TE-17 - UFGS 02 83 00 - Lead Remediation - 2018.pdf

PDF 144 KB Posted

Attached to
Solicitation for Protective Coatings
Solicitation number
W911S825BA015
Issued by

About this file

This document is a Unified Facilities Guide Specification (UFGS) for Lead Remediation (Section 02 83 00), dated November 2018, providing comprehensive technical guidelines for lead, cadmium, and chromium hazard abatement and removal. The specification covers detailed requirements for worker protection, waste disposal, sampling and analysis, and control procedures for lead-based paint and materials containing lead in target housing and child-occupied facilities.

Key technical requirements include establishing lead control areas, implementing strict personnel protection protocols, using specialized equipment like HEPA-filtered vacuums and negative air pressure systems, conducting air and wipe sampling, and following specific disposal and decontamination procedures. The document outlines mandatory qualifications for personnel, including Competent Person (CP) certification, medical examinations, respiratory protection, and training requirements. Contractors must develop detailed compliance plans, manage waste according to federal regulations, and ensure thorough cleaning and clearance testing to minimize environmental and occupational exposure to lead and related hazardous materials.

View the file

Other files

File Type Posted
TE-01 Price List (Revision 2 Revised 2025-07-11).xlsx XLSX spreadsheet
Solicitation Amendment 03 W911S825BA0150003 SF 30.pdf PDF
Solicitation Questions and Answers (Revised Amendment 3).pdf PDF
TE-18 - UFGS 04 03 00 - Conservation for Period Masonry - 2017.pdf PDF
TE-19 - UFGS 07 92 00 - Joint Sealants - 2023.pdf PDF
TE-23 - UFGS 09 90 00 - Paintings and Coatings - 2021.pdf PDF
Solicitation Amendment 02 W911S825BA0150002 SF 30.pdf PDF
TE-22 - UFGS 09 67 23.13 - Standard Resinous Flooring - 2019.pdf PDF
TE-24 - UFGS 09 97 13.00 40 - Steel Coatings - 2014 (1).pdf PDF
TE-15 - UFC 3 190 06 - Protective Coatings and Paints - 2021.pdf PDF
TE-20 - UFGS 09 01 90.50 - PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING - 2009.PDF PDF
TE-21 - UFGS 09 65 00 - Resilient Flooring - 2010.pdf PDF
TE-16 - UFGS 02 82 00 - Asbestos Remediation - 2019.pdf PDF
Solicitation Amendment W911S825BA0150001 SF 30.pdf PDF
Solicitation Questions and Answers.pdf PDF
Attachment A Task Order SOW Example.docx DOCX document
Attachment B Task Order Proposal Tech Review.xlsx XLSX spreadsheet
TE-10 General Decision Number WA20250108 (King) 06 JUNE 2025.docx DOCX document
TE-14 General Decision Number WA20250119 (Yakima) 06 June 2025.docx DOCX document
TE-07 Sustainable Acquisition Exception Form.pdf PDF
TE-09 HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
TE-04 Project Schedule Example.xlsx XLSX spreadsheet
TE-11 General Decision Number - WA20250111 (Pierce) 06 June 2025.docx DOCX document
TE-03 Contract Progress Report.pdf PDF
TE-1 Base Year Price List (Revised).xlsx XLSX spreadsheet
TE-05 Eng Form 4025-R.pdf PDF
Solicitation - W911S825BA015.pdf PDF
TE-2 Statement of Work (2025-06-06).pdf PDF
TE-06 Daily Contract Inspection Report.pdf PDF
TE-12 General Decision Number - WA20250116 (Thurston) 06 June 2025.docx DOCX document
TE-13 General Decision Number - WA20250029 (Jefferson) 06 June 2025.docx DOCX document
TE-08 Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC / NASA UFGS- 02 83 00 ( November 2018) Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS- 02 82 33. 13 20 ( August 2011) UFGS- 02 83 13. 00 20 ( August 2011) UFGS- 02 83 19. 13 10 ( Febr uar y 2010)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2019

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 83 00

LEAD REMEDIATION

11/18

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Abatement

1.2.2 Action Level

1.2.3 Area Sampling

1.2.4 Cadmium Permissible Exposure Limit (PEL)

1.2.5 Certified Industrial Hygienist (CIH)

1.2.6 Child-Occupied Facility

1.2.7 Chromium Permissible Exposure Limit (PEL)

1.2.8 Competent Person (CP)

1.2.9 Contaminated Room

1.2.10 Decontamination Shower Facility

1.2.11 Deleading

1.2.12 Eight-Hour Time Weighted Average (TWA)

1.2.13 High Efficiency Particulate Air (HEPA) Filter Equipment

1.2.14 Lead

1.2.15 Lead-Based Paint (LBP)

1.2.16 Lead-Based Paint Activities

1.2.17 Lead-Based Paint Hazards

1.2.18 Lead, Cadmium, Chromium Control Area

1.2.19 Lead Permissible Exposure Limit (PEL)

1.2.20 Material Containing Lead/Paint with Lead (MCL/PWL)

1.2.21 Personal Sampling

1.2.22 Physical Boundary

1.2.23 Target Housing

1.3 DESCRIPTION

1.3.1 Protection of Existing Areas To Remain

1.3.2 Coordination with Other Work

1.3.3 Sampling and Analysis

1.3.3.1 Dust Wipe Materials, Sampling and Analysis

1.3.3.2 Soil Sampling and Analysis

1.3.3.3 Clearance Monitoring

SECTION 02 83 00 Page 1

1.3.4 Clearance Requirements

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Qualifications

1.5.1.1 Competent Person (CP)

1.5.1.2 Training Certification

1.5.1.3 Testing Laboratory

1.5.1.4 Third Party Consultant Qualifications

1.5.1.5 Certified Risk Assessor

1.5.2 Requirements

1.5.2.1 Competent Person (CP) Responsibilities

1.5.2.2 Lead, Cadmium, Chromium Compliance Plan

1.5.2.3 Occupational and Environmental Assessment Data Report

1.5.2.4 Medical Examinations

1.5.2.5 Training

1.5.2.6 Respiratory Protection Program

1.5.2.7 Hazard Communication Program

1.5.2.8 Lead, Cadmium, Chromium Waste Management

1.5.2.9 Environmental, Safety and Health Compliance

1.5.3 Pressure Differential Recordings for Local Exhaust System

1.5.4 Licenses, Permits and Notifications

1.5.5 Occupant Protection Plan

1.5.6 Pre-Construction Conference

1.6 EQUIPMENT

1.6.1 Respirators

1.6.2 Special Protective Clothing

1.6.3 Rental Equipment Notification

1.6.4 Vacuum Filters

1.6.5 Equipment for Government Personnel

1.6.6 Abrasive Removal Equipment

1.6.7 Negative Air Pressure System

1.6.7.1 Minimum Requirements

1.6.7.2 Auxiliary Generator

1.6.8 Vacuum Systems

1.6.9 Heat Blower Guns

1.7 PROJECT/SITE CONDITIONS

1.7.1 Protection of Existing Work to Remain

PART 2 PRODUCTS

2.1 MATERIALS AND EQUIPMENT

2.1.1 Expendable Supplies

2.1.1.1 Polyethylene Bags

2.1.1.2 Polyethylene Leak-tight Wrapping

2.1.1.3 Polyethylene Sheeting

2.1.1.4 Tape and Adhesive Spray

2.1.1.5 Containers

2.1.1.6 Chemical Paint Strippers

2.1.1.7 Chemical Paint Stripper Neutralizer

2.1.1.8 Detergents and Cleaners

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Protection

3.1.1.1 Notification

3.1.1.2 Lead, Cadmium, Chromium Control Area

3.1.1.3 Furnishings

3.1.1.4 Heating, Ventilating and Air Conditioning (HVAC) Systems

SECTION 02 83 00 Page 2

3.1.1.5 Local Exhaust System

3.1.1.6 Negative Air Pressure System Containment

3.1.1.7 Decontamination Shower Facility

3.1.1.8 Eye Wash Station

3.1.1.9 Mechanical Ventilation System

3.1.1.10 Personnel Protection

3.2 ERECTION

3.2.1 Lead, Cadmium, Chromium Control Area Requirements

3.3 APPLICATION

3.3.1 Lead, Cadmium, Chromium Work

3.3.2 Paint with Lead, Cadmium, Chromium or Material Containing

Lead, Cadmium, Chromium Removal

3.3.2.1 Paint with Lead, Cadmium, Chromium or Material Containing

Lead, Cadmium, Chromium - Indoor Removal

3.3.2.2 Paint with Lead, Cadmium, Chromium or Material Containing

Lead, Cadmium, Chromium - Outdoor Removal

3.3.3 Personnel Exiting Procedures

3.4 FIELD QUALITY CONTROL

3.4.1 Tests

3.4.1.1 Air and Wipe Sampling

3.4.1.2 Sampling After Removal

3.4.1.3 Testing of Material Containing Lead, Cadmium, Chromium

Residue

3.5 CLEANING AND DISPOSAL

3.5.1 Cleanup

3.5.1.1 Clearance Certification

3.5.2 Disposal

3.5.2.1 Disposal Documentation

3.5.2.2 Payment for Hazardous Waste

-- End of Section Table of Contents --

SECTION 02 83 00 Page 3

USACE / NAVFAC / AFCEC / NASA UFGS- 02 83 00 ( November 2018) Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS- 02 82 33. 13 20 ( August 2011) UFGS- 02 83 13. 00 20 ( August 2011) UFGS- 02 83 19. 13 10 ( Febr uar y 2010)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2019

SECTION 02 83 00

LEAD REMEDIATION

11/18

NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or pr ot ect i on of wor ker s, di sposal of l ead, cadmi um and chr omi um pai nt ed mat er i al , abat ement of l ead based pai nt hazar ds i n t ar get housi ng and chi l d occupi ed f aci l i t i es and l i mi t i ng occupat i onal and envi r onment al exposur e t o l ead- based pai nt or pai nt wi t h l ead ( LBP/ PWL) .

Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .

NOTE: Thi s gui de speci f i cat i on al so pr ovi des gui del i nes/ r ecommendat i ons f or c l eanup of l ead, cadmi um and chr omi um on const r uct i on pr oj ect s i mpact i ng mat er i al cont ai ni ng l ead, cadmi um and chr omi um or l ead based pai nt .

NOTE: Obt ai n pr oj ect speci f i c i nf or mat i on and appr opr i at e sampl i ng of Pai nt wi t h Lead ( PWL) or Mat er i al Cont ai ni ng Lead ( MCL) t hat wi l l be r emoved or di st ur bed.

SECTION 02 83 00 Page 4

NOTE: Thi s gui de speci f i cat i on can be used i n pr oj ect s wher e LBP/ PWL must be r emoved/ cont r ol l ed ( i ncl udi ng pai nt f i l m st abi l i zat i on) or l ead- based pai nt hazar ds abat ed as def i ned by Publ i c Law 102- 550 Ti t l e X - Resi dent i al Lead- Based Pai nt Hazar d Reduct i on Act of 1992. Local r equi r ement s may be subst ant i al l y r est r i ct i ve f or t he conduct i on of LBP or LBP hazar d abat ement pr oj ect s.

NOTE: Thi s gui de speci f i cat i on shoul d be used wi t h al l of t he r equi r ement s of 40 CFR 745 ( or st at e/ l ocal r equi r ement s i n st at es wi t h aut hor i zed pr ogr ams) f or pr oj ect s i nvol v i ng l ead- based pai nt hazar d abat ement i n t ar get housi ng and chi l d occupi ed f aci l i t i es bei ng t r ansf er r ed or r esol v i ng f aci l i t y- r el at ed wor k due t o an occupant chi l d wi t h an el evat ed bl ood l ead. I n t hese pr oj ect s, i t i s r equi r ed t hat t he speci f i cat i on edi t or has appr opr i at e t r ai ni ng r egar di ng l ead- based pai nt act i v i t i es. Cer t i f i cat i on as a pr oj ect desi gner per 40 CFR 745 i s r equi r ed.

NOTE: The cl assi f i cat i on of t he l ead- based pai nt or pai nt wi t h l ead as hazar dous wast e must be per f or med i n accor dance wi t h 40 CFR 261, and i n t he desi gn phase of t he pr oj ect . Thi s c l assi f i cat i on i s pr er equi s i t e t o t he r equi r ement of speci al handl i ng, st or age, and di sposal accor di ng t o Feder al , st at e and l ocal hazar dous wast e management r egul at i ons.

NOTE: When hi st or i c pr eser vat i on wor k wi l l di st ur b PWL, r ef er t o t he Secr et ar y of t he I nt er i or ' s St andar ds f or t he Tr eat ment of Hi st or i c Pr oper t i es and Br i ef 37, " Appr opr i at e Met hods f or Reduci ng Lead- Pai nt Hazar ds i n Hi st or i c Housi ng" as appropriate.

NOTE: The wor k may i nvol ve a hi st or i c pr oper t y. The desi gner must coor di nat e r evi ew of t he pr oposed wor k wi t h t he appr opr i at e cul t ur al r esour ces manager ( CRM) and cul t ur al r esour ce l aws and r egul at i ons, as par t of t he envi r onment al r evi ew and per mi t t i ng pr ocess. Consul t at i on wi t h st akehol der s, i ncl udi ng t he st at e hi st or i c pr eser vat i on of f i ce, may be r equi r ed, and wor k i nvol v i ng hi st or i c pr oper t i es wi l l l i kel y be r equi r ed t o conf i r m t o t he Secr et ar y of t he I nt er i or ' s St andar ds f or t he Tr eat ment of Hi st or i c Pr oper t i es ( usual l y at t he REHABI LI TATI ON

SECTION 02 83 00 Page 5 l evel ) . See https://www.nps.gov/tps/standards/four-treatments/treatment-rehabilitation.htm .

NOTE: Pr oj ect s i nvol v i ng housi ng i mpr ovement , mai nt enance, or r epai r ar e not consi der ed a l ead- based pai nt hazar d abat ement act i on even i f t he ef f ect of t he wor k r emoves ( or r educes) l ead exposur e pot ent i al s t o t he occupant s. However , appr opr i at e pr ecaut i ons f or pr ot ect i ng occupant s and l eavi ng t he housi ng cl ean ( c l ear ance) af t er concl udi ng any wor k di st ur bi ng l ead must be consi der ed. Speci f i c t r ai ni ng and cer t i f i cat i on r equi r ement s ( 40 CFR 745 or aut hor i zed st at e pr ogr am r equi r ement s) may not be necessar y f or al l pr oj ect s.

However , i t i s st r ongl y r ecommended t hat t he speci f i cat i on edi t or have appr opr i at e t r ai ni ng r egar di ng l ead.

NOTE: Pr oj ect s t hat i nvol ve cut t i ng, sawi ng, sandi ng, scr api ng, needl e gunni ng, abr asi ve bl ast i ng, hi gh t emper at ur e r emoval , of l ead- based pai nt / pai nt wi t h l ead and pai nt s cont ai ni ng cadmi um and chr omi um mat er i al s may r esul t i n exposur es i n excess of OSHA l i mi t s. Ther ef or e, per sonal pr ot ect i ve equi pment shoul d be used and cont r ol s i mpl ement ed. I nst i t ut e wor ker pr ot ect i on cont r ol s as i ndi cat ed i n 29 CFR 1926. 62, 29 CFR 1926. 1126, 29 CFR 1926. 1127 and her ei n. Al so, some wor k pr act i ces ar e pr ohi bi t ed f or LBP/ LBP hazar d abat ement ( e. g. , machi ne sandi ng, abr asi ve bl ast i ng) unl ess used wi t h HEPA exhaust cont r ol s ( see 40 CFR 745. 227) .

NOTE: To assur e pr ot ect i on of wor ker s and pr oper di sposal of l ead, cadmi um and chr omi um based pai nt , t hi s gui de speci f i cat i on i s t o be used t oget her wi t h Section 01 35 26 GOVERNMENT SAFETY REQUI REMENTS.

Thi s gui de speci f i cat i on i s not t o be used f or r emoval of l ead- based pai nt f r om hydr aul i c st r uct ur es, st eel st r uct ur es, or ot her s i mi l ar st r uct ur es. For t hese t ypes of st r uct ur es, t he desi gner shoul d use Sect i on 09 97 02 PAI NTI NG:

HYDRAULI C STRUCTURES.

PART 1 GENERAL

1.1 REFERENCES

NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de

SECTION 02 83 00 Page 6 speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out si de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems

ASTM INTERNATIONAL (ASTM)

ASTM E1613 (2012) Standard Test Method for Determination of Lead by Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES), Flame Atomic Absorption Spectrometry (FAAS), or Graphite Furnace Atomic Absorption Spectrometry (GFAAS) Techniques

ASTM E1644 (2017) Standard Practice for Hot Plate Digestion of Dust Wipe Samples for the Determination of Lead

ASTM E1726 (2001; R 2009) Preparation of Soil Samples by Hotplate Digestion for Subsequent Lead Analysis

ASTM E1727 (2016) Standard Practice for Field Collection of Soil Samples for Subsequent Lead Determination

ASTM E1728 (2016) Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Lead Determination

ASTM E1792 (2003; R 2016) Standard Specification for Wipe Sampling Materials for Lead in Surface Dust

SECTION 02 83 00 Page 7

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)

HUD 6780 (1995; Errata Aug 1996;Rev Ch. 7 - 1997) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926.21 Safety Training and Education

29 CFR 1926.33 Access to Employee Exposure and Medical Records

29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists

29 CFR 1926.59 Hazard Communication

29 CFR 1926.62 Lead

29 CFR 1926.65 Hazardous Waste Operations and Emergency Response

29 CFR 1926.103 Respiratory Protection

29 CFR 1926.1126 Chromium

29 CFR 1926.1127 Cadmium

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 268 Land Disposal Restrictions

SECTION 02 83 00 Page 8

40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 178 Specifications for Packagings

U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)

ND OPNAVINST 5100.23 (2005; Rev G) Navy Occupational Safety and Health (NAVOSH) Program Manual

UNDERWRITERS LABORATORIES (UL)

UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units

1.2 DEFINITIONS

1.2.1 Abatement

Measures defined in 40 CFR 745 , Section 223, designed to permanently eliminate lead-based paint hazards.

1.2.2 Action Level

Employee exposure, without regard to use of respirators, to an airborne concentration of lead of 30 micrograms per cubic meter of air averaged over an 8-hour period; to an airborne concentration of cadmium of 2.5 micrograms per cubic meter of air averaged over an 8-hour period; to an airborne concentration of chromium (VI) of 2.5 micrograms per cubic meter of air averaged over an 8-hour period.

1.2.3 Area Sampling

Sampling of lead, cadmium, chromium concentrations within the lead, cadmium, chromium control area and inside the physical boundaries which is representative of the airborne lead, cadmium, chromium concentrations but is not collected in the breathing zone of personnel (approximately 1.5 to

1.8 meters 5 to 6 feet above the floor).

1.2.4 Cadmium Permissible Exposure Limit (PEL)

Five micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1926.1127 . If an employee is exposed for more than 8-hours in a work day, determine the PEL by the following formula:

PEL (micrograms/cubic meter of air) = 40/No. hrs worked per day

1.2.5 Certified Industrial Hygienist (CIH)

As used in this section refers to a person retained by the Contractor who is certified as an industrial hygienist and who is trained in the recognition and control of lead, cadmium and chromium hazards in accordance with current federal, State, and local regulations. CIH must

SECTION 02 83 00 Page 9 be certified for comprehensive practice by the American Board of Industrial Hygiene. The Certified Industrial Hygienist must be independent of the Contractor and must have no employee or employer relationship which could constitute a conflict of interest.

1.2.6 Child-Occupied Facility

Real property which is a building or portion of a building constructed prior to 1978 visited regularly by the same child, six-years of age or under, on at least two different days within any week (Sunday through Saturday period), provided that each day's visit lasts at least 3-hours, and the combined annual visits last at least 60-hours. Child-occupied facilities include but are not limited to, day-care centers, preschools and kindergarten classrooms.

1.2.7 Chromium Permissible Exposure Limit (PEL)

Five micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1926.1126 . If an employee is exposed for more than 8-hours in a work day, determine the PEL by the following formula:

PEL (micrograms/cubic meter of air) = 40/No. hrs worked per day

1.2.8 Competent Person (CP)

As used in this section, refers to a person employed by the Contractor who is trained in the recognition and control of lead, cadmium and chromium hazards in accordance with current federal, State, and local regulations and has the authority to take prompt corrective actions to control the lead, cadmium and chromium hazard. The Contractor may provide more than one CP as required to supervise and monitor the work. The CP must be a Certified Industrial Hygienist (CIH) certified by the American Board of Industrial Hygiene or a Certified Safety Professional (CSP) certified by the Board of Certified Safety Professionals or a licensed lead-based paint abatement Supervisor/Project Designer in the State of [_____].

1.2.9 Contaminated Room

Refers to a room for removal of contaminated personal protective equipment

(PPE).

1.2.10 Decontamination Shower Facility

That facility that encompasses a clean clothing storage room, and a contaminated clothing storage and disposal rooms, with a shower facility in between.

1.2.11 Deleading

Activities conducted by a person who offers to eliminate lead-based paint or lead-based paint hazards or paints containing cadmium/chromium or to plan such activities in commercial buildings, bridges or other structures.

1.2.12 Eight-Hour Time Weighted Average (TWA)

Airborne concentration of lead, cadmium, chromium to which an employee is exposed, averaged over an 8-hour workday as indicated in 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 .

SECTION 02 83 00 Page 10

1.2.13 High Efficiency Particulate Air (HEPA) Filter Equipment

HEPA filtered vacuuming equipment with a UL 586 filter system capable of collecting and retaining lead, cadmium, chromiumcontaminated particulate.

A high efficiency particulate filter demonstrates at least 99.97 percent efficiency against 0.3 micron or larger size particles.

1.2.14 Lead

Metallic lead, inorganic lead compounds, and organic lead soaps. Excludes other forms of organic lead compounds. The use of the term Lead in this section also refers to paints which contain detectable concentrations of Cadmium and Chromium. For the purposes of the section lead-based paint (LBP) and paint with lead (PWL) also contains cadmium and chromium.

1.2.15 Lead-Based Paint (LBP)

Paint or other surface coating that contains lead in excess of 1.0 milligrams per centimeter squared or 0.5 percent by weight.

1.2.16 Lead-Based Paint Activities

In the case of target housing or child occupied facilities, lead-based paint activities include; a lead-based paint inspection, a risk assessment, or abatement of lead-based paint hazards.

1.2.17 Lead-Based Paint Hazards

Paint-lead hazard, dust-lead hazard or soil-lead hazard as identified in 40 CFR 745 , Section 65. Any condition that causes exposure to lead from lead-contaminated dust, lead-contaminated soil, lead-based paint that is deteriorated or present in accessible surfaces, friction surfaces, or impact surfaces that would result in adverse human health effects.

1.2.18 Lead, Cadmium, Chromium Control Area

A system[ of control methods] to prevent the spread of lead, cadmium, chromium dust, paint chips or debris to adjacent areas that may include temporary containment, floor or ground cover protection, physical boundaries, and warning signs to prevent unauthorized entry of personnel.

HEPA filtered local exhaust equipment may be used as engineering controls to further reduce personnel exposures or building/outdoor environmental contamination.

1.2.19 Lead Permissible Exposure Limit (PEL)

Fifty micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1926.62 . If an employee is exposed for more than 8-hours in a work day, determine the PEL by the following formula:

PEL (micrograms/cubic meter of air) = 400/No. hrs worked per day

1.2.20 Material Containing Lead/Paint with Lead (MCL/PWL)

Any material, including paint, which contains lead as determined by the testing laboratory using a valid test method. The requirements of this section does not apply if no detectable levels of lead are found using a quantitative method for analyzing paint or MCL using laboratory instruments with specified limits of detection (usually 0.01 percent). An

SECTION 02 83 00 Page 11

X-Ray Fluorescence (XRF) instrument is not considered a valid test method.

1.2.21 Personal Sampling

Sampling of airborne lead, cadmium, chromium concentrations within the breathing zone of an employee to determine the 8-hour time weighted average concentration in accordance with 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 . Samples must be representative of the employees' work tasks. Breathing zone must be considered an area within a hemisphere, forward of the shoulders, with a radius of 150 to 225 mm 6 to 9 inches and centered at the nose or mouth of an employee.

1.2.22 Physical Boundary

Area physically roped or partitioned off around lead, cadmium, chromium control area to limit unauthorized entry of personnel.

1.2.23 Target Housing

Residential real property which is housing constructed prior to 1978, except housing for the elderly or persons with disabilities (unless any one or more children age 6-years or under resides or is expected to reside in such housing for the elderly or persons with disabilities) or any zero bedroom dwelling.

1.3 DESCRIPTION

NOTE: Speci f y t he const r uct i on act i v i t i es t hat wi l l i mpact l ead, cadmi um and chr omi um based pai nt or l ead cont ai ni ng mat er i al . Show t he l ocat i on of MCL/ PWL i mpact ed const r uct i on act i v i t i es on t he cont r act dr awi ngs and i ndi cat e i t s condi t i on ( wel l adher ed sheet s or wr appi ngs, sol i d, aggr egat es, br i cks or bl ocks, powder ed, l i qui d, s l udge) .

Exampl e act i v i t i es i ncl ude: pr epar i ng sur f aces f or pai nt i ng, saw cut t i ng t hr ough pai nt ed mat er i al , sandi ng pai nt ed sur f aces, scabbl i ng pai nt ed or ot her wi se l eaded concr et e sur f aces, bl ast c l eani ng pai nt ed sur f aces, t or ch cut t i ng t hr ough pai nt ed metal.

Construction activities impacting PWL or material containing lead, cadmium, chromium which are covered by this specification include the demolition or removal of material containing lead, cadmium, chromium in [_____] condition, located [_____] and as indicated on the drawings.

[_____] The work covered by this section includes work tasks and the precautions specified in this section for the protection of building occupants and the environment during and after the performance of the hazard abatement activities.

1.3.1 Protection of Existing Areas To Remain

Project work including, but not limited to, lead, cadmium, chromium hazard abatement work, storage, transportation, and disposal must be performed without damaging or contaminating adjacent work and areas. Where such work or areas are damaged or contaminated, restore work and areas to the original condition.

SECTION 02 83 00 Page 12

1.3.2 Coordination with Other Work

Coordinate with work being performed in adjacent areas to ensure there are no exposure issues. Explain coordination procedures in the Lead, Cadmium, Chromium Compliance Plan and describe how the Contractor will prevent lead, cadmium and chromium exposure to other contractors and Government personnel performing work unrelated to lead, cadmium and chromium activities.

1.3.3 Sampling and Analysis

NOTE: Speci f y t he sampl i ng and anal ysi s necessar y t o char act er i ze ef f ect i veness of equi pment and pr ocedur es t o pr event mi gr at i on of cont ami nat i on whi l e l ead, cadmi um and chr omi um and l ead hazar d abat ement act i v i t i es ar e per f or med and t o assur e c l ear ance/ cl eanup r equi r ement s have been achi eved.

Sel ect f r om t he met hods bel ow t o speci f y t he sampl i ng and anal yt i cal r equi r ement s f or t hi s project.

Submit a log of the analytical results from sampling conducted during the abatement. Keep the log of results current with project activities and brief the results to the Contracting Officer as analytical results are reported.

1.3.3.1 Dust Wipe Materials, Sampling and Analysis

Sampling must conform to [[ ASTM E1728][ ASTM E1792]].[ Analysis must conform to ASTM E1613 and ASTM E1644.]

1.3.3.2 Soil Sampling and Analysis

Sampling must conform to ASTM E1727.[ Analysis must conform to ASTM E1613 and ASTM E1726.]

1.3.3.3 Clearance Monitoring

NOTE: Revi ew 40 CFR 745 ( e) ( 8) ( v) ( A) , ( B) and ( C) t o det er mi ne t he quant i t y and l ocat i on of c l ear ance sampl es f or t ar get housi ng, chi l d occupi ed facilities.

a. Collect dust wipe samples inside the lead, cadmium and chromium hazard control area after the final visual inspection in the quantities and at the locations specified.

(1) Floors [_____].

(2) Interior Window Sills [_____].

(3) Window Troughs [_____].

b. Collect exterior bare soil samples inside the lead, cadmium and chromium hazard control area after the final visual inspection in the

SECTION 02 83 00 Page 13 quantities and at the locations specified.

(1) Near the building foundation [_____].

(2) Nearby Play areas [_____].

1.3.4 Clearance Requirements

NOTE: Cl ear ance cr i t er i a ar e as f ol l ows:

Tar get housi ng and chi l d occupi ed f aci l i t i es.

a) Bui l di ng I nt er i or :

Fl oor s - 40 mi cr ogr ams/ squar e f oot .

I nt er i or Wi ndow Si l l s - 250 mi cr ogr ams/ squar e f oot .

Wi ndow Tr oughs - 800 mi cr ogr ams/ squar e f oot .

b) Bui l di ng Ext er i or :

Bar e soi l s i n pl ay ar eas used by chi l dr en under t he age of 6 - 400 mg/ kg.

Bar e soi l s, al l ot her ar eas - 1200 mg/ kg

I t i s r ecommended t hat t he desi gner check wi t h t he pr oj ect cust omer and st at e r egul at or s t o assur e t hat t he c l ear ance cr i t er i a i n t hi s not e ar e consi st ent wi t h cust omer needs and st at e speci f i c r equi r ement s.

Target housing and child occupied facilities clearance levels.

(1) Floors [_____].

(2) Interior Window Sills [_____].

(3) Window Troughs [_____].

(4) Bare soils in play areas accessible by children [_____].

(5) Bare soils in all other areas [_____].

1.4 SUBMITTALS

NOTE: Revi ew Submi t t al Descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .

The Gui de Speci f i cat i on t echni cal edi t or s have desi gnat ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a " G" t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For submi t t al s r equi r i ng Gover nment appr oval on Ar my pr oj ect s, a code of up t o t hr ee char act er s wi t hi n t he submi t t al t ags may be used f ol l owi ng t he " G" desi gnat i on t o i ndi cat e t he appr ovi ng aut hor i t y.

SECTION 02 83 00 Page 14

Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

The " S" f ol l owi ng a submi t t al i t em i ndi cat es t hat t he submi t t al i s r equi r ed f or t he Sust ai nabi l i t y eNot ebook t o f ul f i l l f eder al l y mandat ed sust ai nabl e r equi r ement s i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Locat e t he " S" submi t t al under t he SD number t hat best descr i bes t he submi t t al i t em.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are [for Contractor Quality Control approval.][for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Competent Person Qualifications; G[, [_____]]

Training Certification ; G[, [_____]]

Occupational and Environmental Assessment Data Report ; G[, [_____]]

Medical Examinations ; G[, [_____]]

Lead, Cadmium, Chromium Waste Management Plan ; G[, [_____]]

Licenses, Permits and Notifications ; G[, [_____]]

Occupant Protection Plan ; G[, [_____]]

Lead, Cadmium, Chromium Compliance Plan ; G[, [_____]]

[ Initial Sample Results ; G[, [_____]]

] Written Evidence of TSD Approval ; G[, [_____]]

SD-03 Product Data

Respirators ; G[, [_____]]

Vacuum Filters ; G[, [_____]]

SECTION 02 83 00 Page 15

Negative Air Pressure System ; G[, [_____]]

Materials and Equipment ; G[, [_____]]

Expendable Supplies ; G[, [_____]]

Local Exhaust Equipment ; G[, [_____]]

Pressure Differential Automatic Recording Instrument ; G[, [_____]]

Pressure Differential Log ; G[, [_____]]

SD-06 Test Reports

Sampling and Analysis ; G[, [_____]]

Occupational and Environmental Assessment Data Report ; G[, [_____]]

Sampling Results ; G[, [_____]]

Pressure Differential Recordings For Local Exhaust System ; G[, SD-07 Certificates

Testing Laboratory ; G[, [_____]]

[ Third Party Consultant Qualifications ; G[, [_____]]

][ Occupant Notification ; G[, [_____]]

][ Notification of the Commencement of [LBP] Hazard Abatement ; G[, NOTE: See Cr i t er i a Not es i n par agr aphs AI R AND WI PE SAMPLI NG and CLEARANCE CERTI FI CATI ON t o det er mi ne whet her t hese i t ems shoul d be i ncl uded i n t he project.

Clearance Certification ; G[, [_____]]

SD-11 Closeout Submittals

Hazardous Waste Manifest ; G[, [_____]]

[ Turn-In Documents or Weight Tickets ; G[, [_____]]

] 1.5 QUALITY ASSURANCE

1.5.1 Qualifications

1.5.1.1 Competent Person (CP)

Submit name, address, and telephone number of the CP selected to perform responsibilities specified in paragraph COMPETENT PERSON (CP) RESPONSIBILITIES. Provide documented construction project-related experience with implementation of OSHA's Lead in Construction standard (

SECTION 02 83 00 Page 16

29 CFR 1926.62 ), Chromium standard ( 29 CFR 1926.1126 ), Cadmium standard ( 29 CFR 1926.1127 ) which shows ability to assess occupational and environmental exposure to lead, cadmium, chromium; experience with the use of respirators, personal protective equipment and other exposure reduction methods to protect employee health. Demonstrate a minimum of [3][5][_____] years experience implementing OSHA's Lead in Construction standard ( 29 CFR 1926.62 ), Chromium standard ( 29 CFR 1926.1126 ), and Cadmium standard ( 29 CFR 1926.1127 ). Submit proper documentation that the CP is trained [and licensed][and certified] in accordance with federal, State [_____] and local laws.[ The competent person must be a licensed lead-based paint abatement Supervisor/Project Designer in the State of

1.5.1.2 Training Certification

NOTE: St at e or l ocal r egul at i ons may consi der l ead, cadmi um and chr omi um, LBP/ PWL or MCL r emoval wor k as " l ead based pai nt hazar d r educt i on act i v i t i es" even i f t he wor k does not i ncl ude l ead based pai nt . The t r ai ni ng pr ovi der may be r equi r ed t o be " accr edi t ed" by ei t her t he St at e or t he Uni t ed St at es Envi r onment al Pr ot ect i on Agency ( USEPA) .

Submit a certificate for each worker and supervisor, signed and dated by the[ accredited] training provider, stating that the employee has received the required lead, cadmium and chromium training specified in 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 [ 40 CFR 745 ] [ and is certified to perform or supervise deleading, lead removal or demolition activities][ in the State of [_____]].

1.5.1.3 Testing Laboratory

Submit the name, address, and telephone number of the testing laboratory selected to perform the air[ soil][ and wipe] analysis, testing, and reporting of airborne concentrations of lead, cadmium and chromium. Use a laboratory participating in the EPA National Lead Laboratory Accreditation Program (NLLAP) by being accredited by either the American Association for Laboratory Accreditation (A2LA) or the American Industrial Hygiene Association (AIHA) and that is successfully participating in the Environmental Lead Proficiency Analytical Testing (ELPAT) program to perform sample analysis. Laboratories selected to perform blood lead analysis must be OSHA approved.

[ 1.5.1.4 Third Party Consultant Qualifications

NOTE: See Cr i t er i a Not es i n par agr aphs AI R AND WI PE SAMPLI NG and CLEARANCE CERTI FI CATI ON t o det er mi ne whet her t hi s par agr aph shoul d be i ncl uded i n t he project.

Submit the name, address and telephone number of the third party consultant selected to perform the wipe sampling for determining concentrations of lead, cadmium and chromium in dust. Submit proper documentation that the consultant is trained and certified as an inspector technician or inspector/risk assessor by the USEPA authorized State (or

SECTION 02 83 00 Page 17 local) certification and accreditation program.

] 1.5.1.5 Certified Risk Assessor

The Certified Risk Assessor must be certified pursuant to 40 CFR 745 , Section 226 and be responsible to perform the clearance sampling, clearance sample data evaluation and summarize clearance sampling results in a section of the abatement report. The risk assessor must sign the abatement report to indicate clearance requirements for the contract have been met.

1.5.2 Requirements

1.5.2.1 Competent Person (CP) Responsibilities

a. Verify training meets all federal, State, and local requirements.

b. Review and approve Lead, Cadmium, Chromium Compliance Plan for conformance to the applicable referenced standards.

c. Continuously inspect LBP/PWL or MCL work for conformance with the approved plan.

d. Perform (or oversee performance of) air sampling. Recommend upgrades or downgrades (whichever is appropriate based on exposure) on the use of PPE (respirators included) and engineering controls.

e. Ensure work is performed in strict accordance with specifications at all times.

f. Control work to prevent hazardous exposure to human beings and to the environment at all times.

g. Supervise final cleaning of the lead, cadmium, chromium control area, take clearance wipe samples if necessary; review clearance sample results and make recommendations for further cleaning.

h. Certify the conditions of the work as called for elsewhere in this specification.

i. The CP must be certified pursuant to 40 CFR 745 , Section 226 and is responsible for development and implementation of the occupant protection plan, the abatement report and supervise lead, cadmium and chromium hazard abatement work activities.

1.5.2.2 Lead, Cadmium, Chromium Compliance Plan

NOTE: St at e or l ocal r egul at i ons may have speci f i c r equi r ement s f or wr i t t en pr oj ect desi gns. Resear ch speci f i c St at e or l ocal r equi r ement s f or publ i c, commer ci al bui l di ngs or st r uct ur es. Consi der t he br acket ed occupant pr ot ect i on pl an f or hi gh pr of i l e sensi t i ve wor k such as pr esent i n f ami l y housi ng, chi l dcar e f aci l i t i es, admi ni st r at i ve bui l di ngs, kitchens.

Submit a detailed job-specific plan of the work procedures to be used in

SECTION 02 83 00 Page 18 the disturbance of lead, cadmium and chromium, LBP/PWL or MCL. Include in the plan a sketch showing the location, size, and details of lead, cadmium, chromium control areas, critical barriers, physical boundaries, location and details of decontamination facilities, viewing ports, and mechanical ventilation system. Include a description of equipment and materials, work practices, controls and job responsibilities for each activity from which lead, cadmium, chromium is emitted. Include in the plan, eating, drinking, smoking, hygiene facilities and sanitary procedures, interface of trades, sequencing of lead, cadmium, chromium related work, collected waste water and dust containing lead, cadmium, chromium and debris, air sampling, respirators, personal protective equipment, and a detailed description of the method of containment of the operation to ensure that lead, cadmium, chromium is not released outside of the lead, cadmium, chromium control area. Include site preparation, cleanup and clearance procedures. Include occupational and environmental sampling, training and strategy, sampling and analysis strategy and methodology, frequency of sampling, duration of sampling, and qualifications of sampling personnel in the air sampling portion of the plan. Include a description of arrangements made among contractors on multicontractor worksites to inform affected employees and to clarify responsibilities to control exposures.

[ The plan must be developed and signed by a certified Lead Project Designer in the State of [_____]. The plan must include the name and certification number of the person signing the plan.

][ In occupied buildings, the plan must also include an occupant protection program that describes the measures that will be taken during the work to[ notify and] protect the building occupants.

] 1.5.2.3 Occupational and Environmental Assessment Data Report

NOTE: Sampl i ng r esul t s of pr evi ous j obs or i ni t i al moni t or i ng dur i ng t he j ob det er mi ne t he r equi r ement s f or f ur t her moni t or i ng and t he need t o f ul l y i mpl ement t he cont r ol and pr ot ect i ve r equi r ement s.

Some LBP/ PWL or MCL wor k may not r equi r e f ul l i mpl ement at i on of t he r equi r ement s of 29 CFR 1926. 62. Based on t he exper i ence of t he Cont r act or or t he use of a speci f i c pr ocess or met hod f or per f or mi ng t he wor k, t he Cont r act or may be abl e t o pr ovi de hi st or i c dat a ( pr evi ous 12 mont hs) t o demonst r at e t hat ai r bor ne exposur es ar e cont r ol l ed bel ow t he act i on l evel . Such met hods or cont r ol s must be f ul l y pr esent ed i n t he Lead, Cadmi um, Chr omi um Compl i ance Pl an.

If initial monitoring is necessary, submit occupational and environmental sampling results to the Contracting Officer within three working days of collection, signed by the testing laboratory employee performing the analysis, the employee that performed the sampling, and the CP.

[ In order to reduce the full implementation of 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 the Contractor must provide documentation. Submit a report that supports the determination to reduce full implementation of the requirements of 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 and supporting the Lead, Cadmium, Chromium Compliance

SECTION 02 83 00 Page 19

Plan.

] a. The initial monitoring must represent each job classification, or if working conditions are similar to previous jobs by the same employer, provide previously collected exposure data that can be used to estimate worker exposures per 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 . The data must represent the worker's regular daily exposure to lead, cadmium, chromium for stated work.

b. Submit worker exposure data gathered during the task based trigger operations of 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 with a complete process description. This includes manual demolition, manual scraping, manual sanding, heat gun, power tool cleaning, rivet busting, cleanup of dry expendable abrasives, abrasive blast enclosure removal, abrasive blasting, welding, cutting and torch burning where lead, cadmium and chromium containing coatings are present.

c. The initial assessment must determine the requirement for further monitoring and the need to fully implement the control and protective requirements including the lead, cadmium, chromium compliance plan per

29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 .

1.5.2.4 Medical Examinations

Submit pre-work blood lead levels and post-work blood lead levels for all workers performing lead, cadmium, chromium activities during the execution of the work. Initial medical surveillance as required by 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 must be made available to all employees exposed to lead, cadmium, chromium at any time (one day) above the action level. Full medical surveillance must be made available to all employees on an annual basis who are or may be exposed to lead, cadmium and chromium in excess of the action level for more than 30 days a year or as required by 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 . Adequate records must show that employees meet the medical surveillance requirements of 29 CFR 1926.33 , 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 and 29 CFR 1926.103 . Provide medical surveillance to all personnel exposed to lead, cadmium, chromium as indicated in 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 . Maintain complete and accurate medical records of employees for the duration of employment plus 30 years.

1.5.2.5 Training

Train each employee performing work that disturbs lead, cadmium, chromium, who performs LBP/MCL/PWL disposal, and air sampling operations prior to the time of initial job assignment and annually thereafter, in accordance with 29 CFR 1926.21 , 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 , 40 CFR 745 and State [_____] and local regulations where appropriate.

1.5.2.6 Respiratory Protection Program

a. Provide each employee required to wear a respirator a respirator fit test at the time of initial fitting and at least annually thereafter as required by 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 .

b. Establish and implement a respiratory protection program as required by 29 CFR 1926.103 , 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 and 29 CFR 1926.55 .

SECTION 02 83 00 Page 20

1.5.2.7 Hazard Communication Program

Establish and implement a Hazard Communication Program as required by

29 CFR 1926.59 .

1.5.2.8 Lead, Cadmium, Chromium Waste Management

NOTE: Resear ch l ocal r equi r ement s. The EPA has cl ar i f i ed wast e r equi r ement s wher e l ead- based pai nt debr i s gener at ed by cont r act or s i n househol ds i s excl uded f r om RCRA Subt i t l e C hazar dous wast e r egul at i ons. Cont r act or s may di spose of LBP- wast es as househol d wast es subj ect t o appl i cabl e St at e r egul at i ons. Det er mi nat i on of t he expect ed wast e mat er i al s as hazar dous or sol i d wast e f or di sposal shoul d be per f or med i n conj unct i on wi t h s i t e wor k.

Some const r uct i on wast e cont ai ns l ead at l ower concent r at i ons, whi ch may be di sposed of at l ocal sani t ar y l andf i l l s or Const r uct i on and Demol i t i on ( C&D) l andf i l l s , whi ch ar e not appr oved by EPA.

The Lead, Cadmium, Chromium Waste Management Plan must comply with applicable requirements of federal, State, and local hazardous waste regulations and address:

a. Identification and classification of wastes associated with the work.

b. Estimated quantities of wastes to be generated and disposed of.

c. Names and qualifications of each contractor that will be transporting, storing, treating, and disposing of the wastes. Include the facility location[ and operator] and a 24-hour point of contact. Furnish two copies of [USEPA] [State (in accordance with [_____])][ and ][local] hazardous waste [permit applications][permits][manifests][ and ][USEPA Identification numbers].

d. Names and qualifications (experience and training) of personnel who will be working on-site with hazardous wastes.

e. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.

f. Spill prevention, containment, and cleanup contingency measures including a health and safety plan to be implemented in accordance with 29 CFR 1926.65 .

g. Work plan and schedule for waste containment, removal and disposal.

Proper containment of the waste includes using acceptable waste containers (e.g., 55-gallon drums) as well as proper marking/labeling of the containers. Clean up and containerize wastes daily.

h. Include any process that may alter or treat waste rendering a hazardous waste non hazardous.

i. Unit cost for hazardous waste disposal according to this plan.

SECTION 02 83 00 Page 21

1.5.2.9 Environmental, Safety and Health Compliance

NOTE: I ncl ude appl i cabl e St at e, r egi onal , and l ocal l aws, r egul at i ons, and st at ut es. Do car ef ul r esear ch si nce not al l St at e and l ocal l aws ar e s i mi l ar . Ver i f y wi t h t he St at e or l ocal aut hor i t i es whet her t he c i t y, count y, St at e or t he USEPA has j ur i sdi ct i on and whet her l i censi ng or cer t i f i cat i on i s r equi r ed. Al so i dent i f y t he aut hor i t y or code sponsor and t he l aws, r egul at i ons and st at ut es c i t ed under par agr aph REFERENCES usi ng compl et e t i t l e and number.

In addition to the detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, State, and local authorities regarding lead, cadmium and chromium. Comply with the applicable requirements of the current issue of 29 CFR 1926.62 , 29 CFR 1926.1126 , 29 CFR 1926.1127 , EM 385-1-1 , ND OPNAVINST 5100.23 .

Submit matters regarding interpretation of standards to the Contracting Officer for resolution before starting work. Where specification requirements and the referenced documents vary, the most stringent requirements apply. The following [local][ and ][State] laws, ordinances, criteria, rules and regulations regarding removing, handling, storing, transporting, and disposing of lead, cadmium and chromium-contaminated materials apply:

a. [_____]

b. [_____]

c. [_____]

[ [Licensing][ and certification] in the state of [_____] is required.

] 1.5.3 Pressure Differential Recordings for Local Exhaust System

NOTE: When an negat i ve pr essur e encl osur e i s not r equi r ed, del et e t he r equi r ement s f or t he l ocal exhaust syst em and pr essur e di f f er ent i al r ecor di ng.

NOTE: Nor mal pr act i ce i s t o have t he Cont r act or hi r e one i ndependent Pr i vat e Qual i f i ed Per son ( t he PQP) t o per f or m al l r equi r ed f unct i ons. However , some appl i cabl e l aws f or bi d t hi s appr oach and wi l l di ct at e when t he PQP, t he GC or bot h wi l l be r equi r ed t o per f or m t he f unct i on i nvol ved. However , t he Cont r act or must al ways hi r e a PQP.

Provide a local exhaust system that creates a negative pressure of at least

0.51 mm 0.02 inches of water relative to the pressure external to the enclosure and operate it continuously, 24-hours a day, until the temporary enclosure of the lead, cadmium, chromium control area is removed. Submit pressure differential recordings for each work day to the [PQP][ and ][GC]

SECTION 02 83 00 Page 22 for review and to the Contracting Officer within 24-hours from the end of each work day.

1.5.4 Licenses, Permits and Notifications

NOTE: Consul t wi t h t he cust omer , di st r i ct engi neer i ng, const r uct i on and saf et y of f i ces and al l out s i de r egul at or y aut hor i t i es ( EPA, st at e, count y, c i t y) havi ng j ur i sdi ct i on over any par t of t he pr oj ect t o det er mi ne whet her a l i cense or per mi t i s r equi r ed and who i s r esponsi bl e f or submi t t i ng r equi r ed not i f i cat i ons t o var i ous agenci es. The desi gner t hen must make t he deci s i on i f t he r equi r ed per mi t s ar e t o be obt ai ned by t he Cont r act or or t he Gover nment . I f t he Cont r act or i s t o pr ovi de t he per mi t s, i ncl ude t hi s par agr aph and choose t he appr opr i at e br acket ed i t ems. I f t he Gover nment i s t o obt ai n t he per mi t s/ l i censes, del et e t hi s ent i r e paragraph.

Certify and submit in writing to the [Regional Office of the EPA] [state's environmental protection agency responsible for lead hazard abatement activities] [_____] [and the Contracting Officer] at least [10] [_____] days prior to the commencement of work that [_____]…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .