 SURFACE PREPARATION

After cleaning and removal of deteriorated paint, edges of remaining chipped paint shall be feather-edged and sanded smooth. Repair damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls with suitable material to match adjacent undamaged areas. Slick surfaces shall be roughened. Clean rusty metal surfaces in accordance with [ SSPC SP 1 ] [ SSPC SP 2 ] [ SSPC SP 3 ] [ SSPC SP 5/NACE No. 1 ] [ SSPC SP 6/NACE No.3 ] [ SSPC 7/NACE No.4 ] [ SSPC SP 10/NACE No. 2 ]. Remove chalk so that when tested in accordance with ASTM D4214, the chalk resistance rating is no less than 8. New, proposed coatings shall be compatible with existing coatings. If existing surfaces are glossy, the gloss shall be reduced.

3.8 WOOD SURFACES

Wood surfaces shall be cleaned of foreign matter. Wood surfaces adjacent to surfaces to receive water-thinned paints shall be primed and/or touched up before applying water-thinned paints. Small, dry seasoned knots shall be scraped, cleaned, and given a thin coat of commercial knot sealer before application of the priming coat. Pitch on large, open, unseasoned knots and all other beads or streaks of pitch shall be scraped off, or, if it is still soft, removed with mineral spirits or turpentine, and the resinous area shall be thinly coated with knot sealer.

3.8.1 Interior Wood Surfaces

Interior wood surfaces to receive stain shall be sanded. Oak and other open-grain wood to receive stain shall be given a coat of wood filler recommended by the finish manufacturer not less than 8 hours before the application of stain; excess filler shall be removed and the surface sanded smooth. Sanding of wood floors is specified in Section 09 64 29 WOOD STRIP AND PLANK FLOORING. Moisture content of the wood shall not exceed 12 percent as measured by a moisture meter, unless otherwise authorized.

3.8.2 Wood Repair

Remove and repair badly decayed areas. Replace areas and pieces decayed beyond repair with new pieces that match originals in all respects.

Moderately decayed areas, weathered, or gouged wood shall be patched with approved patching compounds, and shall be sanded smooth. The source or cause of wood decay shall be identified and corrected prior to application of patching materials. Wet wood shall be completely dried to a moisture content not exceeding 12 percent, as measured by a moisture meter, to its full depth before patching, unless otherwise authorized. Wood that is to be patched shall be clean of dust, grease, and loose paint.

3.8.2.1 Epoxy Wood Repair

Epoxy wood repair materials shall be applied in accordance with manufacturer's written instructions. Health and safety instructions shall

SECTION 09 01 90.50 Page 10 be followed in accordance with the manufacturer's instructions. Clean mixing equipment shall be used to avoid contamination. Mix and proportions shall be as directed by the manufacturer. Batches shall be only large enough to complete the specific job intended. Patching materials shall be completely cured before painting or reinstallation of patched pieces.

3.8.2.2 Epoxy Consolidant and Epoxy Paste

Epoxy liquid wood consolidant shall be used: 1) to penetrate and impregnate deteriorated wood sections in order to reinforce wood fibers that have become softened or absorbent. 2) as a primer for areas that are to receive epoxy paste filler. Epoxy paste shall be used to fill areas where portions of wood are missing such as holes, cracks, gaps, gouges, and other voids.

3.8.3 Exposed Ferrous Metals

Exposed ferrous metals such as nail heads on or in contact with wood surfaces to be painted with water-thinned paints, shall be spot-primed with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.

3.8.4 Finishing Nails

Finishing nails shall be set, and all holes and surface imperfections shall be primed. After priming, holes and imperfections in finish surfaces shall be filled with putty or plastic wood filler, colored to match the finish coat if natural finish is required, allowed to dry, and sanded smooth. Putty or wood filler shall be compatible with subsequent coatings.

3.8.5 Wood Preservative

Areas of bare wood in exterior locations prone to excessive moisture or standing water shall be treated with a commercial, fungicide, paintable water repellant/preservative. Water repellant/preservatives shall not be used on interior surfaces.

3.9 METAL SURFACES

Metal surfaces shall be cleaned of foreign matter. Programs for preparation of metal shall be in accordance with SSPC PA Guide 5 . Grease, oil, and other soluble contaminants shall be removed by solvent cleaning in accordance with SSPC SP 1 . Surfaces shall be free from soils and corrosion; e.g. grease, oil, solder flux, welding flux, weld spatter, sand, rust, scale, and other contaminants that might interfere with the application of the new finish. Cleaning methods shall be the gentlest possible to achieve the desired result. Metals which are soft, thin, or exhibit fine detail shall not be abrasively cleaned. Evidence of corrosion or contamination on a previously cleaned surface shall be cause for recleaning prior to painting.

3.9.1 Ferrous Surfaces

Ferrous surfaces that contain loose rust, loose mill scale, and other foreign substances shall be cleaned mechanically with hand tools according to SSPC SP 2 , power tools according to SSPC SP 3 or by blast cleaning according to [ SSPC SP 5/NACE No. 1 ], [ SSPC SP 6/NACE No.3 ], [

SECTION 09 01 90.50 Page 11

SSPC 7/NACE No.4 ], [ SSPC SP 10/NACE No. 2 ]. Shop-coated ferrous surfaces shall be protected from corrosion by treating and touching up corroded areas immediately upon detection.

3.9.2 Nonferrous Metallic Surfaces

Galvanized, aluminum and aluminum-alloy, lead, copper, and other nonferrous metal surfaces shall be solvent-cleaned in accordance with

SSPC SP 1 .

3.9.2.1 Aluminum

Aluminum surfaces shall be treated in accordance with ASTM D173/D173M or ASTM D173/D173M. Steel wool, steel brushes and uninhibited caustic etching solutions, such as sodium hydroxide, shall not be used on aluminum.

3.9.2.2 Zinc

Zinc surfaces including zinc-coated substrates, shall be cleaned prior to painting as follows: degrease, soak in a mild and inhibited alkaline cleaner, rinse with clean overflowing water, clean anodically in an acid (e.g. 0.25 to 0.75 percent sulfuric acid), and rinse with clean overflowing water.

3.10 TIMING

Surfaces that have been cleaned, pretreated, and otherwise prepared for painting shall be given a coat of the specified first coat as soon as practical after such pretreatment has been completed, but prior to any deterioration of the prepared surface. Unless otherwise directed, the first coat primer shall be applied within 48 hours of surface preparation.

3.11 SURFACES TO BE PREPARED FOR PAINTING

Surfaces shall be prepared as specified and as shown in the painting schedule [in Section 09 90 00 PAINTS AND COATINGS] [on the drawings].

3.12 CLEANING

Place cloths, cotton waste and other debris, that might constitute a fire hazard, in closed metal containers for removal at the end of each day.

Containers shall be removed from the site or destroyed in an approved manner. Preparation materials and other deposits on adjacent surfaces shall be removed and the entire job left clean and ready for painting.

-- End of Section --

SECTION 09 01 90.50 Page 12